STEPHENS US 183 (0404-02-036)

Items: 97

County: STEPHENS
Length: N/A
Highway: US 183
District: BROWNWOOD
Control Number: 0404-02-036
DBE Goal: N/A
Project: STP 1902(142)
Guaranty: N/A
Time: 261 WORKING DAYS
Engineer's Estimate: $6,433,482.73
Date: 05/06/2021 (5 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$6,433,482.73
$5,955,500.45
Over/Under Est: -7.43% -$477,982.28
$6,127,420.92
Over/Under Est: -4.76% -$306,061.81
Amt Left: 2.89% $171,920.47
Over/Under Est: -1.21% -$77,923.73
Amt Left: 6.72% $400,058.55
Delta: -3.72% -$228,138.08
Over/Under Est: -0.75% -$48,227.44
Amt Left: 7.22% $429,754.84
Delta: -0.47% -$29,696.29
Subcontractor Percentage Amount
PRATER DIRT WORK LLC 77.97% $4,954,562.33
FLATWORKS, LLC 22.37% $1,421,489.80
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC 5.46% $346,952.81
JR WEST TEXAS CONCRETE LLC 1.57% $99,764.82
J. H. ODEN CONTRACTING COMPANY 1.07% $67,992.58
HJC FARMS, INC. 1.01% $64,179.91
TRP CONSTRUCTION GROUP, LLC 0.75% $47,658.35
TNT INDUSTRIAL CONTRACTING 0.62% $39,397.57
D. I. J. CONSTRUCTION, INC. 0.62% $39,397.57
TEXAS TRAFFIC AND BARRICADE, LLC 0.41% $26,053.23
PRECISION WATER & OUTDOOR 0.25% $15,886.12
GRIDER PAVING LLC 0.19% $12,073.45
PENHALL COMPANY 0.17% $10,802.56
TEXOP CONSTRUCTION 0.11% $6,989.89
DUSTROL, INC. 0.11% $6,989.89
BLACKSMITH VENTURES LLC 0.08% $5,083.56
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.00% $0.00
ACT SAW CUTTING & REMOVAL 0.00% $0.00
BARRICADES UNLIMITED 0.00% $0.00
DALLAS LITE AND BARRICADE, INC. 0.00% $0.00
L&H ELECTRICAL, LLC 0.00% $0.00
LEVI THOMPSON CONSTRUCTION, INC. 0.00% $0.00
RAYDON, INC. 0.00% $0.00
TEXAS TRAFFIC AND BARRICADE, LLC 0.00% $0.00
W. S. CONSTRUCTION COMPANY 0.00% $0.00
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 0.00% $0.00
A.L. CONSTRUCTION LLC 0.00% $0.00
Total: 112.76% $7,165,274.44

Bid Items & Bid Tabulations

97 Total 0 of 97
STEPHENS  |  US 183  |  BROWNWOOD  |  0404-02-036  |  05/06/2021  |  $6,433,482.73  |  STP 1902(142)  |  REHAB EXIST ROADWAY  |  261 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOUTSCO PAVING COMPANY, LLC
A. L. HELMCAMP, INC.
PEACHTREE CONSTRUCTION, LTD.
JAY MILLS CONTRACTING, INCORPORATED
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 3.000 $250.000 $500.000 $1,000.000 $250.000 $1,000.000
PREP ROW (TREE) (18"-36" DIA.)
EA 7.000 $1,500.000 $2,000.000 $3,000.000 $1,100.000 $2,000.000
REMOVING CONC (SIDEWALKS)
SY 3,230.460 $19.000 $16.000 $13.000 $25.000 $12.000
REMOVING CONC (DRIVEWAYS)
SY 1,112.130 $19.000 $18.000 $25.000 $27.000 $18.000
REMOVING CONC (CURB AND GUTTER)
LF 5,584.470 $8.000 $7.000 $11.000 $12.500 $11.000
REMOVE CONC (GUTTER)
LF 602.450 $6.000 $15.000 $11.000 $36.000 $9.000
REMOVING CONC (PAVERS)
SY 3.550 $40.000 $20.000 $30.000 $250.000 $100.000
EXCAVATION (ROADWAY)
CY 1,338.000 $15.000 $25.000 $27.000 $26.000 $22.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 4,907.000 $14.000 $15.000 $28.000 $36.000 $19.000
FURNISHING AND PLACING TOPSOIL (3")
SY 8,787.000 $1.500 $2.200 $3.500 $2.450 $3.500
BLOCK SODDING
SY 8,787.000 $4.000 $4.000 $4.500 $4.250 $4.250
VEGETATIVE WATERING
MG 197.000 $33.000 $75.000 $20.000 $120.000 $30.000
PROOF ROLLING
HR 10.000 $78.000 $100.000 $88.000 $125.000 $100.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 2,000.000 $60.000 $55.000 $50.000 $62.250 $55.000
PLANE ASPH CONC PAV(4" TO 6")
SY 39,465.220 $3.000 $2.000 $4.500 $3.250 $3.500
CONC PVMT (JOINTED - CPCD) (8")
SY 1,592.000 $70.000 $50.000 $110.000 $120.000 $110.000
STRUCT EXCAV
CY 923.000 $30.000 $12.000 $11.000 $43.000 $22.000
FLOWABLE BACKFILL
CY 555.000 $150.000 $225.000 $240.000 $220.000 $160.000
TRENCH EXCAVATION PROTECTION
LF 698.000 $6.400 $25.000 $26.000 $6.000 $2.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 230.000 $250.000 $235.000 $290.000 $310.000 $305.000
CONC STR REPAIR (STANDARD)
SF 60.000 $160.000 $100.000 $110.000 $210.000 $195.000
RIPRAP (CONC)(4 IN)
CY 73.500 $600.000 $650.000 $580.000 $630.000 $550.000
RIPRAP (CONC)(5 IN)
CY 2.200 $800.000 $900.000 $580.000 $750.000 $700.000
RAIL (TY PR11)
LF 180.000 $150.000 $110.000 $130.000 $160.000 $125.000
CONC BOX CULV (4 FT X 2 FT)
LF 96.000 $350.000 $375.000 $400.000 $340.000 $350.000
CONC BOX CULV (4 FT X 3 FT)
LF 246.000 $350.000 $425.000 $450.000 $400.000 $375.000
CONC BOX CULV (5 FT X 3 FT)
LF 24.000 $400.000 $550.000 $600.000 $620.000 $550.000
RC PIPE (CL III)(24 IN)
LF 673.000 $82.000 $105.000 $110.000 $80.000 $85.000
RC PIPE (CL III)(30 IN)
LF 231.000 $100.000 $140.000 $150.000 $98.000 $105.000
RC PIPE (CL IV)(30 IN)
LF 153.000 $115.000 $165.000 $180.000 $116.000 $115.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 8.000 $5,000.000 $5,000.000 $6,000.000 $3,800.000 $4,000.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 2.000 $5,000.000 $5,500.000 $6,000.000 $3,800.000 $4,200.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 2.000 $6,500.000 $5,500.000 $6,000.000 $3,800.000 $5,200.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $4,800.000 $7,000.000 $8,000.000 $5,000.000 $4,700.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
EA 1.000 $7,000.000 $11,000.000 $12,000.000 $9,000.000 $8,000.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $10,000.000 $7,700.000 $8,100.000 $5,500.000 $5,000.000
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 2.000 $1,000.000 $1,200.000 $1,300.000 $966.670 $1,100.000
SET (TY II) (30 IN) (RCP) (3: 1) (P)
EA 2.000 $2,000.000 $2,000.000 $2,200.000 $1,314.660 $1,400.000
REMOV STR (HEADWALL)
EA 6.000 $1,500.000 $500.000 $530.000 $850.000 $1,100.000
REMOV STR (PIPE)
LF 450.000 $21.000 $12.000 $13.000 $12.000 $16.000
REMOV STR (BOX CULVERT)
LF 178.200 $90.000 $65.000 $70.000 $75.000 $65.000
MOBILIZATION
LS 1.000 $476,000.000 $540,000.000 $500,000.000 $575,000.000 $650,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $10,543.450 $2,000.000 $20,000.000 $18,000.000 $13,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $26.000 $20.000 $47.000 $46.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $7.750 $10.000 $16.000 $14.000 $20.000
SANDBAGS FOR EROSION CONTROL
EA 460.000 $10.000 $2.000 $3.000 $13.000 $16.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,817.000 $2.500 $2.500 $2.300 $4.500 $4.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,817.000 $0.750 $1.000 $1.000 $1.000 $1.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 400.000 $7.000 $5.000 $5.000 $7.250 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 400.000 $1.000 $1.000 $1.000 $1.500 $2.000
LANDSCAPE PAVERS
SY 8.000 $70.000 $200.000 $320.000 $98.000 $165.000
CONC CURB (TY I)
LF 393.000 $12.500 $30.000 $32.000 $22.000 $20.000
CONC CURB & GUTTER (TY II)
LF 7,336.000 $18.000 $40.000 $41.000 $22.000 $27.000
INTERSECTIONS (CONC)
SY 2,421.000 $100.000 $90.000 $115.000 $97.000 $91.000
INTERSECTIONS (ACP)
SY 1,742.000 $60.000 $90.000 $62.000 $70.000 $105.000
DRIVEWAYS (CONC)
SY 3,816.000 $85.000 $90.000 $95.000 $95.000 $91.000
TURNOUTS (CONC)
SY 212.000 $100.000 $90.000 $95.000 $96.000 $91.000
CONC SIDEWALKS (4")
SY 5,767.000 $65.000 $70.000 $75.000 $64.000 $58.000
CURB RAMPS (TY 10)
EA 54.000 $1,800.000 $1,250.000 $1,300.000 $1,450.000 $1,350.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 14.000 $350.000 $155.000 $200.000 $170.000 $220.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 7.000 $350.000 $160.000 $280.000 $180.000 $231.000
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 1.000 $350.000 $300.000 $400.000 $420.000 $440.000
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 23.000 $4,000.000 $4,800.000 $5,200.000 $5,500.000 $5,500.000
CONDT (PVC) (SCH 80) (2")
LF 4,771.000 $13.500 $11.000 $20.000 $20.000 $20.000
ELEC CONDR (NO.8) BARE
LF 4,771.000 $1.250 $1.400 $2.000 $1.700 $1.650
ELEC CONDR (NO.8) INSULATED
LF 9,542.000 $1.500 $1.400 $2.500 $2.300 $2.200
GROUND BOX TY A (122311)W/APRON
EA 28.000 $1,000.000 $1,000.000 $1,300.000 $1,400.000 $1,350.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $500.000 $750.000 $370.000 $400.000 $500.000
ELC SRV TY A 240/480 060(NS)SS(E)PS(U)
EA 2.000 $6,500.000 $9,000.000 $6,800.000 $7,500.000 $7,150.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 39.000 $550.000 $500.000 $710.000 $550.000 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $650.000 $570.000 $760.000 $610.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $750.000 $730.000 $860.000 $850.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $700.000 $720.000 $910.000 $900.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,250.000 $850.000 $1,200.000 $1,200.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $900.000 $950.000 $1,200.000 $1,250.000 $1,100.000
REMOVE SM RD SN SUP&AM
EA 50.000 $85.000 $40.000 $110.000 $96.000 $88.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 2.000 $500.000 $420.000 $400.000 $300.000 $275.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 60.000 $3.500 $10.000 $11.000 $11.500 $12.100
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 23,660.000 $0.570 $0.650 $0.680 $1.150 $0.830
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 25,346.000 $0.600 $0.650 $0.680 $1.150 $1.050
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,360.000 $1.000 $0.750 $0.600 $2.300 $0.550
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,123.000 $1.000 $0.750 $0.600 $2.300 $0.550
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 434.000 $5.300 $10.000 $10.500 $6.400 $8.030
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,575.000 $0.300 $0.470 $0.500 $0.600 $1.090
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 10,890.000 $0.300 $0.470 $0.500 $0.600 $1.070
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 10,890.000 $0.300 $0.470 $0.500 $0.600 $1.070
REFL PAV MRKR TY I-C
EA 247.000 $3.000 $4.000 $4.500 $4.600 $3.300
REFL PAV MRKR TY II-A-A
EA 270.000 $2.500 $4.000 $4.500 $4.600 $3.300
ELIM EXT PAV MRK & MRKS (4")
LF 17,342.000 $0.800 $0.750 $0.800 $2.000 $0.750
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 2.000 $500.000 $790.000 $270.000 $290.000 $275.000
TREE PROTECTION
EA 5.000 $500.000 $750.000 $210.000 $750.000 $300.000
D-GR HMA TY-B PG64-22
TON 14,446.000 $150.000 $110.000 $81.000 $98.000 $125.000
D-GR HMA TY-D SAC-B PG70-22
TON 17.000 $300.000 $200.000 $210.000 $650.000 $275.000
TACK COAT
GAL 7,221.000 $3.500 $0.010 $3.000 $3.000 $0.010
SP MIXES SP-C SAC-B PG70-22
TON 4,262.000 $150.000 $150.000 $96.000 $116.750 $110.000
TACK COAT
GAL 9,846.000 $3.500 $0.010 $3.000 $3.000 $0.010
TMA (STATIONARY)
DAY 28.000 $132.000 $500.000 $250.000 $450.000 $200.000
Totals: $6,433,482.730 $5,955,500.450 $6,127,420.920 $6,355,559.010 $6,385,255.290