Show Job Controls
Bid Cobra

TAYLOR FM 3438 (2270-01-029)

Items: 28

County: TAYLOR
Length: 0.0000 MILES
Highway: FM 3438
District: ABILENE
Control Number: 2270-01-029
DBE Goal: 0.0%
Project: F 2026(787)
Guaranty: $6,000.00
Time: 54 WORKING DAYS
Engineer's Estimate: $319,006.50
Date: 1:00 PM JULY 02, 2026 (in 22 days) Changed
Contract Number: 7263026
Type: BICYCLE AND PEDESTRIAN IMPROVEMENTS
Project ID: A00212148
Contract Type: Federal
Project Description: THIS PROJECT WILL CONSTRUCT 10-FOOT WIDE SHARED USE PATH FOR 0.30 MILES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
BRYCE TURENTINE
TAYLOR FM 3438 (2270-01-029)
Project Name: N/A
Project: F 2026(787)
Length: 0.0000 MILES
Project Type: CONSTRUCTION
Limits From: HARTFORD ST
Limits To: 600 FT N OF LITTLE ELM CREEK
Project Description: THIS PROJECT WILL CONSTRUCT 10-FOOT WIDE SHARED USE PATH FOR 0.30 MILES
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

28 Total 0 of 28
TAYLOR  |  FM 3438  |  ABILENE  |  2270-01-029  |  1:00 PM JULY 02, 2026  |  $319,006.50  |  F 2026(787)  |  BICYCLE AND PEDESTRIAN IMPRVS  |  54 WORKING DAYS
Item Code
Description
Unit
Quantity
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 4.000
REMOV CONC (DRIVEWAYS)
SY 188.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 197.000
EMBANK (FNL)(DC)(TY A)
CY 26.000
BROADCAST SEED (PERM_RURAL_CLAY)
AC 0.400
VEGETATIVE WATERING
TGL 15.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000
TMA (STATIONARY)
DAY 34.000
TMA (MOBILE OPERATION)
DAY 11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,140.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,140.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 25.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 25.000
DRIVEWAYS (CONC)
SY 188.000
CONC SIDEWALKS (4")
SY 1,687.000
CURB RAMPS (TY 1)
EA 1.000
CURB RAMPS (TY 7)
EA 1.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 6.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 32.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 30.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 5.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 305.000
PREFAB PM TY C (W)(24")(SLD)
LF 32.000
ELIM EXT PM & MRKS (24")
LF 32.000
PAV SURF PREP FOR MRK (24")
LF 32.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 5.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $15,000.00