PREPARING ROW
|
AC
|
45.310
|
$150.000
|
$121.730
|
$112.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
650.000
|
$25.000
|
$24.550
|
$18.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
1,058.000
|
$30.000
|
$22.500
|
$61.650
|
|
|
BACKFILL (TY A)
|
STA
|
1,973.000
|
$190.000
|
$156.310
|
$215.000
|
|
|
BLADING
|
HR
|
49.000
|
$126.000
|
$139.560
|
$175.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
3.820
|
$800.000
|
$715.500
|
$710.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
49.130
|
$500.000
|
$340.260
|
$340.000
|
|
|
SALV,HAUL & STKPL RCL APH PV (12"TO18")
|
SY
|
11,931.000
|
$5.250
|
$7.690
|
$14.000
|
|
|
SALV, HAUL & STKPL RCL ASH PV (12")
|
SY
|
4,470.000
|
$5.250
|
$8.480
|
$14.300
|
|
|
EMULS ASPH (EROSN CONT)(MS-2)
|
GAL
|
14,978.000
|
$3.750
|
$3.110
|
$3.800
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
|
TON
|
105,941.000
|
$88.000
|
$96.910
|
$103.900
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
55,904.000
|
$24.000
|
$18.440
|
$22.550
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
7,715.000
|
$2.500
|
$2.120
|
$3.800
|
|
|
PLANE ASPH CONC PAV(2" TO 4")
|
SY
|
13,911.000
|
$3.000
|
$1.590
|
$3.850
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
14,583.000
|
$2.750
|
$1.860
|
$3.050
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
152.000
|
$150.000
|
$214.120
|
$213.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
4.250
|
$700.000
|
$915.840
|
$1,195.000
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
114.000
|
$20.000
|
$5.300
|
$5.300
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
802.000
|
$45.000
|
$45.050
|
$44.800
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
6.330
|
$700.000
|
$530.000
|
$527.000
|
|
|
JOINT SEALANT
|
LF
|
38.000
|
$50.000
|
$106.000
|
$105.000
|
|
|
SHOT BLASTING
|
SY
|
802.000
|
$7.000
|
$6.890
|
$6.850
|
|
|
REMOV STR (SET)
|
EA
|
28.000
|
$165.000
|
$313.590
|
$560.000
|
|
|
REMOV STR (PIPE)
|
LF
|
630.000
|
$26.000
|
$16.290
|
$36.800
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,300,000.000
|
$500,000.000
|
$1,590,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$17,000.000
|
$16,972.860
|
$23,100.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,800.000
|
$6.000
|
$2.230
|
$6.300
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,800.000
|
$3.000
|
$0.530
|
$2.300
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
750.000
|
$110.000
|
$97.200
|
$85.600
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
390,955.000
|
$0.180
|
$0.100
|
$0.080
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
7,725.000
|
$26.000
|
$27.030
|
$26.850
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
7.000
|
$1,900.000
|
$2,438.000
|
$2,425.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
12.000
|
$1,300.000
|
$1,272.000
|
$1,265.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
8,130.000
|
$3.000
|
$4.240
|
$4.250
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
16.000
|
$275.000
|
$371.000
|
$370.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
15.000
|
$2,400.000
|
$3,180.000
|
$3,160.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
14.000
|
$300.000
|
$371.000
|
$370.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
20.000
|
$650.000
|
$742.000
|
$765.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
243.000
|
$1,100.000
|
$826.800
|
$925.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
114.000
|
$1,100.000
|
$742.000
|
$895.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
449.000
|
$105.000
|
$106.000
|
$105.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
476.000
|
$21.000
|
$18.020
|
$18.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
|
EA
|
560.000
|
$140.000
|
$127.200
|
$142.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
360.000
|
$140.000
|
$127.200
|
$142.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
93.000
|
$30.000
|
$37.100
|
$37.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
16.000
|
$29.000
|
$37.100
|
$37.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
|
EA
|
16.000
|
$26.000
|
$37.100
|
$37.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
36,562.000
|
$0.900
|
$0.810
|
$1.150
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,248.000
|
$0.900
|
$0.810
|
$1.200
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
73.000
|
$0.430
|
$0.350
|
$0.350
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
838.000
|
$0.660
|
$0.700
|
$0.700
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
61.000
|
$9.000
|
$10.600
|
$10.550
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
2.000
|
$120.000
|
$159.000
|
$158.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
2.000
|
$200.000
|
$265.000
|
$265.000
|
|
REFL PAV MRK TY I (W)(RR XING)(090MIL)
|
EA
|
3.000
|
$700.000
|
$477.000
|
$475.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
208.000
|
$17.000
|
$26.790
|
$26.650
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
48,780.000
|
$0.340
|
$0.350
|
$0.350
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
214,020.000
|
$0.340
|
$0.350
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
213.000
|
$0.340
|
$0.350
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
206,276.000
|
$0.340
|
$0.350
|
$0.350
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,734.000
|
$3.000
|
$3.180
|
$3.150
|
|
|
UNDERSEAL COURSE
|
GAL
|
142,379.000
|
$3.600
|
$3.810
|
$3.150
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$7,427.330
|
$24,750.000
|
|
|
TMA (STATIONARY)
|
DAY
|
294.000
|
$375.000
|
$380.980
|
$785.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
720.000
|
$65.000
|
$71.280
|
$78.500
|
|
Totals: |
$14,893,378.030
|
$14,540,198.830
|