Show Job Controls
Bid Cobra

TARRANT BU 287P (0013-10-098)

Items: 78

County: TARRANT
Length: 3.5000 MILES
Highway: BU 287P
District: FORT WORTH
Control Number: 0013-10-098
DBE Goal: 0.0%
Project: F 2026(884)
Guaranty: $100,000.00
Time: 157 WORKING DAYS
Engineer's Estimate: $8,676,166.77
Date: 1:00 PM JULY 01, 2026 (in 21 days)
Contract Number: 7263039
Type: RESURFACE ROADWAY
Project ID: A00217855
Contract Type: Federal
Project Description: MILLING & OVERLAY, PAVEMENT BASE REPAIR, PAVEMENT MARKINGS, MBGF, RUMBLE STRIPS, CONCRETE TRAFFIC BARRIER
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
DANIEL POOLE
SURAFEL SINTAYEHU
JASON PASCOE
TARRANT BU 287P (0013-10-098)
Project Name: N/A
Project: F 2026(884)
Length: 3.5000 MILES
Project Type: CONSTRUCTION
Limits From: BAILEY BOSWELL
Limits To: BONDS RANCH
Project Description: MILLING & OVERLAY, PAVEMENT BASE REPAIR, PAVEMENT MARKINGS, MBGF, RUMBLE STRIPS, CONCRETE TRAFFIC BARRIER
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

78 Total 0 of 78
1 Added
1 Removed
TARRANT  |  BU 287P  |  FORT WORTH  |  0013-10-098  |  1:00 PM JULY 01, 2026  |  $8,676,166.77  |  F 2026(884)  |  RESURF ROADWAY  |  157 WORKING DAYS
Item Code
Description
Unit
Quantity
RMV (4"-8") TRT/UNTRT BASE & ASPH PAV
SY 4,904.000
BACKFILL (TY A OR B)
STA 266.000
ASPH (AC-20-5TR)
GAL 50,566.000
AGGR (TY-B, GR-4)(SAC-B)
CY 1,165.000
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 2,831.000
SP MIXES SP-C SAC-A PG70-28
TON 14,703.670
TACK COAT
GAL 25,575.000
TOM-F PG76-22 SAC-B
TON 3,131.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 15,727.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 2,193.000
PLANE ASPH CONC PAV(0" TO 6")
SY 127,858.000
FULL - DEPTH REPAIR CRCP (10")
SY 1,023.000
RIPRAP (CONC)(6 IN)
CY 1,020.000
Added
RIPRAP (MOW STRIP)(4 IN)
CY 151.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000
TMA (STATIONARY)
DAY 300.000
TMA (MOBILE OPERATION)
DAY 40.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,365.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,365.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 10,980.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 10,980.000
PORT CTB (CONNECTION HARDWARE)
EA 718.000
PORT CTB (PINNING)
EA 2,932.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 29,198.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,025.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 9.000
REMOVE METAL BEAM GUARD FENCE
LF 2,025.000
REMOVE TERMINAL ANCHOR SECTION
EA 9.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000
GUARDRAIL END TREATMENT (REMOVE)
EA 9.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 7.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 43.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 43.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 40.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 752.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 16,809.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 72,344.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 13,184.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 842.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 78.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 78.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 81,120.000
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 1,906.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,555.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 152.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,592.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 421.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 39.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 39.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 953.000
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 8,426.000
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 36,172.000
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 40,560.000
PAVEMENT SLER 6"
LF 85,289.000
PAVEMENT SLER 8"
LF 6,592.000
PAVEMENT SLER 24"
LF 1,374.000
PAVEMENT SLER (ARROW)
EA 39.000
PAVEMENT SLER (WORD)
EA 39.000
REFL PAV MRKR TY I-C
EA 351.000
REFL PAV MRKR TY II-A-A
EA 452.000
REFL PAV MRKR TY II-C-R
EA 461.000
PAV SURF PREP FOR MRK (6")
LF 16,418.000
PAV SURF PREP FOR MRK (8")
LF 3,082.000
PAV SURF PREP FOR MRK (12")
LF 210.000
PAV SURF PREP FOR MRK (24")
LF 235.000
PAV SURF PREP FOR MRK (ARROW)
EA 18.000
PAV SURF PREP FOR MRK (WORD)
EA 18.000
PAV SURF PREP FOR MRK (RPM)
EA 643.000
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 921.000
FULL - WIDTH MOWING
AC 14.150
LITTER REMOVAL
AC 14.150
TREE TRIMMING / BRUSH REMOVAL
MI 2.650
DITCH CLEANING AND RESHAPING (FOOT)
LF 13,557.000
Removed RIPRAP (MOW STRIP)(5 IN) CY 151.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $40,000.00
Total: $100,000.00