PREPARING ROW
|
STA
|
238.000
|
|
|
REMOV CONC (PAV)
|
SY
|
1,028.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
936.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
2,386.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
202.000
|
|
|
REMOV CONC (CURB & GUTTER)
|
LF
|
2,012.000
|
|
|
RMV (12"-16") TRT/UNTRT BASE & ASPH PAV
|
SY
|
31,416.000
|
|
|
RMV (16"-20") TRT/UNTRT BASE & ASPH PAV
|
SY
|
6,032.000
|
|
|
RMV (8") TRT/UNTRT BASE & ASPH PAV
|
SY
|
51,603.000
|
|
|
RMV (16") TRT/UNTRT BASE & ASPH PAV
|
SY
|
14,006.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
550,728.000
|
|
|
EXCAV (CHANNEL)
|
CY
|
18.000
|
|
|
EMBANK (FNL)(DC)(TY A)
|
CY
|
113,872.000
|
|
|
SPEC EXCAV WORK (BACKHOE)
|
HR
|
84.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
242,659.000
|
|
|
BROADCAST SEED (PERM_RURAL_SAND)
|
SY
|
225,593.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
451,204.000
|
|
|
BOND FBR MTRX SEED (TEMP)(WARM)
|
SY
|
225,593.000
|
|
|
BOND FBR MTRX SEED (TEMP)(COOL)
|
SY
|
225,593.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
9,926.000
|
|
|
SOIL RET BLKT(SL_MOD_SAND_LONG)
|
SY
|
8,128.000
|
|
|
WILDFLOWER SEEDING
|
AC
|
11.180
|
|
|
PROOF ROLLING
|
HR
|
400.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 1-2) (9")
|
SY
|
230,417.000
|
|
|
LIME (QUICKLIME (DRY))
|
TON
|
2,592.000
|
|
|
LIME TRT (EXIST MATL)(10")
|
SY
|
115,221.000
|
|
|
CEMENT
|
TON
|
2,592.000
|
|
|
CEMENT TRT (EXIST MATL)(10")
|
SY
|
115,221.000
|
|
|
PRIME COAT & BLOTTER (MC-30)
|
GAL
|
69,125.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
123,960.000
|
|
|
AGGR (TY-PD OR PL, GR-4)
|
CY
|
1,809.000
|
|
|
AGGR (TY-PD GR-5 OR TY-PL GR-5)
|
CY
|
1,468.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
52,866.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
25,740.000
|
|
|
TACK COAT
|
GAL
|
22,709.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
9,523.000
|
|
|
CONC PVMT (CRCP) (10")
|
SY
|
923.000
|
|
|
CUT & RESTORING PAV
|
SY
|
131.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,173.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
187.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
22,974.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
14,744.000
|
|
|
SOIL NAIL ANCHORS
|
LF
|
37,719.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
240.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
2,670.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
1,480.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
340.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
14.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
48.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
24.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (24 IN)
|
LF
|
42.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
65.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
44.000
|
|
|
CL A CONC (CURB OUTLET)(TY I)
|
EA
|
1.000
|
|
|
CL A CONC (CURB OUTLET)(TY II)
|
EA
|
2.000
|
|
|
CL C CONC (ABUT)
|
CY
|
216.200
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
57.900
|
|
|
CL C CONC (CAP)
|
CY
|
231.200
|
|
|
CL C CONC (CAP)(MASS)
|
CY
|
108.100
|
|
|
CL C CONC (COLUMN)
|
CY
|
87.400
|
|
|
CL C CONC (COLUMN)(MASS)
|
CY
|
112.400
|
|
|
CL C CONC (FOOTING)(MASS)
|
CY
|
78.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
251.600
|
|
|
CL C CONC (COLLAR)
|
EA
|
2.000
|
|
|
CL C CONC (MISC)
|
CY
|
1.000
|
|
|
REINF CONC SLAB
|
SF
|
63,350.000
|
|
|
REINF CONC SLAB (EXTEND SLAB)
|
SF
|
15,187.000
|
|
|
APPROACH SLAB
|
CY
|
397.100
|
|
|
APPROACH SLAB (EXTEND)
|
CY
|
65.800
|
|
|
RETAINING WALL (MSE)
|
SF
|
21,387.000
|
|
|
RETAINING WALL (SOIL NAIL) (FASCIA)
|
SF
|
26,709.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
2,785.400
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
6,672.130
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
75.800
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
54.000
|
|
|
RIPRAP (CONC)(CL A)
|
CY
|
1.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
10.200
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
70.900
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
836.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
695.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
400.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL7)
|
LF
|
136.000
|
|
|
STR STEEL (MISC NON-BRIDGE)
|
LB
|
1,308.000
|
|
|
MISC NON-BRIDGE (NBIS)
|
LB
|
28.000
|
|
|
RAIL (TY SSTR)
|
LF
|
2,607.480
|
|
|
RAIL (TY C221)
|
LF
|
1,432.000
|
|
|
RAIL (TY SSTR)(MOD)
|
LF
|
1,799.700
|
|
|
RETROFIT RAIL (TY C221)
|
LF
|
374.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
466.000
|
|
|
ARMOR JOINT SEALED (MOD)
|
LF
|
126.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
85.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
146.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
132.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)
|
LF
|
344.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
120.000
|
|
|
CONC BOX CULV (6 FT X 11 FT)
|
LF
|
20.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
12,426.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
6,368.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
2,736.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
3,141.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
1,162.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
1,978.000
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
13.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
14.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
1.000
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
3.000
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
1.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
133.000
|
|
|
INLET (COMPL)(PCO)(4FT)(BOTH)
|
EA
|
23.000
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
6.000
|
|
|
INLET (COMPL)(PCO)(6FT)(BOTH)
|
EA
|
6.000
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
9.000
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
5.000
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
1.000
|
|
|
JCT BOX (COMPL)(SPL)
|
EA
|
1.000
|
|
|
INLET (COMPL) (TY MSE2)
|
EA
|
12.000
|
|
|
HEADWALL (CH - FW - 30) (DIA= 42 IN)
|
EA
|
1.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
2.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
1.000
|
|
|
WINGWALL (PW - 2) (HW=12 FT)
|
EA
|
2.000
|
|
|
WINGWALL (PW - 2) (HW=16 FT)
|
EA
|
1.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
27.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
9.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
1.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
145.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
2.000
|
|
|
REMOV STR (INLET)
|
EA
|
6.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
374.000
|
|
|
REMOV STR (PIPE)
|
EA
|
95.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
44.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
600.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,296.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
129.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
2,323.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,323.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
880.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
880.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
37,011.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
37,011.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
12,021.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
1,980.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
450.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
1,980.000
|
|
|
PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
333.800
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
2,346.200
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
319.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
408.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
47,129.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
4,421.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
9,176.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
20,456.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
20.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
24.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
2.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
6.000
|
|
|
CONC MEDIAN
|
SY
|
2,129.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
100.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
637.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
12.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
6.000
|
|
|
CCA (INSTL)(N)(TL3)(WORK ZONE)
|
EA
|
8.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
2,362.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
48.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
5.000
|
|
|
RELOCATE RD IL ASM (SHOE-BASE)
|
EA
|
3.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,054.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
210.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
290.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
684.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
430.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
3,008.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
5,686.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
65.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
130.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
3.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
11.000
|
|
|
REMOVE GROUND BOX
|
EA
|
3.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
|
EA
|
2.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
390.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
70.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
16.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
3.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
2.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
109.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
2,035.000
|
|
|
REMOVE LRSA
|
EA
|
2.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
78.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
77.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
|
EA
|
10.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
24.000
|
|
|
INSTL OM ASSM (OM-3L)(WFLX)GND
|
EA
|
6.000
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)GND
|
EA
|
7.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
30,803.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
568.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
40,814.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
2,795.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
122.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
132.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
210.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
65,163.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,623.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
574.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
1.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
1.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
72,079.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
597.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
284.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
12,328.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
519.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,075.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,486.000
|
|
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
|
LF
|
10,680.000
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
55,007.000
|
|
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
|
LF
|
6,960.000
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
78,580.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
6,443.000
|
|
|
PAVEMENT SLER 8"
|
LF
|
464.000
|
|
|
PAVEMENT SLER 24"
|
LF
|
196.000
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
2.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
2.000
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
54.000
|
|
PREFAB PM TY C (W)(DBL ARROW)
|
EA
|
4.000
|
|
PREFAB PM TY C (W)(LN REDUCT ARROW)
|
EA
|
2.000
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
42.000
|
|
PREFAB PM TY C (W)(36")(YLD TRI)
|
EA
|
53.000
|
|
PREFAB PM TY C (W)(BIKE ARROW)
|
EA
|
41.000
|
|
PREFAB PM TY C (W)(BIKE SYMBOL)
|
EA
|
41.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
939.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,527.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
174.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
44,216.000
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
53,117.000
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
2,237.000
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
561.000
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
395.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
2.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
2.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
15.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
12.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
15.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
17.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
19.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
5.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
14.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)ALUM
|
EA
|
16.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)ALUM
|
EA
|
5.000
|
|
|
BACKPLATE W/REFL BRDR(5 SEC)ALUM
|
EA
|
3.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
|
LF
|
2,350.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
2,106.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
432.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(16 CONDR)
|
LF
|
1,265.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM&ILSN
|
EA
|
2.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM&ILSN
|
EA
|
2.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM&ILSN
|
EA
|
1.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM&ILSN
|
EA
|
1.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM&ILSN
|
EA
|
1.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
7.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
14.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
2.000
|
|
|
INSTALL BBU SYSTEM
|
EA
|
2.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
8.000
|
|
|
LITTER REMOVAL
|
CYC
|
8.000
|
|
|
INSTALL FTB
|
LF
|
580.000
|
|
|
REMOVE FTB
|
LF
|
580.000
|
|
|
VDS PROSR SYS
|
EA
|
2.000
|
|
|
HVDS W/VAR LNS
|
EA
|
7.000
|
|
|
VDS CNTRL SOFTWARE
|
EA
|
2.000
|
|
|
VDS CABLING
|
LF
|
1,750.000
|