Show Job Controls
Bid Cobra

SMITH FM 756 (0492-04-047)

Items: 64

County: SMITH
Length: 0.0000 MILES
Highway: FM 756
District: TYLER
Control Number: 0492-04-047
DBE Goal: 0.0%
Project: F 2026(219)
Guaranty: $53,000.00
Time: WORKING DAYS
Engineer's Estimate: $2,636,545.88
Date: 01/06/2026 (5 months ago)
Contract Number: 1263020
Type: RESURFACE ROADWAY
Project ID: A00196225
Contract Type: Federal
Project Description: 2" MILL AND INLAY W/ SMA
Mail/Deliver Bids To: N/A
PAUL SCHNEIDER
JOSH FULTON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$2,636,545.88
Over/Under Est: 15.94% $420,210.47
Over/Under Est: 20.27% $534,439.07
Amt Left: 3.74% $114,228.60
Over/Under Est: 26.89% $709,067.05
Amt Left: 9.45% $288,856.58
Delta: -5.51% -$174,627.98
Over/Under Est: 51.8% $1,365,673.39
Amt Left: 30.93% $945,462.92
Delta: -19.63% -$656,606.34
Subcontractor Percentage Amount
STRIPING TECHNOLOGY, L.P. 5.13% $156,811.60
RED BARON BUILDING COMPANY, LLC 3.74% $114,322.69
MORRIS COUNTY CONTRACTORS, L.L.C. 0.78% $23,842.70
DIAMOND ELITE BARRICADES, LLC 0.19% $5,807.84
Total: 9.84% $300,784.83

Bid Items & Bid Tabulations

64 Total 0 of 64
SMITH  |  FM 756  |  TYLER  |  0492-04-047  |  01/06/2026  |  $2,636,545.88  |  F 2026(219)  |  RESURF ROADWAY  |  WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DREWERY CONSTRUCTION COMPANY, INCORPORATED
BIG CREEK CONSTRUCTION, LTD.
LONGVIEW BRIDGE AND ROAD, LTD.
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 3.000 $2,500.000 $6,500.000 $25,000.000 $10,000.000 $22,000.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 50.000 $15.000 $20.000 $30.000 $25.000 $50.000
EMBANK (VEH)(OC)(TY C)
CY 36.000 $25.000 $250.000 $100.000 $200.000 $200.000
BACKFILL (TY A)
STA 3.000 $335.000 $500.000 $1,200.000 $2,500.000 $1,500.000
FURN & PLACE TOPSOIL (4")
SY 134.000 $3.000 $6.000 $10.000 $30.000 $10.000
BROADCAST SEED (PERM_RURAL_SAND)
SY 134.000 $0.250 $4.000 $2.250 $10.500 $2.350
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 268.000 $0.600 $6.000 $5.250 $8.800 $6.000
BOND FBR MTRX SEED (TEMP)(WARM)
SY 134.000 $0.550 $6.000 $5.250 $16.500 $6.000
BOND FBR MTRX SEED (TEMP)(COOL)
SY 134.000 $0.550 $6.000 $5.250 $16.500 $6.000
VEGETATIVE WATERING
TGL 7.400 $15.000 $100.000 $25.000 $20.000 $85.000
SP MIXES SP-D PG76-22
TON 323.000 $133.000 $225.000 $250.000 $275.000 $475.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 9,303.000 $150.000 $186.750 $190.000 $192.000 $225.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 2,000.000 $85.000 $80.000 $80.000 $90.000 $105.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 16,357.000 $1.700 $3.000 $2.750 $2.000 $3.420
PLANE ASPH CONC PAV(2")
SY 83,821.000 $3.250 $3.000 $2.750 $3.000 $3.420
RIPRAP (CONC)(4 IN)
CY 6.000 $550.000 $1,600.000 $750.000 $750.000 $1,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 66.000 $650.000 $625.000 $750.000 $550.000 $790.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 190.000 $175.000 $450.000 $225.000 $215.000 $320.000
MOBILIZATION
LS 1.000 $250,000.000 $295,000.000 $280,000.000 $300,000.000 $406,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $8,000.000 $3,500.000 $5,000.000 $36,000.000 $70,268.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 340.000 $110.000 $100.000 $125.000 $200.000 $75.000
TMA (STATIONARY)
DAY 60.000 $150.000 $100.000 $450.000 $250.000 $455.000
TMA (MOBILE OPERATION)
DAY 60.000 $150.000 $200.000 $250.000 $500.000 $1.050
CONC CURB & GUTTER (TY II)
LF 50.000 $25.000 $100.000 $130.000 $80.000 $80.000
MTL W-BEAM GD FEN (STEEL POST)
LF 250.000 $30.000 $38.500 $32.500 $35.200 $34.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 50.000 $112.000 $100.000 $85.000 $103.000 $87.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,400.000 $3,250.000 $3,300.000 $3,400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 20.000 $600.000 $790.000 $700.000 $720.000 $755.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 10.000 $600.000 $850.000 $900.000 $920.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $1,000.000 $1,250.000 $1,000.000 $1,050.000 $1,100.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 4.000 $200.000 $340.000 $220.000 $225.000 $235.000
REMOVE SM RD SN SUP&AM
EA 46.000 $100.000 $100.000 $110.000 $112.000 $115.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $30.000 $40.000 $27.500 $30.000 $29.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 4.000 $80.000 $300.000 $50.000 $75.000 $52.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 23,940.000 $0.450 $0.550 $0.500 $0.550 $0.570
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 300.000 $0.190 $2.250 $2.000 $2.200 $2.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,200.000 $1.500 $1.100 $1.000 $1.100 $1.150
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 944.000 $3.400 $4.000 $3.500 $3.850 $3.993
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 2,693.000 $0.450 $0.550 $0.500 $0.550 $0.570
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 23,940.000 $0.500 $0.550 $0.500 $0.550 $0.570
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 2,693.000 $1.700 $1.500 $3.000 $2.650 $1.141
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 2,693.000 $1.700 $1.500 $3.000 $2.650 $1.141
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 398.000 $2.160 $3.000 $2.500 $2.750 $2.852
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 1,062.000 $2.200 $2.250 $2.000 $2.200 $2.282
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,485.000 $1.500 $1.350 $1.150 $1.270 $1.312
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
LF 128.000 $7.000 $6.000 $5.000 $5.500 $5.705
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,796.000 $7.500 $6.500 $5.700 $6.270 $6.504
PAVEMENT SLER 24"
LF 1,108.000 $2.100 $2.800 $2.500 $2.750 $2.852
PAVEMENT SLER (YLD TRI)
EA 31.000 $11.000 $28.000 $25.000 $27.500 $28.525
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 6,600.000 $1.100 $1.000 $0.850 $0.940 $0.970
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 26,400.000 $0.700 $0.800 $0.750 $0.830 $0.856
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 6,600.000 $1.100 $1.000 $0.850 $0.940 $0.970
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 26,652.000 $0.700 $0.800 $0.750 $0.830 $0.856
PREFAB PM TY C (W)(ARROW)
EA 30.000 $235.000 $250.000 $218.500 $240.000 $249.305
PREFAB PM TY C (W)(WORD)
EA 12.000 $235.000 $300.000 $248.500 $275.000 $283.535
PREFAB PM TY C (W)(36")(YLD TRI)
EA 31.000 $45.000 $50.000 $42.500 $46.750 $48.492
REFL PAV MRKR TY I-C
EA 1,010.000 $5.000 $6.000 $5.000 $5.500 $5.705
REFL PAV MRKR TY II-A-A
EA 6,720.000 $5.000 $6.000 $5.000 $5.500 $5.705
ELIM EXT PM & MRKS (24")
LF 1,108.000 $3.000 $2.250 $2.000 $2.200 $2.282
ELIM EXT PM & MRKS (36")(YLD TRI)
EA 31.000 $20.000 $60.000 $50.000 $55.000 $57.049
PAV SURF PREP FOR MRK (24")
LF 1,108.000 $1.200 $1.100 $1.000 $1.100 $1.141
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 31.000 $12.000 $23.000 $20.000 $22.000 $22.820
NO. OF WORKING DAYS
$/D 7,500.000 $7,500.000 $45.000 $60.000 $71.000 $71.000
MEMBRANE UNDERSEAL
GAL 16,890.000 $5.000 $0.010 $5.000 $5.500 $4.564
Totals: $58,886,545.880 $3,394,256.350 $3,620,984.950 $3,878,112.930 $4,534,719.270