Show Job Controls
Bid Cobra

SHERMAN US 287 (0066-03-041)

Items: 65

County: SHERMAN
Length: N/A
Highway: US 287
District: AMARILLO
Control Number: 0066-03-041
DBE Goal: N/A
Project: NH 2019(458)
Guaranty: N/A
Time: 147 WORKING DAYS
Engineer's Estimate: $14,893,378.03
Date: 02/05/2019 (7 years ago)
Contract Number: N/A
Type: OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$14,893,378.03
1
$14,540,198.82
Over/Under Est: -2.37% -$353,179.21
$17,128,332.03
Over/Under Est: 15.01% $2,234,954.00
Amt Left: 17.8% $2,588,133.21

Bid Items & Bid Tabulations

65 Total 0 of 65
SHERMAN  |  US 287  |  AMARILLO  |  0066-03-041  |  02/05/2019  |  $14,893,378.03  |  NH 2019(458)  |  OVERLAY  |  147 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
J. LEE MILLIGAN, INC.
PREPARING ROW
AC 45.310 $150.000 $121.730 $112.000
REMOVING CONC (CTB)
LF 650.000 $25.000 $24.550 $18.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 1,058.000 $30.000 $22.500 $61.650
BACKFILL (TY A)
STA 1,973.000 $190.000 $156.310 $215.000
BLADING
HR 49.000 $126.000 $139.560 $175.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 3.820 $800.000 $715.500 $710.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 49.130 $500.000 $340.260 $340.000
SALV,HAUL & STKPL RCL APH PV (12"TO18")
SY 11,931.000 $5.250 $7.690 $14.000
SALV, HAUL & STKPL RCL ASH PV (12")
SY 4,470.000 $5.250 $8.480 $14.300
EMULS ASPH (EROSN CONT)(MS-2)
GAL 14,978.000 $3.750 $3.110 $3.800
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
TON 105,941.000 $88.000 $96.910 $103.900
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 55,904.000 $24.000 $18.440 $22.550
PLANE ASPH CONC PAV(0" TO 2")
SY 7,715.000 $2.500 $2.120 $3.800
PLANE ASPH CONC PAV(2" TO 4")
SY 13,911.000 $3.000 $1.590 $3.850
PLANE ASPH CONC PAV (2")
SY 14,583.000 $2.750 $1.860 $3.050
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 152.000 $150.000 $214.120 $213.000
RIPRAP (CONC)(FLUME)
CY 4.250 $700.000 $915.840 $1,195.000
CLEANING EXISTING JOINTS
LF 114.000 $20.000 $5.300 $5.300
MULTI-LAYER POLYMER OVERLAY
SY 802.000 $45.000 $45.050 $44.800
HEADER TYPE EXPANSION JOINT
CF 6.330 $700.000 $530.000 $527.000
JOINT SEALANT
LF 38.000 $50.000 $106.000 $105.000
SHOT BLASTING
SY 802.000 $7.000 $6.890 $6.850
REMOV STR (SET)
EA 28.000 $165.000 $313.590 $560.000
REMOV STR (PIPE)
LF 630.000 $26.000 $16.290 $36.800
MOBILIZATION
LS 1.000 $1,300,000.000 $500,000.000 $1,590,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $17,000.000 $16,972.860 $23,100.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,800.000 $6.000 $2.230 $6.300
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,800.000 $3.000 $0.530 $2.300
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 750.000 $110.000 $97.200 $85.600
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 390,955.000 $0.180 $0.100 $0.080
MTL W-BEAM GD FEN (STEEL POST)
LF 7,725.000 $26.000 $27.030 $26.850
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 7.000 $1,900.000 $2,438.000 $2,425.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $1,300.000 $1,272.000 $1,265.000
REMOVE METAL BEAM GUARD FENCE
LF 8,130.000 $3.000 $4.240 $4.250
REMOVE TERMINAL ANCHOR SECTION
EA 16.000 $275.000 $371.000 $370.000
GUARDRAIL END TREATMENT (INSTALL)
EA 15.000 $2,400.000 $3,180.000 $3,160.000
GUARDRAIL END TREATMENT (REMOVE)
EA 14.000 $300.000 $371.000 $370.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 20.000 $650.000 $742.000 $765.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 243.000 $1,100.000 $826.800 $925.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 114.000 $1,100.000 $742.000 $895.000
REMOVE SM RD SN SUP&AM
EA 449.000 $105.000 $106.000 $105.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 476.000 $21.000 $18.020 $18.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 560.000 $140.000 $127.200 $142.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 360.000 $140.000 $127.200 $142.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 93.000 $30.000 $37.100 $37.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 16.000 $29.000 $37.100 $37.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 16.000 $26.000 $37.100 $37.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 36,562.000 $0.900 $0.810 $1.150
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,248.000 $0.900 $0.810 $1.200
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 73.000 $0.430 $0.350 $0.350
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 838.000 $0.660 $0.700 $0.700
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 61.000 $9.000 $10.600 $10.550
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 2.000 $120.000 $159.000 $158.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 2.000 $200.000 $265.000 $265.000
REFL PAV MRK TY I (W)(RR XING)(090MIL)
EA 3.000 $700.000 $477.000 $475.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 208.000 $17.000 $26.790 $26.650
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 48,780.000 $0.340 $0.350 $0.350
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 214,020.000 $0.340 $0.350 $0.350
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 213.000 $0.340 $0.350 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 206,276.000 $0.340 $0.350 $0.350
REFL PAV MRKR TY II-C-R
EA 2,734.000 $3.000 $3.180 $3.150
UNDERSEAL COURSE
GAL 142,379.000 $3.600 $3.810 $3.150
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $7,427.330 $24,750.000
TMA (STATIONARY)
DAY 294.000 $375.000 $380.980 $785.000
TMA (MOBILE OPERATION)
HR 720.000 $65.000 $71.280 $78.500
Totals: $14,893,378.030 $14,540,198.830 $17,128,332.030