Show Job Controls
Bid Cobra

SHACKELFORD US 180 (0011-06-049)

Items: 90

County: SHACKELFORD
Length: N/A
Highway: US 180
District: ABILENE
Control Number: 0011-06-049
DBE Goal: N/A
Project: STP 2020(172)
Guaranty: N/A
Time: 479 WORKING DAYS
Engineer's Estimate: $8,813,158.10
Date: 01/09/2020 (6 years ago)
Contract Number: N/A
Type: MILLING, SPOT REPAIR, 2"OVERLAY, STRUCTURE WORK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$8,813,158.10
$8,259,120.38
Over/Under Est: -6.29% -$554,037.72
$8,381,120.62
Over/Under Est: -4.9% -$432,037.48
Amt Left: 1.48% $122,000.24
Over/Under Est: 1.17% $103,012.84
Amt Left: 7.96% $657,050.56
Delta: -6.38% -$535,050.32
$9,740,676.24
Over/Under Est: 10.52% $927,518.14
Amt Left: 17.94% $1,481,555.86
Delta: -9.25% -$824,505.30

Bid Items & Bid Tabulations

90 Total 0 of 90
SHACKELFORD  |  US 180  |  ABILENE  |  0011-06-049  |  01/09/2020  |  $8,813,158.10  |  STP 2020(172)  |  MILLING, SPOT REPAIR, 2"OVERLAY, STR...  |  479 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. H. STRAIN & SONS, INC.
A. L. HELMCAMP, INC.
ALLEN BUTLER CONSTRUCTION, INC.
DUININCK, INC.
PREPARING ROW
STA 30.000 $3,000.000 $1,500.000 $6,000.000 $5,513.440 $3,500.000
REMOVING CONC (RIPRAP)
SY 1,395.000 $15.000 $25.000 $16.000 $7.520 $16.500
REMOVING STAB BASE AND ASPH PAV (10")
SY 10,243.000 $5.000 $12.500 $7.000 $18.000 $11.500
BACKFILL (TY A)
STA 602.240 $220.000 $125.000 $250.000 $114.910 $240.000
BLADING
HR 150.000 $150.000 $95.000 $125.000 $290.780 $215.000
EMULS ASPH (EROSN CONT)(MS-2)
GAL 15,608.000 $4.000 $4.750 $3.500 $4.110 $3.900
ASPH (MULTI OPTION)
GAL 126,433.000 $3.400 $4.100 $3.300 $3.250 $3.150
AGGR(TY-B GR-4 SAC-B)
CY 2,151.000 $92.000 $70.000 $97.000 $91.830 $89.500
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
TON 32,624.000 $100.000 $103.780 $97.000 $111.200 $110.000
TACK COAT
GAL 1,011.000 $4.000 $5.000 $6.000 $3.420 $2.800
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 8,000.000 $35.000 $30.000 $40.000 $35.720 $39.000
PLANE ASPH CONC PAV (2")
SY 28,903.000 $1.200 $2.000 $1.600 $1.110 $1.600
PLANE ASPH CONC PAV (3/4")
SY 252,764.000 $0.800 $0.900 $1.100 $0.570 $0.790
PLANE ASPH CONC PAV (3/4"-2")
SY 7,927.000 $3.000 $2.000 $1.600 $1.530 $1.700
RIPRAP (CONC)(5 IN)
CY 209.000 $500.000 $625.000 $525.000 $382.150 $560.000
RAIL (TY T631)
LF 159.000 $120.000 $96.250 $92.000 $100.440 $97.500
RETROFIT RAIL (TY T131RC)
LF 119.000 $150.000 $220.000 $380.000 $291.440 $225.000
CONC BOX CULV (3 FT X 2 FT)
LF 46.000 $260.000 $480.000 $525.000 $643.370 $430.000
CONC BOX CULV (3 FT X 3 FT)
LF 39.000 $230.000 $465.000 $550.000 $716.850 $415.000
CONC BOX CULV (4 FT X 2 FT)
LF 8.000 $450.000 $575.000 $630.000 $726.530 $515.000
CONC BOX CULV (4 FT X 3 FT)
LF 10.000 $500.000 $650.000 $630.000 $716.590 $580.000
CONC BOX CULV (4 FT X 4 FT)
LF 63.000 $420.000 $640.000 $660.000 $778.780 $570.000
CONC BOX CULV (5 FT X 5 FT)
LF 33.000 $675.000 $900.000 $710.000 $875.660 $805.000
CONC BOX CULV (6 FT X 3 FT)
LF 4.000 $1,000.000 $880.000 $740.000 $907.770 $725.000
CONC BOX CULV (6 FT X 4 FT)
LF 9.000 $1,200.000 $900.000 $760.000 $880.210 $805.000
CONC BOX CULV (6 FT X 6 FT)
LF 10.000 $1,500.000 $1,075.000 $900.000 $1,111.010 $950.000
CONC BOX CULV (10 FT X 5 FT)
LF 51.000 $600.000 $1,150.000 $950.000 $1,595.320 $1,100.000
CONC BOX CULV (10 FT X 6 FT)
LF 8.000 $980.000 $1,375.000 $1,200.000 $1,741.250 $1,200.000
RC PIPE (CL III)(24 IN)
LF 32.000 $180.000 $110.000 $130.000 $134.090 $98.500
RC PIPE (ARCH)(CL III)(DES 1)
LF 338.000 $160.000 $225.000 $200.000 $173.140 $210.000
RC PIPE (ARCH)(CL III)(DES 3)
LF 758.000 $175.000 $225.000 $230.000 $186.010 $225.000
SET (TY I)(S=10 FT)(HW=6FT)(3:1)(C)
EA 6.000 $10,000.000 $9,300.000 $11,000.000 $12,530.250 $8,400.000
SET (TY I)(S=10 FT)(HW=7FT)(4:1)(C)
EA 4.000 $18,000.000 $23,000.000 $21,000.000 $16,411.330 $22,500.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 18.000 $6,000.000 $10,000.000 $6,000.000 $7,547.210 $9,500.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 16.000 $6,000.000 $6,800.000 $6,200.000 $8,356.520 $6,400.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 4.000 $6,500.000 $10,000.000 $6,200.000 $7,945.380 $8,900.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $6,800.000 $13,750.000 $7,400.000 $10,737.330 $12,000.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
EA 4.000 $7,000.000 $8,125.000 $7,400.000 $9,265.400 $7,300.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 10.000 $7,000.000 $7,375.000 $7,900.000 $9,222.880 $8,400.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
EA 12.000 $6,500.000 $15,625.000 $9,000.000 $11,069.600 $14,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $7,000.000 $16,600.000 $10,000.000 $9,605.780 $15,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $13,000.000 $20,000.000 $10,000.000 $11,739.520 $18,000.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
EA 4.000 $11,000.000 $24,500.000 $11,000.000 $14,542.300 $23,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $2,500.000 $1,500.000 $1,300.000 $1,665.760 $1,300.000
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 22.000 $2,500.000 $1,600.000 $1,300.000 $1,569.190 $1,400.000
SET (TY II) (DES 3) (RCP) (6: 1) (P)
EA 50.000 $2,500.000 $2,800.000 $2,400.000 $1,913.560 $2,500.000
REMOV STR (SET)
EA 8.000 $330.000 $625.000 $750.000 $895.370 $560.000
REMOV STR (WINGWALL)
EA 56.000 $1,200.000 $625.000 $550.000 $929.810 $560.000
REMOV STR (PIPE)
EA 37.000 $350.000 $310.000 $270.000 $533.780 $280.000
REMOVE STR (RAIL)
LF 249.000 $18.000 $12.500 $16.000 $17.720 $28.000
MOBILIZATION
LS 1.000 $775,000.000 $200,000.000 $820,000.000 $776,259.670 $950,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 27.000 $10,000.000 $4,500.000 $3,700.000 $3,443.730 $22,500.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 1,397.000 $35.000 $48.000 $34.000 $33.290 $32.500
ROCK FILTER DAMS (REMOVE)
LF 1,397.000 $10.000 $5.000 $10.000 $13.490 $13.000
SANDBAGS FOR EROSION CONTROL (6")
LF 420.000 $20.000 $10.000 $13.000 $12.630 $12.500
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 450.000 $90.000 $110.000 $110.000 $98.740 $130.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 450.000 $50.000 $22.000 $25.000 $20.460 $42.500
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 10,243.000 $70.000 $35.000 $43.000 $30.990 $34.000
RUMBLE STRIPS (SHOULDER)
LF 120,448.000 $0.150 $0.180 $0.130 $0.230 $0.130
RUMBLE STRIPS (CENTERLINE)
LF 60,224.000 $0.150 $0.155 $0.130 $0.300 $0.160
MTL W-BEAM GD FEN (TIM POST)
LF 1,487.500 $21.000 $24.500 $23.000 $25.250 $24.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $3,000.000 $2,175.000 $2,100.000 $2,267.120 $2,200.000
REMOVE METAL BEAM GUARD FENCE
LF 975.000 $3.000 $3.300 $3.500 $3.440 $3.350
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $1,000.000 $330.000 $320.000 $344.370 $335.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,600.000 $3,300.000 $3,200.000 $3,443.730 $3,400.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $330.000 $330.000 $320.000 $344.380 $335.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $11,500.000 $10,500.000 $11,000.000 $10,905.140 $10,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,550.000 $1,650.000 $1,000.000 $1,721.870 $1,700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $1,200.000 $825.000 $450.000 $780.580 $840.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 44.000 $800.000 $880.000 $540.000 $983.760 $895.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 5.000 $2,000.000 $1,075.000 $750.000 $1,159.390 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $2,500.000 $1,265.000 $850.000 $1,406.190 $1,300.000
REMOVE SM RD SN SUP&AM
EA 53.000 $80.000 $100.000 $85.000 $86.100 $110.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 62.000 $70.000 $82.000 $90.000 $89.540 $84.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 51.000 $35.000 $41.250 $37.000 $43.050 $42.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 29,150.000 $0.200 $0.270 $0.180 $0.290 $0.190
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 55,780.000 $0.300 $0.270 $0.240 $0.290 $0.260
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 160,180.000 $0.300 $0.270 $0.180 $0.290 $0.190
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 1,232.000 $3.500 $3.850 $4.300 $4.020 $4.450
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 18,810.000 $0.750 $1.750 $0.600 $1.030 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 121,328.000 $0.500 $0.500 $0.420 $0.520 $0.450
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 55,780.000 $0.500 $0.500 $0.480 $0.520 $0.510
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 41,490.000 $0.500 $0.500 $0.420 $0.520 $0.450
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 12.000 $1,000.000 $27.000 $33.000 $28.700 $34.500
REFL PAV MRKR TY II-A-A
EA 1,533.000 $2.500 $3.250 $3.600 $3.440 $3.850
ELIM EXT PAV MRK & MRKS (4")
LF 36,600.000 $0.800 $0.710 $0.420 $0.750 $0.450
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $12,500.000 $15,000.000 $13,774.910 $14,000.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $9,000.000 $8,000.000 $10,000.000 $13,640.870 $8,400.000
TMA (STATIONARY)
DAY 870.000 $250.000 $150.000 $20.000 $172.110 $270.000
TMA (MOBILE OPERATION)
DAY 40.000 $250.000 $150.000 $20.000 $725.510 $1,000.000
Totals: $8,813,158.100 $8,259,120.380 $8,381,120.620 $8,916,170.953 $9,740,676.240