Show Job Controls
Bid Cobra

TARRANT DUNCAN PERRY RD (0902-90-129)

Items: 115

County: TARRANT
Length: 0.1460 MILES
Highway: DUNCAN PERRY RD
District: FORT WORTH
Control Number: 0902-90-129
DBE Goal: 0.0%
Project: BR 2020(574)
Guaranty: $100,000.00
Time: 236 WORKING DAYS
Engineer's Estimate: $1,625,300.00
Date: 1:00 PM JULY 02, 2026 (in 21 days)
Contract Number: 7263206
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00064472
Contract Type: Federal
Project Description: BRIDGE REPLACEMENT
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JUSTIN THOMEY
RAUL OROZCO
TARRANT DUNCAN PERRY RD (0902-90-129)
Project Name: N/A
Project: BR 2020(574)
Length: 0.1460 MILES
Project Type: JOINT BID UTILITY
Limits From: AT JOHNSON CREEK
Limits To: .
Project Description: BRIDGE REPLACEMENT
TARRANT DUNCAN PERRY RD (0902-90-270)
Project Name: DUNCAN PERRY RD @ JOHNSON CREEK
Project: CC 902-90-270
Length: 0.0000 MILES
Project Type: REHABILITATION OF EXISTING ROAD
Limits From: AT JOHNSON CREEK
Limits To: .
Project Description: ROADWAY REALIGNMENT
(0902-90-280)
Project Name: N/A
Project: N/A
Length: 0.0000 MILES
Project Type: RIGHT OF WAY
Limits From: AT JOHNSON CREEK
Limits To: .
Project Description: BRIDGE REPLACEMENT
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

115 Total 0 of 115
TARRANT  |  DUNCAN PERRY RD  |  FORT WORTH  |  0902-90-129  |  1:00 PM JULY 02, 2026  |  $1,625,300.00  |  BR 2020(574)  |  REHAB EXIST ROADWAY  |  236 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 7.700
REMOV CONC (RIPRAP)
SY 483.000
EXCAV (ROADWAY)
CY 1,485.000
EMBANK (FNL)(DC)(TY C2)
CY 1,423.000
EMBANK (FNL)(DC)(TY D)
CY 1,485.000
COMPOST MANUF TOPSOIL (4")
SY 15,556.000
HYDRO MULCH SEED (PERM_URBAN_CLAY)
SY 15,556.000
HYDRO MULCH SEED (TEMP_WARM)
SY 3,889.000
HYDRO MULCH SEED (TEMP_COOL)
SY 3,889.000
VEGETATIVE WATERING
TGL 544.500
SOIL RET BLKT(SL_STEEP_CLAY_SHORT)
SY 761.000
SOIL RET BLKT(SL_STEEP_CLAY_LONG)
SY 1,186.000
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 428.000
LIME (COM OR QK)(SLURRY)
TON 32.000
LIME TRT (EXIST MATL & NEW BASE)(8")
SY 1,927.000
SALV, HAUL & STKPL RCL APH PV (6 TO 8")
SY 1,850.000
PRIME COAT(MC-30 OR AE-P)
GAL 353.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 304.000
TACK COAT
GAL 381.000
SP MIXES SP-C SAC-A PG70-28
TON 199.000
CEM STABIL BKFL
CY 337.000
TRENCH EXCAVATION PROTECTION
LF 283.000
TEMPORARY SPL SHORING
SF 318.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 1,082.000
DRILL SHAFT (18 IN)
LF 142.000
DRILL SHAFT (36 IN)
LF 711.000
CL C CONC (ABUT)(HPC)
CY 74.400
CL C CONC (CAP)(HPC)
CY 52.200
CL C CONC (COLUMN)(HPC)
CY 13.500
CL C CONC (RAIL FOUNDATION)
CY 19.000
REINF CONC SLAB (HPC)
SF 12,482.000
APPROACH SLAB (HPC)
CY 98.200
PRESTR CONC GIRDER (TX46)
LF 1,754.640
RIPRAP (CONC)(4 IN)
CY 1.000
RIPRAP (MOW STRIP)(5 IN)
CY 20.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 1,611.000
STR STEEL (MISC NON-BRIDGE)
LB 455.000
RAIL (TY C223)(HPC)
LF 747.900
RAIL (TY PR11)
LF 592.100
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 117.000
CONC BOX CULV (6 FT X 4 FT)
LF 116.000
WINGWALL (FW - 0) (HW=9 FT)
EA 1.000
WINGWALL (SW - 0) (HW=6 FT)
EA 1.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000
TMA (STATIONARY)
DAY 234.000
TMA (MOBILE OPERATION)
DAY 4.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 10.000
ROCK FILTER DAMS (REMOVE)
LF 10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 225.000
CONSTRUCTION EXITS (REMOVE)
SY 225.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,088.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,088.000
CONSTRUCTING DETOURS
SY 1,862.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 140.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 140.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000
CONC SIDEWALKS (5")
SY 506.000
MTL W-BEAM GD FEN (TIM POST)
LF 150.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000
REMOVE METAL BEAM GUARD FENCE
LF 609.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000
WIRE FENCE (TY C)
LF 351.000
GATE (TY 1)
EA 1.000
WIRE FENCE (REMOVE)
LF 351.000
TEMP RD IL SETUP AND REMOVE
EA 2.000
TEMP RD IL MAINTAIN SYSTEM
MO 26.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 2.000
REMOVE SM RD SN SUP&AM
EA 1.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000
INSTL OM ASSM (OM-2Z)(WFLX)SRFLL(BI)
EA 2.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 1,415.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 1,400.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 298.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 323.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 200.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 200.000
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 1,540.000
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 1,540.000
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 2,164.000
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 2,164.000
PAVEMENT SLER 6"
LF 4,328.000
REFL PAV MRKR TY II-A-A
EA 27.000
ELIM EXT PM & MRKS (4")
LF 1,724.000
ELIM EXT PM & MRKRS (PLOWABLE RPMS)
EA 46.000
PAV SURF PREP FOR MRK (6")
LF 4,328.000
PAV SURF PREP FOR MRK (RPM)
EA 27.000
TIP TESTING(DRILL SHAFT)
EA 4.000
INSTALL FTB
LF 44.000
REMOVE FTB
LF 44.000
54" FRP GRAVITY SEWER PIPE, OPEN CUT
LF 982.000
5' DIA. VENTED DROP FRP MANHOLE
EA 1.000
5' DIA. VENTED FRP MANHOLE
EA 1.000
5' DIA. T-BASE FRP MANHOLE
EA 1.000
POINT OF ENTRY CONNECTION
LS 1.000
TIE-IN CONNECTIONS
LS 1.000
DECOMMISSION MANHOLE
EA 6.000
DECOMMISSION PIPES
LF 1,001.000
DEWATRING AND GROUNDWATER CONTROL
LS 1.000
TEMPORARY COFFERDAM AND FLOW DIVERSION
LS 1.000
TRENCH SAFETY
LF 982.000
STORM WATER POLLUTION PREVENTION PLAN
LS 1.000
BANK STABILIZATION
CY 2,543.000
HYDROMULCH
AC 1.000
WATERLINE SUPPORT
EA 2.000
PAVEMENT RESTORATION
LF 90.000
1
TEMPORARY BYPASS PUMPING
LS 1.000
1A
FLOW ISOLATION AND BYPASS PUMPING
LS 1.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $30,000.00