PREPARING ROW
|
STA
|
600.000
|
$5,000.000
|
$3,000.000
|
$5,000.000
|
$2,030.000
|
$1,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
186.000
|
$15.000
|
$50.000
|
$35.000
|
$22.250
|
$112.450
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
CY
|
25,828.000
|
$5.000
|
$2.500
|
$5.000
|
$15.750
|
$40.570
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
292.000
|
$9.000
|
$4.000
|
$25.000
|
$15.750
|
$115.890
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
71,696.000
|
$8.500
|
$5.000
|
$5.000
|
$6.850
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
31,224.000
|
$16.000
|
$6.000
|
$5.000
|
$5.150
|
$10.000
|
|
|
BACKFILL (TY A)
|
STA
|
26.800
|
$200.000
|
$250.000
|
$480.000
|
$289.000
|
$1,066.060
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
50.000
|
$24.000
|
$25.000
|
$10.000
|
$34.750
|
$848.870
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
251,645.000
|
$0.310
|
$0.400
|
$0.360
|
$0.340
|
$0.520
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
251,645.000
|
$0.260
|
$0.350
|
$0.240
|
$0.310
|
$0.470
|
|
|
VEGETATIVE WATERING
|
MG
|
4,235.000
|
$20.000
|
$35.000
|
$40.000
|
$31.500
|
$93.740
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
4,698.000
|
$8.000
|
$1.000
|
$1.000
|
$31.500
|
$36.400
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
41,568.000
|
$36.500
|
$31.000
|
$45.000
|
$42.500
|
$82.880
|
|
|
REWRKING BS MTRL(TY B)(5")(DC)(ORG POS)
|
CY
|
24,233.000
|
$5.000
|
$4.000
|
$10.000
|
$5.250
|
$74.180
|
|
|
REWORK BS MTL(TY B)(13")(DC)(ORG POS)
|
CY
|
16,973.000
|
$5.000
|
$4.000
|
$11.000
|
$5.250
|
$6.250
|
|
|
CEMENT
|
TON
|
7,293.000
|
$215.000
|
$210.000
|
$200.000
|
$240.000
|
$301.680
|
|
|
CEMENT TREAT (EXIST MATL)(12")
|
SY
|
305,533.000
|
$6.000
|
$2.100
|
$2.750
|
$4.150
|
$2.290
|
|
|
CEM TRT (MX EXT MTL/NW BASE)(DC)(10")
|
SY
|
293,788.000
|
$3.000
|
$2.750
|
$2.150
|
$3.400
|
$3.060
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
2,111.000
|
$119.000
|
$128.000
|
$115.000
|
$128.000
|
$209.990
|
|
|
SALV, HAUL & STKPL RCL APH PV (1 1/2")
|
SY
|
10,753.000
|
$3.500
|
$2.000
|
$1.000
|
$2.050
|
$3.550
|
|
|
SALV,HAUL & STKPL RCL APH PV (2")
|
SY
|
103,970.000
|
$6.130
|
$1.250
|
$1.000
|
$2.150
|
$2.390
|
|
|
SLV, HL, & STKPL RCL ASPH PV(2.5-11")
|
SY
|
155,752.000
|
$1.000
|
$2.750
|
$2.000
|
$6.600
|
$6.860
|
|
|
PRIME COAT (MC-30)
|
GAL
|
57,673.000
|
$5.000
|
$4.000
|
$5.000
|
$4.750
|
$6.110
|
|
|
ASPH (TIER II)
|
GAL
|
86,511.000
|
$4.000
|
$6.000
|
$3.250
|
$3.900
|
$4.480
|
|
|
AGGR (TY-B GR-4P SAC-B)
|
CY
|
2,403.000
|
$140.920
|
$60.000
|
$115.000
|
$118.000
|
$181.430
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
6,596.000
|
$1.660
|
$4.000
|
$1.500
|
$2.100
|
$4.570
|
|
|
PLAN & TEXT ASPH CONC PAV (1.5")
|
SY
|
8,459.000
|
$0.920
|
$4.000
|
$1.500
|
$2.150
|
$4.170
|
|
|
CEM STABIL BKFL
|
CY
|
423.900
|
$90.000
|
$140.000
|
$110.000
|
$92.000
|
$146.180
|
|
|
STRUCT EXCAV (SPECIAL)
|
CY
|
366.800
|
$80.000
|
$60.000
|
$110.000
|
$81.500
|
$146.180
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
987.000
|
$3.000
|
$1.000
|
$1.000
|
$7.700
|
$7.310
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
125.000
|
$400.000
|
$1,400.000
|
$600.000
|
$490.000
|
$753.060
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
56.000
|
$575.000
|
$1,200.000
|
$900.000
|
$910.000
|
$1,322.810
|
|
|
CONC BOX CULV (7 FT X 7 FT)
|
LF
|
64.000
|
$1,000.000
|
$1,550.000
|
$1,250.000
|
$1,260.000
|
$1,928.440
|
|
|
RC PIPE (CL III)(18 IN)(SPL)
|
LF
|
2,803.000
|
$70.120
|
$105.000
|
$110.000
|
$78.500
|
$142.440
|
|
|
RC PIPE (CL III)(24 IN)(SPL)
|
LF
|
170.000
|
$94.350
|
$122.000
|
$160.000
|
$94.500
|
$162.200
|
|
|
RC PIPE (CL IV) (24 IN) (SPL)
|
LF
|
267.000
|
$68.590
|
$280.000
|
$160.000
|
$111.000
|
$186.520
|
|
|
RC PIPE (CL IV) (36 IN) (SPL)
|
LF
|
652.000
|
$130.000
|
$400.000
|
$255.000
|
$199.000
|
$349.540
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
1.000
|
$6,500.000
|
$5,200.000
|
$8,500.000
|
$4,010.000
|
$9,405.840
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$8,500.000
|
$10,000.000
|
$15,750.000
|
$10,900.000
|
$14,282.950
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$14,000.000
|
$16,500.000
|
$18,000.000
|
$11,400.000
|
$16,512.480
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
2.000
|
$14,423.570
|
$17,900.000
|
$20,000.000
|
$10,500.000
|
$20,692.860
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
2.000
|
$18,300.000
|
$19,700.000
|
$22,500.000
|
$12,400.000
|
$21,535.900
|
|
|
WINGWALL (FW-0) (HW=7FT) (MOD)
|
EA
|
2.000
|
$31,500.000
|
$43,000.000
|
$32,500.000
|
$17,000.000
|
$50,861.230
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
136.000
|
$1,200.000
|
$1,250.000
|
$1,300.000
|
$1,300.000
|
$1,741.820
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
8.000
|
$1,792.310
|
$1,300.000
|
$1,900.000
|
$1,470.000
|
$2,577.900
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,700.000
|
$1,700.000
|
$2,100.000
|
$1,700.000
|
$2,786.910
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
20.000
|
$4,000.000
|
$1,850.000
|
$3,300.000
|
$6,230.000
|
$5,364.810
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$836.400
|
$850.000
|
$1,250.000
|
$504.000
|
$2,090.190
|
|
|
REMOV STR (WINGWALL)
|
EA
|
6.000
|
$2,000.000
|
$2,900.000
|
$3,000.000
|
$2,280.000
|
$3,483.650
|
|
|
REMOV STR (PIPE)
|
LF
|
2,478.000
|
$13.000
|
$20.000
|
$10.000
|
$15.250
|
$13.940
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
106.000
|
$40.000
|
$330.000
|
$75.000
|
$68.500
|
$118.440
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,820,664.700
|
$2,000,000.000
|
$2,900,000.000
|
$3,250,000.000
|
$3,613,038.730
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
26.000
|
$6,500.000
|
$6,200.000
|
$3,500.000
|
$3,280.000
|
$40,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
100.000
|
$54.000
|
$75.000
|
$73.000
|
$58.500
|
$100.440
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$15.000
|
$30.000
|
$46.000
|
$28.250
|
$40.180
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
1,326.000
|
$30.000
|
$24.000
|
$25.000
|
$15.500
|
$35.640
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,326.000
|
$9.000
|
$12.000
|
$5.000
|
$7.500
|
$14.840
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
770.000
|
$3.500
|
$5.000
|
$10.000
|
$4.600
|
$6.230
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
770.000
|
$1.000
|
$2.000
|
$2.000
|
$1.050
|
$2.210
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
7,296.000
|
$4.000
|
$6.000
|
$6.350
|
$3.350
|
$7.160
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
7,296.000
|
$1.000
|
$2.000
|
$1.500
|
$1.000
|
$1.670
|
|
|
CONSTRUCTING DETOURS
|
SY
|
67,198.000
|
$50.000
|
$34.000
|
$40.000
|
$48.250
|
$60.890
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
17,515.000
|
$40.000
|
$12.000
|
$62.500
|
$81.000
|
$110.780
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
100,125.000
|
$4.000
|
$5.000
|
$2.250
|
$6.200
|
$1.730
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
17,515.000
|
$7.000
|
$12.000
|
$10.000
|
$7.150
|
$7.410
|
|
|
DRIVEWAYS (CONC)
|
SY
|
211.000
|
$85.000
|
$95.000
|
$150.000
|
$67.000
|
$248.750
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,329.000
|
$45.000
|
$45.000
|
$65.000
|
$42.250
|
$98.550
|
|
|
TURNOUTS (ACP)
|
SY
|
1,026.000
|
$95.000
|
$60.000
|
$70.000
|
$34.250
|
$88.620
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
240.000
|
$0.210
|
$115.000
|
$46.630
|
$40.250
|
$19.750
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,390.000
|
$30.000
|
$25.000
|
$24.500
|
$28.750
|
$32.810
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,490.000
|
$3.250
|
$4.000
|
$4.000
|
$4.700
|
$5.360
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$3,300.000
|
$3,300.000
|
$3,274.000
|
$3,830.000
|
$4,384.490
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$272.000
|
$250.000
|
$250.000
|
$293.000
|
$334.800
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
88.000
|
$700.000
|
$1,500.000
|
$1,500.000
|
$1,580.000
|
$3,750.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
42.000
|
$1,000.000
|
$1,400.000
|
$1,400.000
|
$604.000
|
$2,250.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
42.000
|
$27,887.130
|
$26,500.000
|
$26,450.000
|
$31,200.000
|
$11,318.900
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
6.000
|
$450.000
|
$300.000
|
$300.000
|
$351.000
|
$395.720
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 4
|
EA
|
2.000
|
$450.000
|
$400.000
|
$400.000
|
$469.000
|
$398.390
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 4
|
EA
|
1.000
|
$500.000
|
$500.000
|
$500.000
|
$586.000
|
$800.150
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
149.500
|
$31.000
|
$25.000
|
$25.000
|
$29.250
|
$47.530
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
34.000
|
$760.080
|
$800.000
|
$785.000
|
$919.000
|
$1,003.710
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
12.000
|
$800.000
|
$850.000
|
$850.000
|
$996.000
|
$1,286.270
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
30.000
|
$900.000
|
$890.000
|
$885.000
|
$1,040.000
|
$1,319.750
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
12.000
|
$900.000
|
$1,000.000
|
$995.000
|
$1,170.000
|
$1,539.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
6.000
|
$1,200.000
|
$1,200.000
|
$1,150.000
|
$1,350.000
|
$1,847.390
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
75.000
|
$100.000
|
$165.000
|
$150.000
|
$176.000
|
$235.010
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
36.000
|
$92.000
|
$40.000
|
$40.000
|
$46.750
|
$76.990
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
55.000
|
$19.500
|
$165.000
|
$15.000
|
$17.500
|
$19.400
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
79.000
|
$33.000
|
$30.000
|
$30.000
|
$35.250
|
$94.410
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
36.000
|
$4.500
|
$5.000
|
$5.000
|
$5.850
|
$6.700
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
8,704.000
|
$4.000
|
$1.000
|
$1.000
|
$1.150
|
$1.340
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
19,933.000
|
$0.500
|
$0.330
|
$0.320
|
$0.350
|
$0.430
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
17.000
|
$9.500
|
$16.000
|
$16.000
|
$18.750
|
$21.430
|
|
|
WK ZN PAV MRK REMOV (Y)6"(DOT)
|
LF
|
520.000
|
$0.900
|
$0.330
|
$0.320
|
$0.350
|
$0.430
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
19,536.000
|
$0.500
|
$0.330
|
$0.320
|
$0.350
|
$0.430
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
2,319.000
|
$1.750
|
$0.670
|
$0.660
|
$0.800
|
$0.880
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,762.000
|
$1.080
|
$0.900
|
$0.880
|
$1.050
|
$1.180
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
416.000
|
$3.500
|
$1.200
|
$1.200
|
$1.400
|
$1.610
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
148.000
|
$8.700
|
$16.000
|
$16.000
|
$18.750
|
$21.430
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
8.000
|
$165.000
|
$150.000
|
$150.000
|
$176.000
|
$200.880
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$300.000
|
$250.000
|
$250.000
|
$293.000
|
$334.800
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
3,275.000
|
$4.900
|
$1.250
|
$1.200
|
$1.400
|
$1.610
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
8,385.000
|
$0.670
|
$0.670
|
$0.660
|
$0.800
|
$0.880
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
361,372.000
|
$0.650
|
$0.600
|
$0.580
|
$0.670
|
$0.780
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
12,545.000
|
$0.700
|
$0.670
|
$0.660
|
$0.800
|
$0.880
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
417,994.000
|
$0.640
|
$0.600
|
$0.580
|
$0.670
|
$0.780
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
118,828.000
|
$0.810
|
$0.900
|
$0.880
|
$1.050
|
$1.180
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
6,203.000
|
$0.800
|
$0.900
|
$0.880
|
$1.050
|
$1.180
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
4.000
|
$227.000
|
$200.000
|
$200.000
|
$234.000
|
$267.840
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
12.000
|
$530.000
|
$450.000
|
$450.000
|
$527.000
|
$602.630
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
4.000
|
$260.000
|
$300.000
|
$300.000
|
$351.000
|
$401.760
|
|
REFL PAV MRKR TY I-C
|
EA
|
561.000
|
$4.070
|
$5.000
|
$5.000
|
$5.850
|
$6.700
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,819.000
|
$4.000
|
$5.000
|
$5.000
|
$5.850
|
$6.700
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
385,545.000
|
$0.420
|
$0.300
|
$0.280
|
$0.340
|
$0.370
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
130.000
|
$0.850
|
$0.600
|
$0.600
|
$0.750
|
$0.800
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
450.000
|
$1.750
|
$1.000
|
$1.000
|
$1.150
|
$1.340
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$65.000
|
$200.000
|
$200.000
|
$230.000
|
$267.840
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
1.000
|
$65.000
|
$200.000
|
$200.000
|
$234.000
|
$267.840
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
120,020.000
|
$2.500
|
$1.100
|
$1.000
|
$2.800
|
$1.240
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
49,318.000
|
$128.000
|
$114.250
|
$130.000
|
$137.000
|
$164.680
|
|
|
BONDING COURSE
|
GAL
|
40,374.000
|
$4.300
|
$2.800
|
$3.000
|
$3.750
|
$6.700
|
|
|
BIRD EXCLUSION METHOD
|
SF
|
2,240.000
|
$3.000
|
$9.000
|
$3.500
|
$13.250
|
$12.050
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$4,000.000
|
$5,000.000
|
$21,000.000
|
$5,860.000
|
$26,614.210
|
|
|
TMA (STATIONARY)
|
DAY
|
520.000
|
$100.000
|
$17.000
|
$50.000
|
$146.000
|
$636.910
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
260.000
|
$120.000
|
$0.010
|
$0.100
|
$176.000
|
$1,194.380
|
|
Totals: |
$30,872,296.010
|
$24,639,662.300
|
$28,831,817.990
|
$31,443,202.745
|
$41,902,671.529
|