STARR FM 755 (1103-04-039)

Items: 125

County: STARR
Length: N/A
Highway: FM 755
District: PHARR
Control Number: 1103-04-039
DBE Goal: 0.0%
Project: C 1103-4-39
Guaranty: N/A
Time: 520 WORKING DAYS
Engineer's Estimate: $30,872,296.01
Date: 07/10/2024 (1 year ago)
Contract Number: N/A
Type: RECONSTRUCT EXISTING ROADWAY
Mail/Deliver Bids To: N/A
FRANCISCO J CANTU
DANNY FLORES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$30,872,296.01
$24,639,662.30
Over/Under Est: -20.19% -$6,232,633.71
$28,831,817.99
Over/Under Est: -6.61% -$2,040,478.02
Amt Left: 17.01% $4,192,155.69
$31,443,202.74
Over/Under Est: 1.85% $570,906.73
Amt Left: 27.61% $6,803,540.44
Delta: -9.06% -$2,611,384.75
Over/Under Est: 35.73% $11,030,375.50
Amt Left: 70.06% $17,263,009.21
Delta: -33.26% -$10,459,468.77
Subcontractor Percentage Amount
DEPENDABLE FENCE 5.75% $1,418,463.34
HIGHWAY BARRICADES AND SERVICES, LLC 3.01% $742,534.72
SOIL TECH ADVANCE INC. 1.09% $268,891.31
TEXAS HIGHWAY SYSTEMS, INC. 0.68% $167,748.71
*AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. 0.02% $4,933.79
Total: 10.55% $2,602,571.87

Bid Items & Bid Tabulations

125 Total 0 of 125
STARR  |  FM 755  |  PHARR  |  1103-04-039  |  07/10/2024  |  $30,872,296.01  |  C 1103-4-39  |  RECON EXIST ROADWAY  |  520 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
IOC COMPANY, LLC
REIM CONSTRUCTION, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
PREPARING ROW
STA 600.000 $5,000.000 $3,000.000 $5,000.000 $2,030.000 $1,000.000
REMOVING CONC (DRIVEWAYS)
SY 186.000 $15.000 $50.000 $35.000 $22.250 $112.450
REMOVING STAB BASE AND ASPH PAV (6")
CY 25,828.000 $5.000 $2.500 $5.000 $15.750 $40.570
OBLITERATING ABANDONED ROAD
SY 292.000 $9.000 $4.000 $25.000 $15.750 $115.890
EXCAVATION (ROADWAY)
CY 71,696.000 $8.500 $5.000 $5.000 $6.850 $25.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 31,224.000 $16.000 $6.000 $5.000 $5.150 $10.000
BACKFILL (TY A)
STA 26.800 $200.000 $250.000 $480.000 $289.000 $1,066.060
FURNISHING AND PLACING TOPSOIL
CY 50.000 $24.000 $25.000 $10.000 $34.750 $848.870
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 251,645.000 $0.310 $0.400 $0.360 $0.340 $0.520
DRILL SEEDING (TEMP) (WARM)
SY 251,645.000 $0.260 $0.350 $0.240 $0.310 $0.470
VEGETATIVE WATERING
MG 4,235.000 $20.000 $35.000 $40.000 $31.500 $93.740
SPRINKLING (DUST CONTROL)
MG 4,698.000 $8.000 $1.000 $1.000 $31.500 $36.400
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 41,568.000 $36.500 $31.000 $45.000 $42.500 $82.880
REWRKING BS MTRL(TY B)(5")(DC)(ORG POS)
CY 24,233.000 $5.000 $4.000 $10.000 $5.250 $74.180
REWORK BS MTL(TY B)(13")(DC)(ORG POS)
CY 16,973.000 $5.000 $4.000 $11.000 $5.250 $6.250
CEMENT
TON 7,293.000 $215.000 $210.000 $200.000 $240.000 $301.680
CEMENT TREAT (EXIST MATL)(12")
SY 305,533.000 $6.000 $2.100 $2.750 $4.150 $2.290
CEM TRT (MX EXT MTL/NW BASE)(DC)(10")
SY 293,788.000 $3.000 $2.750 $2.150 $3.400 $3.060
ASPHALT STAB BASE (GR 4)(PG 64)
TON 2,111.000 $119.000 $128.000 $115.000 $128.000 $209.990
SALV, HAUL & STKPL RCL APH PV (1 1/2")
SY 10,753.000 $3.500 $2.000 $1.000 $2.050 $3.550
SALV,HAUL & STKPL RCL APH PV (2")
SY 103,970.000 $6.130 $1.250 $1.000 $2.150 $2.390
SLV, HL, & STKPL RCL ASPH PV(2.5-11")
SY 155,752.000 $1.000 $2.750 $2.000 $6.600 $6.860
PRIME COAT (MC-30)
GAL 57,673.000 $5.000 $4.000 $5.000 $4.750 $6.110
ASPH (TIER II)
GAL 86,511.000 $4.000 $6.000 $3.250 $3.900 $4.480
AGGR (TY-B GR-4P SAC-B)
CY 2,403.000 $140.920 $60.000 $115.000 $118.000 $181.430
PLANE ASPH CONC PAV (1.5")
SY 6,596.000 $1.660 $4.000 $1.500 $2.100 $4.570
PLAN & TEXT ASPH CONC PAV (1.5")
SY 8,459.000 $0.920 $4.000 $1.500 $2.150 $4.170
CEM STABIL BKFL
CY 423.900 $90.000 $140.000 $110.000 $92.000 $146.180
STRUCT EXCAV (SPECIAL)
CY 366.800 $80.000 $60.000 $110.000 $81.500 $146.180
TRENCH EXCAVATION PROTECTION
LF 987.000 $3.000 $1.000 $1.000 $7.700 $7.310
RIPRAP (MOW STRIP)(4 IN)
CY 125.000 $400.000 $1,400.000 $600.000 $490.000 $753.060
CONC BOX CULV (6 FT X 4 FT)
LF 56.000 $575.000 $1,200.000 $900.000 $910.000 $1,322.810
CONC BOX CULV (7 FT X 7 FT)
LF 64.000 $1,000.000 $1,550.000 $1,250.000 $1,260.000 $1,928.440
RC PIPE (CL III)(18 IN)(SPL)
LF 2,803.000 $70.120 $105.000 $110.000 $78.500 $142.440
RC PIPE (CL III)(24 IN)(SPL)
LF 170.000 $94.350 $122.000 $160.000 $94.500 $162.200
RC PIPE (CL IV) (24 IN) (SPL)
LF 267.000 $68.590 $280.000 $160.000 $111.000 $186.520
RC PIPE (CL IV) (36 IN) (SPL)
LF 652.000 $130.000 $400.000 $255.000 $199.000 $349.540
INLET (COMPL)(PSL)(RC)(4FTX4FT)
EA 1.000 $6,500.000 $5,200.000 $8,500.000 $4,010.000 $9,405.840
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $8,500.000 $10,000.000 $15,750.000 $10,900.000 $14,282.950
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $14,000.000 $16,500.000 $18,000.000 $11,400.000 $16,512.480
WINGWALL (FW - 0) (HW=3 FT)
EA 2.000 $14,423.570 $17,900.000 $20,000.000 $10,500.000 $20,692.860
WINGWALL (FW - 0) (HW=4 FT)
EA 2.000 $18,300.000 $19,700.000 $22,500.000 $12,400.000 $21,535.900
WINGWALL (FW-0) (HW=7FT) (MOD)
EA 2.000 $31,500.000 $43,000.000 $32,500.000 $17,000.000 $50,861.230
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 136.000 $1,200.000 $1,250.000 $1,300.000 $1,300.000 $1,741.820
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 8.000 $1,792.310 $1,300.000 $1,900.000 $1,470.000 $2,577.900
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $1,700.000 $1,700.000 $2,100.000 $1,700.000 $2,786.910
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 20.000 $4,000.000 $1,850.000 $3,300.000 $6,230.000 $5,364.810
REMOV STR (INLET)
EA 1.000 $836.400 $850.000 $1,250.000 $504.000 $2,090.190
REMOV STR (WINGWALL)
EA 6.000 $2,000.000 $2,900.000 $3,000.000 $2,280.000 $3,483.650
REMOV STR (PIPE)
LF 2,478.000 $13.000 $20.000 $10.000 $15.250 $13.940
REMOV STR (BOX CULVERT)
LF 106.000 $40.000 $330.000 $75.000 $68.500 $118.440
MOBILIZATION
LS 1.000 $2,820,664.700 $2,000,000.000 $2,900,000.000 $3,250,000.000 $3,613,038.730
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 26.000 $6,500.000 $6,200.000 $3,500.000 $3,280.000 $40,000.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 100.000 $54.000 $75.000 $73.000 $58.500 $100.440
ROCK FILTER DAMS (REMOVE)
LF 100.000 $15.000 $30.000 $46.000 $28.250 $40.180
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 1,326.000 $30.000 $24.000 $25.000 $15.500 $35.640
CONSTRUCTION EXITS (REMOVE)
SY 1,326.000 $9.000 $12.000 $5.000 $7.500 $14.840
TEMP SEDMT CONT FENCE (INSTALL)
LF 770.000 $3.500 $5.000 $10.000 $4.600 $6.230
TEMP SEDMT CONT FENCE (REMOVE)
LF 770.000 $1.000 $2.000 $2.000 $1.050 $2.210
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 7,296.000 $4.000 $6.000 $6.350 $3.350 $7.160
BIODEG EROSN CONT LOGS (REMOVE)
LF 7,296.000 $1.000 $2.000 $1.500 $1.000 $1.670
CONSTRUCTING DETOURS
SY 67,198.000 $50.000 $34.000 $40.000 $48.250 $60.890
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 17,515.000 $40.000 $12.000 $62.500 $81.000 $110.780
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 100,125.000 $4.000 $5.000 $2.250 $6.200 $1.730
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 17,515.000 $7.000 $12.000 $10.000 $7.150 $7.410
DRIVEWAYS (CONC)
SY 211.000 $85.000 $95.000 $150.000 $67.000 $248.750
DRIVEWAYS (ACP)
SY 4,329.000 $45.000 $45.000 $65.000 $42.250 $98.550
TURNOUTS (ACP)
SY 1,026.000 $95.000 $60.000 $70.000 $34.250 $88.620
RUMBLE STRIPS (SHOULDER)
LF 240.000 $0.210 $115.000 $46.630 $40.250 $19.750
MTL W-BEAM GD FEN (TIM POST)
LF 2,390.000 $30.000 $25.000 $24.500 $28.750 $32.810
REMOVE METAL BEAM GUARD FENCE
LF 1,490.000 $3.250 $4.000 $4.000 $4.700 $5.360
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,300.000 $3,300.000 $3,274.000 $3,830.000 $4,384.490
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $272.000 $250.000 $250.000 $293.000 $334.800
CRASH CUSH ATTEN (MOVE & RESET)
EA 88.000 $700.000 $1,500.000 $1,500.000 $1,580.000 $3,750.000
CRASH CUSH ATTEN (REMOVE)
EA 42.000 $1,000.000 $1,400.000 $1,400.000 $604.000 $2,250.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 42.000 $27,887.130 $26,500.000 $26,450.000 $31,200.000 $11,318.900
MAILBOX INSTALL-S (TWG-POST) TY 4
EA 6.000 $450.000 $300.000 $300.000 $351.000 $395.720
MAILBOX INSTALL-D (TWG-POST) TY 4
EA 2.000 $450.000 $400.000 $400.000 $469.000 $398.390
MAILBOX INSTALL-M (TWG-POST) TY 4
EA 1.000 $500.000 $500.000 $500.000 $586.000 $800.150
ALUMINUM SIGNS (TY A)
SF 149.500 $31.000 $25.000 $25.000 $29.250 $47.530
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 34.000 $760.080 $800.000 $785.000 $919.000 $1,003.710
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 12.000 $800.000 $850.000 $850.000 $996.000 $1,286.270
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 30.000 $900.000 $890.000 $885.000 $1,040.000 $1,319.750
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 12.000 $900.000 $1,000.000 $995.000 $1,170.000 $1,539.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 6.000 $1,200.000 $1,200.000 $1,150.000 $1,350.000 $1,847.390
REMOVE SM RD SN SUP&AM
EA 75.000 $100.000 $165.000 $150.000 $176.000 $235.010
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 36.000 $92.000 $40.000 $40.000 $46.750 $76.990
REMOVE DELIN & OBJECT MARKER ASSMS
EA 55.000 $19.500 $165.000 $15.000 $17.500 $19.400
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 79.000 $33.000 $30.000 $30.000 $35.250 $94.410
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 36.000 $4.500 $5.000 $5.000 $5.850 $6.700
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 8,704.000 $4.000 $1.000 $1.000 $1.150 $1.340
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 19,933.000 $0.500 $0.330 $0.320 $0.350 $0.430
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 17.000 $9.500 $16.000 $16.000 $18.750 $21.430
WK ZN PAV MRK REMOV (Y)6"(DOT)
LF 520.000 $0.900 $0.330 $0.320 $0.350 $0.430
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 19,536.000 $0.500 $0.330 $0.320 $0.350 $0.430
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 2,319.000 $1.750 $0.670 $0.660 $0.800 $0.880
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,762.000 $1.080 $0.900 $0.880 $1.050 $1.180
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 416.000 $3.500 $1.200 $1.200 $1.400 $1.610
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 148.000 $8.700 $16.000 $16.000 $18.750 $21.430
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 8.000 $165.000 $150.000 $150.000 $176.000 $200.880
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $300.000 $250.000 $250.000 $293.000 $334.800
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 3,275.000 $4.900 $1.250 $1.200 $1.400 $1.610
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 8,385.000 $0.670 $0.670 $0.660 $0.800 $0.880
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 361,372.000 $0.650 $0.600 $0.580 $0.670 $0.780
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 12,545.000 $0.700 $0.670 $0.660 $0.800 $0.880
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 417,994.000 $0.640 $0.600 $0.580 $0.670 $0.780
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 118,828.000 $0.810 $0.900 $0.880 $1.050 $1.180
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 6,203.000 $0.800 $0.900 $0.880 $1.050 $1.180
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $227.000 $200.000 $200.000 $234.000 $267.840
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 12.000 $530.000 $450.000 $450.000 $527.000 $602.630
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $260.000 $300.000 $300.000 $351.000 $401.760
REFL PAV MRKR TY I-C
EA 561.000 $4.070 $5.000 $5.000 $5.850 $6.700
REFL PAV MRKR TY II-A-A
EA 2,819.000 $4.000 $5.000 $5.000 $5.850 $6.700
ELIM EXT PAV MRK & MRKS (4")
LF 385,545.000 $0.420 $0.300 $0.280 $0.340 $0.370
ELIM EXT PAV MRK & MRKS (8")
LF 130.000 $0.850 $0.600 $0.600 $0.750 $0.800
ELIM EXT PAV MRK & MRKS (12")
LF 450.000 $1.750 $1.000 $1.000 $1.150 $1.340
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $65.000 $200.000 $200.000 $230.000 $267.840
ELIM EXT PAV MRK & MRKS (WORD)
EA 1.000 $65.000 $200.000 $200.000 $234.000 $267.840
DITCH CLEANING AND RESHAPING (FOOT)
LF 120,020.000 $2.500 $1.100 $1.000 $2.800 $1.240
SP MIXES SP-D SAC-A PG76-22
TON 49,318.000 $128.000 $114.250 $130.000 $137.000 $164.680
BONDING COURSE
GAL 40,374.000 $4.300 $2.800 $3.000 $3.750 $6.700
BIRD EXCLUSION METHOD
SF 2,240.000 $3.000 $9.000 $3.500 $13.250 $12.050
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $4,000.000 $5,000.000 $21,000.000 $5,860.000 $26,614.210
TMA (STATIONARY)
DAY 520.000 $100.000 $17.000 $50.000 $146.000 $636.910
TMA (MOBILE OPERATION)
DAY 260.000 $120.000 $0.010 $0.100 $176.000 $1,194.380
Totals: $30,872,296.010 $24,639,662.300 $28,831,817.990 $31,443,202.745 $41,902,671.529