PREPARING ROW
|
STA
|
453.000
|
$300.000
|
$220.000
|
$710.910
|
$291.380
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
209.000
|
$16.000
|
$8.800
|
$12.270
|
$15.840
|
|
|
REMOVING STAB BASE AND ASPH PAV (0-4")
|
SY
|
581.000
|
$5.000
|
$5.800
|
$9.990
|
$3.980
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,064.000
|
$15.000
|
$20.300
|
$16.650
|
$26.390
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
102.900
|
$50.000
|
$36.750
|
$27.180
|
$67.730
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
7,329.000
|
$15.000
|
$8.000
|
$16.650
|
$11.560
|
|
|
BACKFILL (TY A OR B)
|
STA
|
453.000
|
$180.000
|
$175.000
|
$128.850
|
$168.280
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
18.200
|
$470.000
|
$1,080.000
|
$871.000
|
$739.840
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
88,000.000
|
$0.180
|
$0.260
|
$0.210
|
$0.180
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
11,578.000
|
$45.000
|
$39.000
|
$46.740
|
$41.660
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
88,075.000
|
$3.000
|
$3.500
|
$3.950
|
$3.800
|
|
|
ASPH (RC-250)
|
GAL
|
4,818.000
|
$5.000
|
$4.400
|
$5.230
|
$4.710
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
2,960.000
|
$80.000
|
$45.000
|
$67.640
|
$85.850
|
|
|
AGGR(TY-PB GR-5 SAC-B)
|
CY
|
156.000
|
$140.000
|
$123.000
|
$96.970
|
$205.760
|
|
|
LRA PAV TY-I GR-A
|
TON
|
536.000
|
$100.000
|
$82.000
|
$90.180
|
$161.150
|
|
|
LRA PAV TY-I GR-D
|
TON
|
3,995.000
|
$95.000
|
$88.000
|
$90.180
|
$146.430
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
4,832.000
|
$50.000
|
$50.000
|
$46.170
|
$67.970
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
5,545.000
|
$6.000
|
$6.900
|
$2.850
|
$8.900
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
1,000.000
|
$6.000
|
$6.500
|
$4.130
|
$14.030
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,941.400
|
$18.000
|
$18.550
|
$15.750
|
$23.780
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
317.600
|
$550.000
|
$620.000
|
$524.990
|
$533.740
|
|
|
RIPRAP (STONE TY R)(DRY)(12 IN)
|
CY
|
112.000
|
$195.000
|
$200.000
|
$149.800
|
$320.300
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
90.000
|
$177.000
|
$200.000
|
$149.800
|
$353.520
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
1,228.000
|
$60.000
|
$34.500
|
$23.720
|
$24.840
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
64.000
|
$60.000
|
$86.500
|
$73.500
|
$63.410
|
|
|
CMP AR (GAL STL DES 1)
|
LF
|
100.000
|
$80.000
|
$93.000
|
$78.750
|
$73.980
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
65.000
|
$600.000
|
$465.000
|
$393.750
|
$628.860
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
19.000
|
$800.000
|
$620.000
|
$524.990
|
$834.960
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
14.000
|
$450.000
|
$700.000
|
$603.740
|
$930.080
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
12.000
|
$500.000
|
$850.000
|
$734.990
|
$1,152.030
|
|
|
CONC BOX CULV (10 FT X 5 FT)
|
LF
|
13.000
|
$500.000
|
$1,110.000
|
$944.990
|
$1,321.140
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
4.000
|
$5,000.000
|
$8,050.000
|
$6,824.930
|
$6,500.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
1.000
|
$8,800.000
|
$14,250.000
|
$12,074.880
|
$8,666.660
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
2.000
|
$9,500.000
|
$14,850.000
|
$12,599.880
|
$10,045.930
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
2.000
|
$6,750.000
|
$13,600.000
|
$11,549.890
|
$9,047.150
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$11,100.000
|
$15,500.000
|
$13,124.870
|
$10,405.280
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
3.000
|
$13,500.000
|
$22,900.000
|
$19,424.810
|
$11,256.090
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$19,000.000
|
$27,870.000
|
$23,624.770
|
$26,422.760
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$990.000
|
$2,230.000
|
$1,889.980
|
$1,268.290
|
|
|
SET (TY II) (DES 1) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,750.000
|
$2,475.000
|
$2,099.980
|
$4,439.030
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
7.000
|
$2,000.000
|
$2,475.000
|
$2,099.980
|
$2,272.360
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$390.000
|
$1,240.000
|
$1,049.990
|
$1,062.200
|
|
|
REMOV STR (WINGWALL)
|
EA
|
12.000
|
$2,500.000
|
$1,850.000
|
$1,574.980
|
$1,321.140
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,065.000
|
$1,480.000
|
$1,259.990
|
$1,062.200
|
|
|
REMOV STR (PIPE)
|
EA
|
1.000
|
$400.000
|
$500.000
|
$420.000
|
$2,642.280
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$647,000.000
|
$600,000.000
|
$890,000.000
|
$487,877.260
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$10,000.000
|
$15,000.000
|
$10,000.000
|
$14,113.260
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,834.000
|
$32.000
|
$30.000
|
$34.750
|
$32.760
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,834.000
|
$10.000
|
$8.000
|
$13.000
|
$9.510
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
224.000
|
$30.000
|
$40.000
|
$33.760
|
$31.710
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
224.000
|
$10.000
|
$12.000
|
$11.000
|
$10.570
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,811.000
|
$3.000
|
$4.000
|
$2.950
|
$3.700
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,811.000
|
$0.500
|
$0.750
|
$0.610
|
$0.790
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
7,800.000
|
$1.500
|
$4.000
|
$3.000
|
$4.970
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
7,800.000
|
$2.500
|
$1.000
|
$1.000
|
$1.060
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
300.000
|
$60.000
|
$40.000
|
$57.260
|
$37.950
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,800.000
|
$15.000
|
$13.000
|
$18.340
|
$20.310
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
300.000
|
$30.000
|
$24.000
|
$37.930
|
$28.290
|
|
|
DRIVEWAYS (CONC)
|
SY
|
174.000
|
$93.750
|
$120.000
|
$105.000
|
$143.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,945.000
|
$40.000
|
$29.000
|
$35.040
|
$37.220
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
52,824.000
|
$0.200
|
$0.210
|
$0.100
|
$0.170
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
12,618.000
|
$0.180
|
$0.400
|
$0.200
|
$0.340
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
9,775.000
|
$25.000
|
$31.000
|
$27.100
|
$28.640
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
16.000
|
$1,845.000
|
$2,380.000
|
$2,026.000
|
$2,141.300
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
300.000
|
$55.000
|
$65.000
|
$67.030
|
$70.840
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
2.000
|
$1,050.000
|
$945.000
|
$1,069.000
|
$1,129.840
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,412.000
|
$1.300
|
$1.500
|
$2.000
|
$2.110
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
13.000
|
$200.000
|
$245.000
|
$245.000
|
$258.940
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
44.000
|
$2,600.000
|
$3,365.000
|
$2,684.000
|
$2,836.750
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
13.000
|
$230.000
|
$250.000
|
$245.000
|
$258.940
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
24.000
|
$1,200.000
|
$1,600.000
|
$795.000
|
$978.050
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,000.000
|
$1,140.000
|
$795.000
|
$978.020
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$8,500.000
|
$10,400.000
|
$7,600.000
|
$9,174.610
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
17.000
|
$658.000
|
$1,235.000
|
$723.020
|
$1,056.910
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,300.000
|
$1,850.000
|
$1,300.260
|
$1,056.910
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$110.000
|
$380.000
|
$137.290
|
$270.920
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
32.000
|
$30.000
|
$45.000
|
$21.600
|
$52.860
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
40.000
|
$32.000
|
$45.000
|
$30.450
|
$52.860
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
115.000
|
$32.000
|
$45.000
|
$28.890
|
$52.860
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
39,416.000
|
$0.600
|
$0.620
|
$0.500
|
$0.530
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
39,416.000
|
$0.650
|
$0.680
|
$0.550
|
$0.580
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
700.000
|
$0.850
|
$0.740
|
$0.600
|
$0.630
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
285.000
|
$0.800
|
$1.000
|
$0.800
|
$0.850
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
520.000
|
$10.000
|
$8.670
|
$7.000
|
$7.400
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
3,750.000
|
$0.350
|
$0.400
|
$0.320
|
$0.340
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
90,556.000
|
$0.350
|
$0.380
|
$0.310
|
$0.330
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
6,837.000
|
$0.350
|
$0.380
|
$0.310
|
$0.330
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
57,142.000
|
$0.350
|
$0.370
|
$0.300
|
$0.320
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
9.000
|
$260.000
|
$335.000
|
$270.000
|
$285.370
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
4.000
|
$550.000
|
$625.000
|
$505.000
|
$533.740
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
3.000
|
$320.000
|
$335.000
|
$270.000
|
$285.370
|
|
REFL PAV MRKR TY I-C
|
EA
|
204.000
|
$4.000
|
$4.750
|
$3.850
|
$4.070
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,062.000
|
$4.000
|
$4.340
|
$3.850
|
$3.700
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
39,416.000
|
$0.250
|
$0.620
|
$0.500
|
$0.530
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
42,652.000
|
$90.000
|
$87.500
|
$90.080
|
$108.930
|
|
|
TACK COAT
|
GAL
|
12,583.000
|
$3.500
|
$3.000
|
$3.380
|
$2.060
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
356.000
|
$60.000
|
$65.000
|
$75.000
|
$118.110
|
|
|
TMA (STATIONARY)
|
DAY
|
178.000
|
$175.000
|
$180.000
|
$150.000
|
$273.970
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
100.000
|
$70.000
|
$180.000
|
$150.000
|
$62.570
|
|
Totals: |
$8,510,241.090
|
$8,455,478.515
|
$8,957,759.956
|
$9,834,265.461
|