Show Job Controls
Bid Cobra

TARRANT VARIOUS (0902-00-362)

Items: 92

County: TARRANT
Length: 0.0000 MILES
Highway: VARIOUS
District: FORT WORTH
Control Number: 0902-00-362
DBE Goal: 0.0%
Project: C 902-00-362
Guaranty: $100,000.00
Time: 299 WORKING DAYS
Engineer's Estimate: $5,761,253.87
Date: 11/07/2024 (1 year ago)
Contract Number: 11243210
Type: REHABILITATE BRIDGE
Project ID: A00195921
Project Description: ADDRESS FOLLOW UP ACTION ITEMS TO VARIOUS BRIDGE STRUCTURES THROUGHOUT THE DISTRICT.
Mail/Deliver Bids To: N/A
MARIBEL RANGEL
ALFREDO LUERA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$5,761,253.87
Over/Under Est: -10.48% -$603,764.35
Over/Under Est: -0.2% -$11,487.51
Amt Left: 11.48% $592,276.84
Over/Under Est: 3.33% $191,569.19
Amt Left: 15.42% $795,333.54
Delta: -3.53% -$203,056.70
Over/Under Est: 9.2% $530,004.13
Amt Left: 21.98% $1,133,768.48
Delta: -5.69% -$338,434.94
$7,983,353.00
Over/Under Est: 38.57% $2,222,099.13
Amt Left: 54.79% $2,825,863.48
Delta: -26.90% -$1,692,095.00
Subcontractor Percentage Amount
S&S BRIDGE PAINTING 12.53% $617,449.32
BECK-REIT & SONS, LTD. 11.67% $575,070.52
STRUCTURAL INTEGRITY GROUP LLC 3.68% $181,341.86
TRP CONSTRUCTION GROUP, LLC 0.76% $37,451.04
ERWIN STEEL WORKS, LLC 0.42% $20,696.63
Total: 29.06% $1,432,009.37

Bid Items & Bid Tabulations

92 Total 0 of 92
TARRANT  |  VARIOUS  |  FORT WORTH  |  0902-00-362  |  11/07/2024  |  $5,761,253.87  |  C 902-00-362  |  REHAB BRIDGE  |  299 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
RAGLE CONSTRUCTION, INC.
GIBSON & ASSOCIATES, INC.
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 1.000 $30,572.000 $4,833.300 $150,000.000 $10,000.000 $5,000.000 $150,000.000
REMOV CONC (RIPRAP)
SY 227.600 $37.000 $58.500 $45.000 $137.500 $55.000 $100.000
EMBANK (FNL)(OC)(TY B)
CY 7.000 $123.000 $769.600 $700.000 $880.000 $75.000 $500.000
COMPOST MANUF TOPSOIL (4")
SY 36.000 $5.000 $60.100 $60.000 $55.000 $75.000 $100.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 36.000 $4.000 $21.500 $10.000 $55.000 $75.000 $100.000
VEGETATIVE WATERING
TGL 1.000 $1,250.000 $7,836.600 $10,000.000 $2,200.000 $5,000.000 $500.000
SOIL RET BLKT(SL_STEEP_CLAY_SHORT)
SY 18.000 $2.000 $37.700 $7.000 $55.000 $75.000 $150.000
FLOWABLE BACKFILL
CY 8.000 $577.000 $3,074.000 $1,800.000 $500.000 $1,000.000 $500.000
TRENCH EXCAVATION PROTECTION
LF 664.000 $13.000 $22.100 $3.200 $5.000 $190.000 $10.000
TEMPORARY SPL SHORING
SF 1,714.000 $61.000 $14.200 $38.500 $11.000 $225.000 $85.000
CL C CONC(PILE ENCASEMENT)
LF 42.000 $1,400.000 $874.000 $403.000 $660.000 $2,500.000 $6,500.000
CL C CONC (WINGWALLS)
CY 22.400 $4,650.000 $2,237.700 $1,526.000 $4,400.000 $4,000.000 $5,500.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 180.000 $172.000 $125.700 $120.000 $148.500 $350.000 $1,000.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 46.000 $148.000 $223.300 $250.000 $150.000 $100.000 $1,000.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 4,219.000 $202.000 $147.100 $150.000 $187.000 $250.000 $250.000
RIPRAP (CONC)(4 IN)
CY 5.800 $1,760.000 $1,339.300 $1,000.000 $3,300.000 $1,000.000 $650.000
RIPRAP (CONC)(CL A)
CY 1.000 $1,500.000 $2,788.000 $2,500.000 $3,300.000 $1,000.000 $850.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 132.000 $228.000 $220.000 $261.000 $209.000 $275.000 $165.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 1,353.000 $189.000 $206.200 $192.000 $209.000 $275.000 $250.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 1,182.000 $150.000 $209.200 $204.000 $209.000 $275.000 $350.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 848.000 $44.000 $50.500 $15.000 $25.000 $80.000 $100.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 3,255.000 $56.000 $35.300 $28.100 $63.500 $80.000 $100.000
CLEANING EXISTING JOINTS
LF 94.000 $25.000 $28.100 $75.000 $40.000 $80.000 $100.000
RESIZING AND SEALING JOINTS
LF 1,081.000 $82.000 $87.100 $65.000 $80.000 $100.000 $100.000
CLEANING AND SEALING JOINTS (FOAM)
LF 300.000 $81.000 $72.300 $100.000 $90.000 $100.000 $500.000
MULTI-LAYER POLYMER OVERLAY
SY 2,550.000 $90.000 $56.900 $41.000 $45.000 $55.000 $45.000
POLYESTER POLYMER CONC OVERLAY (2")
SY 184.000 $390.000 $525.100 $300.000 $675.000 $750.000 $150.000
STR STEEL (MISCELLANEOUS BRIDGE)
LB 20.000 $28.000 $113.800 $57.000 $250.000 $100.000 $50.000
CLEAN & PAINT EXIST STR (SYSTEM I)
LS 1.000 $340,500.000 $226,971.600 $550,000.000 $234,945.000 $325,000.000 $260,000.000
ANCHOR BOLTS
EA 10.000 $1,450.000 $1,992.400 $442.000 $2,800.000 $300.000 $1,650.000
HEADER TYPE EXPANSION JOINT
CF 226.000 $558.000 $317.400 $200.000 $730.000 $450.000 $850.000
CLEAN EXIST CULVERTS
EA 1.000 $6,440.000 $8,784.900 $10,000.000 $13,200.000 $5,000.000 $5,000.000
RAISING EXIST STRUCT
EA 2.000 $17,517.500 $87,108.200 $434,000.000 $65,000.000 $15,000.000 $50,000.000
REMOV STR (WINGWALL)
EA 3.000 $2,590.000 $3,274.700 $1,800.000 $9,900.000 $3,000.000 $2,500.000
MOBILIZATION
LS 1.000 $499,247.170 $515,787.000 $575,000.000 $746,000.000 $350,000.000 $800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $16,750.000 $27,776.700 $25,000.000 $49,700.000 $2,500.000 $8,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,034.000 $111.000 $94.400 $55.000 $90.000 $10.000 $150.000
TMA (STATIONARY)
DAY 531.000 $225.000 $346.200 $306.000 $320.000 $300.000 $250.000
TMA (MOBILE OPERATION)
DAY 24.000 $392.000 $1,013.100 $763.000 $500.000 $300.000 $550.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 152.000 $85.000 $109.100 $100.000 $110.000 $130.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 152.000 $17.000 $26.300 $50.000 $55.000 $60.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 78.000 $30.000 $75.700 $50.000 $55.000 $60.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $12.000 $32.000 $20.000 $22.000 $30.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,386.000 $4.000 $4.400 $8.900 $5.500 $6.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,386.000 $1.000 $2.100 $3.010 $1.100 $3.000 $2.000
PCTB (FUR&INST)(F-SHAPE OR SNGL SLP)TY1
LF 2,495.000 $85.000 $110.800 $34.000 $33.000 $120.000 $100.000
PCTB (MOVE)(F-SHAPE OR SNGL SLP)TY1
LF 1,485.000 $25.000 $23.700 $9.000 $23.100 $20.000 $20.000
PCTB (REMOVE)(F-SHAPE OR SNGL SLP)TY1
LF 2,495.000 $24.000 $29.700 $9.000 $27.500 $25.000 $20.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 5.000 $2,108.000 $1,726.800 $755.000 $2,200.000 $3,750.000 $6,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,506.000 $1,083.400 $863.000 $1,650.000 $1,000.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,555.000 $10,417.000 $7,100.000 $11,000.000 $11,000.000 $21,000.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 1,086.000 $1.150 $1.800 $2.000 $1.380 $2.000 $3.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 6,915.000 $1.150 $1.400 $1.400 $1.380 $2.000 $3.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 5,133.000 $1.150 $1.400 $1.400 $1.380 $2.000 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 88.000 $12.000 $16.500 $20.000 $11.000 $12.000 $20.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $196.000 $483.400 $225.000 $220.000 $225.000 $250.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $221.000 $518.400 $320.000 $258.500 $250.000 $250.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 1,520.000 $3.000 $1.300 $3.000 $0.990 $1.500 $3.000
RE PM TY II (W) 6" (BRK)
LF 1,520.000 $1.600 $0.800 $1.000 $0.440 $0.750 $3.000
RE PM TY II (W) 6" (SLD)
LF 3,284.000 $1.600 $0.600 $1.000 $0.440 $0.750 $3.000
RE PM TY II (Y) 6" (SLD)
LF 3,222.000 $1.600 $0.600 $1.000 $0.440 $0.750 $3.000
RE PM TY II (BLK)(6")(SHADOW)
LF 1,520.000 $1.600 $0.800 $2.000 $0.440 $0.750 $3.000
TY I HIGH PERF PM (W)4"(BRK)(100MIL)
LF 430.000 $1.500 $2.100 $4.000 $0.830 $1.000 $10.000
TY I HIGH PERF PM (W)4"(SLD)(100MIL)
LF 300.000 $1.500 $2.700 $3.000 $0.830 $1.000 $10.000
TY I HIGH PERF PM (Y)4"(SLD)(100MIL)
LF 443.000 $1.500 $2.100 $3.000 $0.830 $1.000 $10.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 1,520.000 $1.200 $1.400 $2.000 $1.060 $1.000 $3.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 3,284.000 $1.200 $1.100 $1.400 $0.990 $1.000 $3.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 3,222.000 $1.200 $1.100 $1.400 $0.990 $1.000 $3.000
ELIM EXT PM & MRKS (6")
LF 6,687.000 $1.100 $0.900 $1.000 $0.830 $1.000 $3.000
PAV SURF PREP FOR MRK (6")
LF 9,546.000 $0.400 $0.200 $0.300 $0.110 $0.250 $3.000
JT CLEANING AND SEALING(LNGT CNSTR JTS)
LF 34.000 $50.000 $37.300 $26.000 $50.000 $25.000 $100.000
DRIFTWOOD REMOVAL
CY 93.000 $480.000 $434.600 $260.000 $165.000 $75.000 $120.000
TREE REMOVAL (4" - 12" DIA)
EA 2.000 $75.000 $750.600 $1,057.000 $1,320.000 $1,000.000 $2,500.000
DRAIN INLET CLEANING
EA 1.000 $690.000 $2,142.100 $1,500.000 $2,750.000 $1,000.000 $1,500.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 10.000 $1,220.000 $925.300 $1,040.000 $1,400.000 $300.000 $1,000.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 114.000 $110.000 $126.800 $54.000 $82.500 $80.000 $100.000
REP STL BRIDGE MEMBER (BEARINGS)
EA 52.000 $7,500.000 $154.300 $684.000 $2,200.000 $4,000.000 $3,500.000
REP STL BRIDGE MBR (BRNG MASONRY PLATE)
EA 1.000 $3,500.000 $2,500.800 $2,100.000 $1,500.000 $4,000.000 $6,500.000
REP STL BRIDGE MBR (STRAIGHTEN MEMB)
EA 1.000 $20,000.000 $13,700.400 $7,625.000 $21,000.000 $25,000.000 $12,500.000
REP STL BRIDGE MBR (ANCHOR BOLT NUTS)
EA 19.000 $535.000 $369.400 $616.000 $250.000 $1,000.000 $2,500.000
REP STL BRIDGE MBR (WELD REPAIR)
EA 9.000 $960.000 $1,070.400 $1,024.000 $600.000 $1,500.000 $6,500.000
REP STL BRIDGE MBR (COTTER PIN OR BOLT)
EA 3.000 $500.000 $210.000 $991.000 $250.000 $1,000.000 $4,000.000
BRIDGE JOINT REPAIR (SEJ)
LF 178.000 $502.000 $68.000 $67.000 $165.000 $250.000 $2,500.000
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 308.000 $558.000 $298.300 $293.000 $820.000 $350.000 $1,000.000
REPLACING ELASTOMERIC BEARING PADS
EA 53.000 $9,325.000 $6,517.800 $3,600.000 $3,450.000 $4,500.000 $5,000.000
STEEL BRIDGE ZONE PAINTING REF STR #1
EA 1.000 $175,000.000 $220,202.200 $300,000.000 $241,500.000 $325,000.000 $260,000.000
STEEL BRIDGE ZONE PAINTING REF STR #2
EA 1.000 $4,500.000 $34,834.000 $40,000.000 $36,800.000 $60,000.000 $55,000.000
STEEL BRIDGE ZONE PAINTING REF STR #3
EA 1.000 $3,300.000 $34,834.000 $40,000.000 $36,800.000 $60,000.000 $55,000.000
STEEL BRIDGE ZONE PAINTING REF STR #4
EA 1.000 $1,250.000 $22,834.000 $30,000.000 $23,000.000 $40,000.000 $35,000.000
STEEL BRIDGE ZONE PAINTING REF STR #5
EA 1.000 $54,250.000 $71,901.500 $75,000.000 $74,865.000 $90,000.000 $100,000.000
STEEL BRIDGE ZONE PAINTING REF STR #6
EA 1.000 $100.000 $5,566.800 $10,000.000 $5,750.000 $20,000.000 $25,000.000
STEEL BRIDGE ZONE PAINTING REF STR #7
EA 1.000 $1,325.000 $54,667.900 $60,000.000 $56,350.000 $75,000.000 $65,000.000
Totals: $5,761,253.870 $5,157,489.520 $5,749,766.360 $5,952,823.060 $6,291,258.000 $7,983,353.000