TARRANT SH 199 (0171-05-083)

Items: 62

County: TARRANT
Length: N/A
Highway: SH 199
District: FORT WORTH
Control Number: 0171-05-083
DBE Goal: 600.0%
Project: BR 2008(909)
Guaranty: N/A
Time: 171 WORKING DAYS
Engineer's Estimate: $3,078,791.85
Date: 03/06/2024 (2 years ago)
Contract Number: N/A
Type: REHABILITATE BRIDGE
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$3,078,791.85
$2,400,012.05
Over/Under Est: -22.05% -$678,779.80
Over/Under Est: -19.86% -$611,380.47
Amt Left: 2.81% $67,399.33
Over/Under Est: -5.6% -$172,484.39
Amt Left: 21.1% $506,295.41
Delta: -17.79% -$438,896.08
$3,063,856.03
Over/Under Est: -0.49% -$14,935.82
Amt Left: 27.66% $663,843.98
Delta: -5.42% -$157,548.57
Over/Under Est: 26.31% $810,096.15
Amt Left: 62.04% $1,488,875.95
Delta: -26.93% -$825,031.97
$3,979,424.00
Over/Under Est: 29.25% $900,632.15
Amt Left: 65.81% $1,579,411.95
Delta: -2.33% -$90,536.00
Subcontractor Percentage Amount
MACIAS SPECIALTY CONTRACTING LLC 19.26% $498,036.52
TEXAS MATERIALS GROUP, INC. 2.19% $56,630.32
J.H. PAINTING COMPANY 2.17% $56,113.15
DUSTROL, INC. 0.91% $23,531.32
TRP CONSTRUCTION GROUP, LLC 0.83% $21,462.63
BARRICADES UNLIMITED 0.65% $16,808.09
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 0.60% $15,515.16
Total: 26.61% $688,097.19

Bid Items & Bid Tabulations

62 Total 0 of 62
TARRANT  |  SH 199  |  FORT WORTH  |  0171-05-083  |  03/06/2024  |  $3,078,791.85  |  BR 2008(909)  |  REHAB BRIDGE  |  171 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GIBSON & ASSOCIATES, INC.
RAGLE CONSTRUCTION, INC.
MB WESTERN INDUSTRIAL CONTRACTING COMPANY
TALBERT COMPANIES LLC
THE TRUESDELL CORPORATION
FNH CONSTRUCTION, LLC
COMPOST MANUF TOPSOIL (4")
SY 29.000 $10.000 $22.000 $50.000 $15.000 $24.000 $25.000 $100.000
BLOCK SODDING
SY 29.000 $20.000 $27.500 $50.000 $50.000 $9.600 $30.000 $50.000
FERTILIZER
AC 0.010 $5,000.000 $5,500.000 $5,000.000 $50,000.000 $7,200.000 $10,000.000 $100,000.000
VEGETATIVE WATERING
MG 4.400 $150.000 $550.000 $120.000 $775.000 $36.000 $1,800.000 $500.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 125.000 $100.000 $354.000 $175.000 $85.000 $66.000 $475.000 $80.000
PLANE ASPH CONC PAV (0" TO 2" MICRO)
SY 4,953.000 $6.000 $4.680 $8.000 $5.000 $3.600 $5.000 $20.000
FLOWABLE BACKFILL
CY 5.000 $700.000 $1,000.000 $945.000 $600.000 $540.000 $2,500.000 $350.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 20,437.000 $13.000 $3.030 $5.880 $7.140 $18.000 $39.000 $10.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 862.000 $370.000 $84.000 $35.000 $145.800 $102.000 $90.000 $400.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 2,019.000 $265.000 $192.000 $120.000 $194.400 $228.000 $170.000 $300.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 112.000 $60.000 $45.000 $33.000 $59.540 $38.400 $120.000 $100.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 896.000 $55.000 $45.000 $25.000 $43.740 $48.000 $69.000 $100.000
STR STEEL (MISC NON - BRIDGE)
LB 2,358.000 $25.000 $29.000 $14.000 $20.000 $18.000 $45.000 $30.000
MOBILIZATION
LS 1.000 $279,890.000 $248,000.000 $245,000.000 $425,000.000 $215,520.000 $654,571.600 $380,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $15,000.000 $10,780.000 $30,500.000 $5,000.000 $9,600.000 $10,000.000 $8,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $38.000 $35.200 $32.000 $35.000 $27.600 $33.000 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $18.000 $16.500 $15.000 $15.000 $8.400 $15.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 600.000 $4.000 $3.850 $3.500 $10.000 $3.600 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 600.000 $1.150 $1.100 $1.000 $5.000 $1.200 $2.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 264.000 $6.000 $6.600 $6.000 $10.000 $5.400 $7.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 264.000 $2.000 $1.380 $1.250 $5.000 $1.200 $2.000 $9.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 816.000 $60.000 $55.000 $60.000 $75.000 $54.000 $85.000 $85.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $60.000 $55.000 $60.000 $75.000 $48.000 $83.000 $85.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 2,370.000 $10.000 $5.000 $12.000 $25.000 $6.000 $11.000 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 120.000 $10.000 $5.000 $12.000 $25.000 $14.400 $11.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 816.000 $20.000 $29.000 $12.000 $25.000 $12.000 $22.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $25.000 $29.000 $12.000 $25.000 $36.000 $22.000 $20.000
CONC SIDEWALKS (5")
SY 1.000 $150.000 $1,000.000 $200.000 $1,000.000 $720.000 $7,000.000 $5,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 40.000 $26.000 $25.000 $20.000 $50.000 $168.000 $45.000 $100.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 381.000 $1.750 $0.800 $0.500 $0.610 $4.800 $1.000 $1.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 4,813.000 $1.350 $0.800 $0.500 $0.610 $1.800 $1.000 $1.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 5,070.000 $1.600 $0.800 $0.500 $0.610 $1.800 $1.000 $1.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 12.000 $5.000 $2.000 $2.100 $2.550 $600.000 $2.200 $6.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 368.000 $1.700 $1.000 $2.100 $2.550 $1.440 $2.000 $6.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 159.000 $4.000 $4.500 $2.600 $3.160 $6.000 $5.000 $12.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 222.000 $15.000 $8.000 $5.000 $6.080 $10.800 $9.000 $20.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 3.000 $225.000 $150.000 $165.000 $200.480 $240.000 $300.000 $250.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 3.000 $230.000 $190.000 $135.000 $164.030 $240.000 $400.000 $250.000
REFL PAV MRK TY II (W) 6" (BRK)
LF 799.000 $1.000 $0.330 $1.330 $1.620 $2.400 $1.000 $2.000
REFL PAV MRK TY II (W) 6" (SLD)
LF 219.000 $1.000 $0.240 $1.330 $1.620 $3.600 $1.000 $2.000
REFL PAV MRK TY II (W) 8" (DOT)
LF 12.000 $1.100 $1.300 $1.390 $1.690 $18.000 $2.000 $2.000
REFL PAV MRK TY II (W) 8" (SLD)
LF 368.000 $2.000 $0.500 $1.450 $1.760 $3.600 $1.000 $3.000
REFL PAV MRK TY II (W) 12" (SLD)
LF 159.000 $3.000 $1.750 $1.500 $1.820 $9.600 $2.000 $3.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 222.000 $5.000 $3.000 $3.000 $3.650 $9.600 $4.000 $20.000
REFL PAV MRK TY II (W) (ARROW)
EA 3.000 $100.000 $100.000 $120.000 $145.800 $240.000 $200.000 $250.000
REFL PAV MRK TY II (W) (WORD)
EA 3.000 $150.000 $120.000 $105.000 $127.580 $240.000 $200.000 $250.000
REFL PAV MRK TY II (Y) 6" (BRK)
LF 468.000 $1.000 $0.330 $1.330 $1.620 $0.600 $1.000 $3.000
REFL PAV MRK TY II (Y) 6" (SLD)
LF 3,164.000 $1.000 $0.240 $1.330 $1.620 $0.480 $0.500 $3.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 799.000 $1.150 $1.000 $1.180 $1.430 $0.790 $2.000 $3.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 219.000 $1.100 $1.000 $1.180 $1.430 $0.720 $2.000 $3.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 468.000 $1.000 $1.000 $1.180 $1.430 $0.840 $2.000 $3.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 3,164.000 $1.000 $0.850 $1.180 $1.430 $0.960 $1.000 $3.000
REFL PAV MRKR TY I-C
EA 30.000 $7.500 $5.000 $4.250 $5.160 $4.800 $6.000 $6.000
REFL PAV MRKR TY II-A-A
EA 55.000 $8.500 $5.000 $4.800 $5.830 $4.200 $6.000 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,872.000 $0.750 $0.500 $0.370 $0.450 $0.720 $1.000 $1.000
PAV SURF PREP FOR MRK (6")
LF 4,650.000 $0.250 $0.070 $0.500 $0.610 $0.250 $0.100 $2.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 4.000 $850.000 $1,500.000 $1,500.000 $1,203.000 $1,080.000 $1,000.000 $1,000.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 106.000 $190.000 $72.000 $75.000 $72.900 $40.800 $65.000 $100.000
CARBON FIBER REINF POLYMER PROTECTION
SF 1,052.000 $160.000 $150.000 $91.000 $151.880 $204.000 $130.000 $125.000
POLYESTER POLYMER CONC OVERLAY (2")
SY 4,953.000 $200.000 $207.000 $236.000 $244.000 $264.000 $250.000 $325.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $12,000.000 $12,000.000 $10,000.000 $2,640.000 $15,000.000 $16,500.000
TMA (STATIONARY)
DAY 240.000 $200.000 $50.000 $100.000 $150.000 $240.000 $250.000 $250.000
Totals: $3,078,791.850 $2,400,012.050 $2,467,411.380 $2,906,307.460 $3,063,856.030 $3,888,888.000 $3,979,424.000