SAN SABA RM 501 (0867-07-013)

Items: 121

County: SAN SABA
Length: N/A
Highway: RM 501
District: BROWNWOOD
Control Number: 0867-07-013
DBE Goal: N/A
Project: STP 2019(478)HES
Guaranty: N/A
Time: 367 WORKING DAYS
Engineer's Estimate: $2,432,790.25
Date: 02/06/2019 (7 years ago)
Contract Number: N/A
Type: UPGRADE GUARDRAIL
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$2,432,790.25
Over/Under Est: 59.35% $1,443,836.20

Bid Items & Bid Tabulations

121 Total 0 of 121
SAN SABA  |  RM 501  |  BROWNWOOD  |  0867-07-013  |  02/06/2019  |  $2,432,790.25  |  STP 2019(478)HES  |  UPGRADE GUARDRAIL  |  367 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
PREPARING ROW
STA 66.000 $1,500.000 $1,000.000
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 4.000 $500.000 $2,500.000
EXCAVATION (ROADWAY)
CY 1,253.000 $20.000 $12.000
EXCAVATION (CHANNEL)
CY 82.000 $30.000 $200.000
EXCAVATION (SPECIAL)
CY 1,551.000 $50.000 $70.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 6,366.600 $20.000 $27.000
BLADING
STA 8.500 $300.000 $500.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 32,090.000 $0.300 $0.550
BROADCAST SEED (TEMP) (WARM)
SY 16,045.000 $0.300 $0.550
BROADCAST SEED (TEMP) (COOL)
SY 16,045.000 $0.300 $0.550
VEGETATIVE WATERING
MG 772.000 $20.000 $15.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 1,508.000 $40.000 $125.000
PRIME COAT (RC-250)
GAL 959.000 $5.000 $5.000
ASPH (AC-10)
GAL 1,144.000 $5.000 $5.000
ASPH (AC-20-5TR)
GAL 6,079.000 $5.000 $4.000
ASPH (CRS-2P)
GAL 1,144.000 $6.000 $6.000
ASPH (RC-250)
GAL 550.000 $5.000 $9.000
AGGR(TY-B GR-5 SAC-B)
CY 55.000 $130.000 $400.000
AGGR(TY-PB GR-3 SAC-B)
CY 213.000 $200.000 $215.000
HMCL ACP TY-B SAC-B AC-1.5
TON 20.000 $350.000 $315.000
HMCL ACP TY-F SAC-B AC-1.5
TON 6.000 $350.000 $400.000
FLOWABLE BACKFILL
CY 74.800 $300.000 $250.000
CL C CONC (CULV)
CY 120.600 $1,100.000 $2,500.000
CL C CONC (RAC-R)
CY 10.800 $1,400.000 $3,000.000
RIPRAP (CONC)(5 IN)
CY 117.900 $460.000 $600.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 23.500 $520.000 $650.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 14.000 $215.000 $300.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 5.100 $220.000 $400.000
RAIL (TY T223)
LF 50.200 $150.000 $300.000
RAIL (TY T631)
LF 100.000 $75.000 $300.000
RETROFIT RAIL (TY T131RC)
LF 778.000 $150.000 $300.000
RETROFIT RAIL (TY T631)
LF 248.330 $75.000 $300.000
CMP (GAL STL 24 IN)
LF 4.000 $90.000 $250.000
CMP (GAL STL 36 IN)
LF 31.500 $90.000 $300.000
CMP AR (GAL STL DES 3)
LF 2.000 $140.000 $350.000
CMP AR (GAL STL DES 7)
LF 33.000 $140.000 $400.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 5.600 $475.000 $850.000
RC PIPE (CL III)(24 IN)
LF 97.000 $75.000 $270.000
RC PIPE (CL III)(30 IN)
LF 40.000 $90.000 $275.000
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 1.000 $4,000.000 $7,000.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 1.000 $5,655.000 $9,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 10.000 $5,095.000 $9,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $5,600.000 $12,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
EA 4.000 $5,000.000 $7,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 3.000 $5,555.000 $10,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $5,951.000 $10,000.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 6.000 $6,000.000 $8,000.000
SET (TY I)(S= 5 FT)(HW= 7 FT)(3:1) (C)
EA 8.000 $11,000.000 $12,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $6,075.000 $11,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 2.000 $8,000.000 $12,000.000
SET (TY I)(S= 7 FT)(HW= 5 FT)(3:1) (C)
EA 2.000 $9,040.000 $14,000.000
SET (TY I)(S= 8 FT)(HW= 5 FT)(3:1) (C)
EA 4.000 $9,500.000 $8,500.000
SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1) (C)
EA 1.000 $9,500.000 $14,000.000
SET (TY I)(S= 8 FT)(HW= 6 FT)(4:1) (C)
EA 1.000 $10,000.000 $20,000.000
SET (TY II) (24 IN) (CMP) (3: 1) (C)
EA 5.000 $1,500.000 $1,000.000
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 4.000 $1,580.000 $1,200.000
SET (TY II) (24 IN) (CMP) (6: 1) (C)
EA 1.000 $1,680.000 $1,300.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 11.000 $830.000 $1,050.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 7.000 $1,100.000 $1,200.000
SET (TY II) (30 IN) (CMP) (3: 1) (C)
EA 1.000 $2,100.000 $2,700.000
SET (TY II) (30 IN) (CMP) (4: 1) (C)
EA 2.000 $2,100.000 $3,200.000
SET (TY II) (30 IN) (CMP) (6: 1) (C)
EA 1.000 $2,375.000 $3,600.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 6.000 $1,430.000 $3,200.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 6.000 $1,800.000 $3,700.000
SET (TY II) (36 IN) (CMP) (3: 1) (C)
EA 8.000 $2,000.000 $4,200.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $2,800.000 $4,700.000
SET (TY II) (DES 2) (CMP) (6: 1) (P)
EA 2.000 $1,600.000 $1,200.000
SET (TY II) (DES 3) (CMP) (3: 1) (C)
EA 8.000 $1,625.000 $1,400.000
SET (TY II) (DES 3) (CMP) (4: 1) (C)
EA 8.000 $1,680.000 $1,500.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 4.000 $1,740.000 $1,700.000
SET (TY II) (DES 4) (CMP) (3: 1) (C)
EA 2.000 $2,030.000 $3,700.000
SET (TY II) (DES 4) (CMP) (4: 1) (C)
EA 2.000 $2,846.000 $4,000.000
SET (TY II) (DES 5) (CMP) (3: 1) (C)
EA 7.000 $3,200.000 $4,000.000
SET (TY II) (DES 5) (CMP) (4: 1) (C)
EA 1.000 $3,600.000 $4,500.000
SET (TY II) (DES 5) (CMP) (6: 1) (P)
EA 2.000 $4,000.000 $5,000.000
SET (TY II) (DES 7) (CMP) (3: 1) (C)
EA 2.000 $5,200.000 $6,500.000
REMOV STR (PIPE)
EA 4.000 $1,500.000 $1,500.000
MOBILIZATION
LS 1.000 $230,000.000 $364,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $4,500.000 $17,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 120.000 $32.000 $30.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 15.000 $40.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 120.000 $12.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,075.000 $3.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,075.000 $1.000 $0.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,200.000 $6.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,200.000 $1.000 $1.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 3.000 $4,500.000 $6,000.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 180.000 $76.000 $80.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 180.000 $17.000 $7.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 180.000 $25.000 $18.000
MTL W-BEAM GD FEN (STEEL POST)
LF 7,506.250 $20.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 23.000 $1,650.000 $2,400.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,000.000 $1,200.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 400.000 $25.000 $26.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 150.000 $60.000 $60.000
REMOVE METAL BEAM GUARD FENCE
LF 4,125.000 $3.000 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 94.000 $2,200.000 $2,800.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,840.000 $2,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $825.000 $750.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $9,000.000 $11,500.000
WIRE FENCE (TY C)
LF 50.000 $28.000 $30.000
WIRE FENCE (TY D)
LF 190.000 $15.000 $30.000
WIRE FENCE (WATER GAP)
LF 20.000 $65.000 $75.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $780.000 $500.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 9.000 $400.000 $300.000
REMOVE SM RD SN SUP&AM
EA 10.000 $115.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 6.000 $22.000 $15.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 20.000 $82.000 $55.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 256.000 $27.000 $15.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 100.000 $32.000 $65.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 9,115.000 $0.400 $1.500
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 60.000 $7.000 $22.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 450.000 $1.200 $0.700
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 874.000 $1.500 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 10,600.000 $0.500 $0.600
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 315.000 $0.650 $0.650
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 15,575.000 $0.450 $0.600
REFL PAV MRKR TY II-A-A
EA 214.000 $5.000 $17.000
ELIM EXT PAV MRK & MRKS (4")
LF 3,180.000 $1.200 $2.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 480.000 $15.000 $14.000
TMA (STATIONARY)
DAY 112.000 $245.000 $250.000
Totals: $2,432,790.250 $3,876,626.450