Show Job Controls
Bid Cobra

TARRANT VARIOUS (0902-90-176)

Items: 105

County: TARRANT
Length: 0.0000 MILES
Highway: VARIOUS
District: FORT WORTH
Control Number: 0902-90-176
DBE Goal: 0.0%
Project: CM 2026(885)
Guaranty: $100,000.00
Time: 219 WORKING DAYS
Engineer's Estimate: $6,914,803.00
Date: 1:00 PM JULY 01, 2026 (in 20 days)
Contract Number: 7263038
Type: CONSTRUCT NEW ROADWAY LANES
Project ID: A00131976
Contract Type: Federal
Project Description: RECONSTRUCT AND WIDEN FROM 2 LANES TO 4 LANES WITH SIDEWALKS, INTERSECTION IMPROVEMENTS, STORMWATER AND CULVERT IMPROVEMENTS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
DANIEL POOLE
SURAFEL SINTAYEHU
JASON PASCOE
TARRANT VARIOUS (0902-90-176)
Project Name: N/A
Project: CM 2026(885)
Length: 0.0000 MILES
Project Type: CONSTRUCTION
Limits From: LAS VEGAS TRAIL; QUEBEC DRIVE
Limits To: IH 820
Project Description: RECONSTRUCT AND WIDEN FROM 2 LANES TO 4 LANES WITH SIDEWALKS, INTERSECTION IMPROVEMENTS, STORMWATER AND CULVERT IMPROVEMENTS
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

105 Total 0 of 105
TARRANT  |  VARIOUS  |  FORT WORTH  |  0902-90-176  |  1:00 PM JULY 01, 2026  |  $6,914,803.00  |  CM 2026(885)  |  CONSTRUCT NEW ROADWAY LANES  |  219 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 16.000
REMOV CONC (DRIVEWAYS)
SY 831.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 63.000
REMOV CONC (CURB & GUTTER)
LF 1,302.000
EXCAV (ROADWAY & CHANNEL)
CY 9,029.000
EMBANK (FNL)(DC)(TY C2)
CY 1,493.000
COMPOST MANUF TOPSOIL (4")
SY 8,690.000
BLOCK SODDING
SY 6,032.000
ROLL SODDING
SY 2,658.000
BROADCAST SEED (TEMP_WARM)
SY 4,345.000
BROADCAST SEED (TEMP_COOL)
SY 4,345.000
VEGETATIVE WATERING
TGL 305.000
RDSIDE AMENITY (GATE)
EA 1.000
PROOF ROLLING
HR 16.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 2,815.000
LIME (COM OR QK)(SLURRY)
TON 222.000
LIME TRT (EXIST MATL)(8")
SY 13,246.000
CEMENT TRT (NEW BASE)(8")
SY 5,000.000
SALV, HAUL & STKPL RCL APH PV (2"-6")
SY 1,920.000
SALV, HAUL & STKPL RCL APH PV (5 TO 9")
SY 5,940.000
PRIME COAT(MC-30 OR AE-P)
GAL 4,834.000
D-GR HMA TY-B PG64-22
TON 2,020.000
TACK COAT
GAL 2,303.000
SP MIXES SP-C SAC-B PG70-28
TON 1,257.000
CONC PVMT (CRCP) (9")
SY 492.000
TRENCH EXCAVATION PROTECTION
LF 1,878.000
TEMPORARY SPL SHORING
SF 8,474.000
RETAINING WALL (SPREAD FOOTING)
SF 6,209.000
RIPRAP (CONC)(5 IN)
CY 12.000
RIPRAP (STONE COMMON)(GROUT)(24 IN)
CY 447.000
RAIL (TY C223)
LF 422.000
CONC BOX CULV (7 FT X 6 FT)
LF 400.000
RC PIPE (CL III)(24 IN)
LF 1,577.000
RC PIPE (CL III)(30 IN)
LF 418.000
INLET (COMPL)(CO)(10 FT)(FTW)
EA 5.000
INLET (COMPL)(CO)(15 FT)(FTW)
EA 4.000
INLET (COMPL)( CO)(20 FT)(FTW)
EA 4.000
INLET (COMPL)(COB)(20 FT)(FTW)
EA 1.000
ADJUSTING MANHOLES
EA 4.000
REMOV STR (INLET)
EA 1.000
REMOV STR (HEADWALL)
EA 2.000
REMOV STR (BOX CULVERT)
LF 63.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000
TMA (STATIONARY)
DAY 94.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 122.000
ROCK FILTER DAMS (REMOVE)
LF 122.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 342.000
CONSTRUCTION EXITS (REMOVE)
SY 342.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,762.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,762.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 285.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 285.000
CONSTRUCTING DETOURS
SY 642.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 180.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 180.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000
CONC CURB (MONO) (TY II)
LF 286.000
CONC CURB & GUTTER (TY II)
LF 3,829.000
DRIVEWAYS (CONC)
SY 929.000
CONC SIDEWALKS (4")
SY 3,001.000
CURB RAMPS (TY 1)
EA 2.000
CURB RAMPS (TY 3)
EA 3.000
CURB RAMPS (TY 22)
EA 1.000
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 57.000
REMOVE METAL BEAM GUARD FENCE
LF 238.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 21.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 4.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 3,087.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 3,358.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 7,105.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 4,076.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 37.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 3,765.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 57.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,098.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 403.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 16.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 2.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 7.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 29.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 383.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 4,183.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 277.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 5,183.000
REFL PAV MRKR TY I-C
EA 66.000
REFL PAV MRKR TY II-A-A
EA 7.000
ELIM EXT PM & MRKS (6")
LF 836.000
ELIM EXT PM & MRKS (24")
LF 98.000
ELIM EXT PM & MRKS (ARROW)
EA 2.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 1.000
ELIM EXT PM & MRKS (WORD)
EA 1.000
PAV SURF PREP FOR MRK (6")
LF 1,360.000
PAV SURF PREP FOR MRK (8")
LF 355.000
PAV SURF PREP FOR MRK (24")
LF 70.000
PAV SURF PREP FOR MRK (ARROW)
EA 2.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 1.000
PAV SURF PREP FOR MRK (WORD)
EA 1.000
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 2.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $100,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $100,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $100,000.00
Total: $300,000.00