|
|
REMOVING CONC (RIPRAP)
|
SY
|
242.000
|
$9.000
|
$13.500
|
$25.000
|
$6.900
|
$34.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
160.500
|
$300.000
|
$38.000
|
$120.000
|
$42.000
|
$74.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
1,820.000
|
$5.000
|
$5.500
|
$8.000
|
$3.600
|
$3.650
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
402.000
|
$7.000
|
$10.500
|
$7.000
|
$13.500
|
$8.250
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
2,987.000
|
$12.000
|
$16.000
|
$9.990
|
$2.300
|
$5.100
|
|
|
BACKFILL (TY A OR B)
|
STA
|
712.000
|
$150.000
|
$85.000
|
$72.750
|
$45.000
|
$119.000
|
|
|
BACKFILL (TY A OR B)
|
CY
|
98.000
|
$25.000
|
$80.000
|
$72.750
|
$30.000
|
$144.000
|
|
|
PROOF ROLLING
|
HR
|
98.000
|
$100.000
|
$80.000
|
$57.000
|
$59.000
|
$69.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
128,064.000
|
$2.500
|
$2.500
|
$2.400
|
$2.300
|
$2.450
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
2,984.000
|
$80.000
|
$78.000
|
$76.120
|
$94.000
|
$112.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
|
TON
|
36,120.000
|
$75.000
|
$71.000
|
$67.050
|
$74.000
|
$79.150
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
5,856.000
|
$30.000
|
$19.500
|
$21.480
|
$32.000
|
$27.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
328,368.000
|
$1.250
|
$0.950
|
$1.060
|
$0.800
|
$1.450
|
|
|
FLOWABLE BACKFILL
|
CY
|
7.500
|
$175.000
|
$205.000
|
$150.000
|
$570.000
|
$232.000
|
|
|
CL C CONC (VEH DEFL WALL)
|
CY
|
381.500
|
$1,350.000
|
$775.000
|
$900.000
|
$1,000.000
|
$1,640.000
|
|
|
CL C CONC (COLUMN ENCASEMENT)
|
CY
|
7.000
|
$2,500.000
|
$3,000.000
|
$1,800.000
|
$1,900.000
|
$1,750.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
10.000
|
$195.000
|
$300.000
|
$800.000
|
$800.000
|
$794.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
269.000
|
$400.000
|
$480.000
|
$700.000
|
$500.000
|
$592.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
26.000
|
$400.000
|
$540.000
|
$500.000
|
$530.000
|
$597.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
202.000
|
$400.000
|
$480.000
|
$600.000
|
$430.000
|
$579.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
612.000
|
$30.000
|
$29.000
|
$28.000
|
$34.000
|
$30.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
54.000
|
$100.000
|
$100.000
|
$100.000
|
$110.000
|
$121.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,300.000
|
$2,750.000
|
$3,000.000
|
$2,300.000
|
$2,790.000
|
|
|
GRATE
|
EA
|
54.000
|
$1,000.000
|
$1,350.000
|
$1,600.000
|
$1,300.000
|
$1,200.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
25.000
|
$1,500.000
|
$1,600.000
|
$1,500.000
|
$5,200.000
|
$5,230.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$330,200.000
|
$500,000.000
|
$510,236.140
|
$389,600.000
|
$301,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$3,500.000
|
$7,500.000
|
$2,724.670
|
$6,000.000
|
$3,200.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,192.000
|
$6.000
|
$6.500
|
$6.200
|
$4.600
|
$4.250
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
750.000
|
$6.000
|
$8.000
|
$7.750
|
$5.300
|
$5.100
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,942.000
|
$1.500
|
$1.000
|
$1.000
|
$0.800
|
$2.350
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
600.000
|
$15.000
|
$21.000
|
$42.000
|
$13.000
|
$29.000
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
375.000
|
$45.000
|
$34.000
|
$26.280
|
$37.000
|
$44.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
141,724.000
|
$0.200
|
$0.200
|
$0.230
|
$0.140
|
$0.150
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,425.000
|
$20.000
|
$23.000
|
$22.390
|
$23.000
|
$23.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$1,500.000
|
$1,350.000
|
$1,428.030
|
$1,600.000
|
$1,490.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$800.000
|
$1,150.000
|
$1,157.230
|
$1,000.000
|
$1,210.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
1.000
|
$500.000
|
$1,050.000
|
$1,054.800
|
$960.000
|
$1,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,895.000
|
$2.000
|
$1.350
|
$1.270
|
$2.200
|
$1.300
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$150.000
|
$205.000
|
$202.850
|
$180.000
|
$212.000
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
440.000
|
$8.000
|
$19.250
|
$19.380
|
$12.750
|
$20.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
4.000
|
$2,145.000
|
$2,900.000
|
$2,903.230
|
$3,000.000
|
$3,030.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
518.000
|
$7.000
|
$5.000
|
$5.000
|
$5.200
|
$11.000
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
2.000
|
$700.000
|
$500.000
|
$500.000
|
$600.000
|
$1,060.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$2,000.000
|
$2,450.000
|
$2,433.130
|
$2,600.000
|
$2,540.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$200.000
|
$105.000
|
$101.420
|
$330.000
|
$106.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
34.000
|
$16,000.000
|
$22,500.000
|
$24,620.370
|
$26,300.000
|
$27,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$1,100.000
|
$1,000.000
|
$1,141.010
|
$1,300.000
|
$1,190.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
130.000
|
$25.000
|
$20.000
|
$19.500
|
$21.000
|
$21.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
945.000
|
$25.000
|
$22.500
|
$22.000
|
$23.000
|
$23.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
354.000
|
$30.000
|
$28.500
|
$28.000
|
$30.000
|
$30.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
52.000
|
$475.000
|
$485.000
|
$475.000
|
$410.000
|
$503.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
27.000
|
$500.000
|
$585.000
|
$575.000
|
$510.000
|
$609.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$740.000
|
$710.000
|
$700.000
|
$560.000
|
$741.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
8.000
|
$1,300.000
|
$910.000
|
$900.000
|
$780.000
|
$953.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
87.000
|
$60.000
|
$61.000
|
$60.000
|
$48.000
|
$64.000
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$700.000
|
$1,250.000
|
$1,200.000
|
$1,300.000
|
$1,270.000
|
|
|
REMOVE LRSA (FOUNDATION ONLY)(12 IN)
|
EA
|
2.000
|
$50.000
|
$475.000
|
$450.000
|
$770.000
|
$476.000
|
|
|
REMOVE SIGN WALKWAY
|
EA
|
1.000
|
$1,000.000
|
$6,100.000
|
$6,000.000
|
$6,300.000
|
$6,350.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
23.000
|
$60.000
|
$71.000
|
$70.000
|
$46.000
|
$74.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF
|
EA
|
11.000
|
$45.000
|
$96.000
|
$95.000
|
$63.000
|
$101.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
20.000
|
$15.000
|
$16.000
|
$15.000
|
$21.000
|
$16.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
8.000
|
$60.000
|
$71.000
|
$70.000
|
$46.000
|
$74.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)SRF
|
EA
|
4.000
|
$75.000
|
$96.000
|
$95.000
|
$63.000
|
$101.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
21.000
|
$15.000
|
$16.000
|
$15.000
|
$21.000
|
$16.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
46.000
|
$60.000
|
$71.000
|
$70.000
|
$46.000
|
$74.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
57.000
|
$60.000
|
$71.000
|
$70.000
|
$49.000
|
$74.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
101.000
|
$20.000
|
$18.500
|
$18.000
|
$25.000
|
$19.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
|
EA
|
36.000
|
$20.000
|
$18.500
|
$18.000
|
$25.000
|
$19.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
19,181.000
|
$0.250
|
$0.150
|
$0.150
|
$0.160
|
$0.150
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
75,214.000
|
$0.200
|
$0.150
|
$0.150
|
$0.160
|
$0.150
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
6,112.000
|
$0.500
|
$0.300
|
$0.300
|
$0.320
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
75,246.000
|
$0.250
|
$0.150
|
$0.150
|
$0.160
|
$0.150
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
1,246.000
|
$4.000
|
$3.750
|
$3.750
|
$4.000
|
$3.950
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
12,505.000
|
$1.000
|
$0.650
|
$1.500
|
$1.750
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
6,224.000
|
$0.500
|
$0.700
|
$0.700
|
$0.750
|
$0.750
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
19,181.000
|
$0.250
|
$0.320
|
$0.320
|
$0.340
|
$0.350
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
76,269.000
|
$0.250
|
$0.320
|
$0.320
|
$0.340
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
76,754.000
|
$0.250
|
$0.320
|
$0.320
|
$0.340
|
$0.350
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
1,395.000
|
$6.000
|
$6.000
|
$6.000
|
$6.300
|
$6.350
|
|
PREFAB PAV MRK TY C (W) (NUMBER)
|
EA
|
3.000
|
$150.000
|
$85.000
|
$85.000
|
$90.000
|
$90.000
|
|
PRE PM TY C(ACC PRK)(BL&WH)(W/BORDR)LG
|
EA
|
3.000
|
$1,000.000
|
$200.000
|
$200.000
|
$210.000
|
$212.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
102.000
|
$2.500
|
$4.000
|
$4.000
|
$4.200
|
$4.250
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
330.000
|
$2.500
|
$4.000
|
$4.000
|
$4.200
|
$4.250
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
2.300
|
$5,000.000
|
$17,500.000
|
$7,875.000
|
$15,800.000
|
$15,900.000
|
|
|
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
|
EA
|
3.000
|
$5,400.000
|
$3,500.000
|
$7,302.440
|
$7,000.000
|
$7,620.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
194.000
|
$70.000
|
$60.000
|
$64.150
|
$67.000
|
$65.000
|
|
Totals: |
$6,293,986.850
|
$6,225,552.230
|
$6,289,024.150
|
$6,484,111.670
|
$7,236,418.000
|