SAN AUGUSTINE FM 1751 (1680-03-032)

Items: 97

County: SAN AUGUSTINE
Length: N/A
Highway: FM 1751
District: LUFKIN
Control Number: 1680-03-032
DBE Goal: 500.0%
Project: STP 2B24(279)HRR
Guaranty: N/A
Time: 262 WORKING DAYS
Engineer's Estimate: $9,242,282.70
Date: 07/10/2024 (1 year ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$9,242,282.70
$11,134,224.99
Over/Under Est: 20.47% $1,891,942.29
$11,850,270.00
Over/Under Est: 28.22% $2,607,987.30
Amt Left: 6.43% $716,045.01
Subcontractor Percentage Amount
TEXAS MATERIALS GROUP, INC. 31.66% $3,607,827.36
A R BROTHERS CONSTRUCTION SERVICES, INC. 8.05% $917,340.82
J. H. ODEN CONTRACTING COMPANY 3.77% $429,611.79
COLD CREEK CONSTRUCTION, LTD 2.92% $332,749.71
INTERSTATE BARRICADES & MARKINGS, INC. 0.94% $107,118.06
TEXOP CONSTRUCTION 0.91% $103,699.40
A. L. HELMCAMP, INC. 0.88% $100,280.74
DUSTROL, INC. 0.61% $69,512.78
THIRD COAST SERVICES LLC 0.56% $63,815.01
PANOLA SIGN & BARRICADE, INC. 0.34% $38,744.83
SOUTHWEST ENVIRONMENT SERVICES LLC 0.30% $34,186.61
WEST TEXAS ROCK RESOURCES, LLC 0.08% $9,116.43
Total: 51.02% $5,814,003.54

Bid Items & Bid Tabulations

97 Total 0 of 97
SAN AUGUSTINE  |  FM 1751  |  LUFKIN  |  1680-03-032  |  07/10/2024  |  $9,242,282.70  |  STP 2B24(279)HRR  |  HAZARD ELIM & SAFETY  |  262 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PINTO CONSTRUCTION CO., INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 267.000 $1,500.000 $1,948.350 $3,370.000
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 362.000 $15.000 $93.500 $30.000
SUBGRADE WIDENING (ORD COMP)
STA 267.000 $480.000 $876.170 $850.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 15,663.000 $30.000 $25.000 $50.000
BLADING
STA 267.000 $300.000 $550.000 $450.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 73.000 $120.000 $110.000 $150.000
BLOCK SODDING
SY 5,673.000 $6.500 $6.600 $10.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 218,314.000 $0.750 $0.650 $0.500
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 109,157.000 $0.750 $0.600 $0.500
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 109,157.000 $0.750 $0.600 $0.500
VEGETATIVE WATERING
MG 8,848.200 $15.000 $0.010 $50.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 20.000 $3.000 $35.000 $100.000
CEM TRT (PLNT MX)(CL N)(TY A)(GR3)(12")
SY 20,728.000 $75.000 $102.620 $73.000
EMULS ASPH (EROSN CONT)(SS-1)
GAL 3,541.000 $8.000 $15.000 $10.000
ASPH (RC-250)
TON 20.000 $1,375.000 $2,600.000 $2,500.000
AGGR (TY-PE, E, L OR PL GR 3)
CY 198.000 $350.000 $282.270 $500.000
AGGR (TY E OR L, PE OR PL GR 4)
CY 572.000 $200.000 $223.330 $500.000
AGGR (TY E OR L GR 5)
CY 123.000 $190.000 $356.620 $500.000
ASPH (AC-15P OR CRS-2P)
TON 187.000 $1,000.000 $1,300.000 $1,500.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 800.000 $180.000 $288.710 $180.000
PLANE ASPH CONC PAV(0" TO 3")
SY 578.000 $10.000 $64.650 $20.000
CEM STABIL BKFL
CY 7.000 $450.000 $467.500 $350.000
TEMPORARY SPL SHORING
SF 798.000 $60.000 $69.300 $55.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 8.000 $360.000 $521.400 $450.000
CL C CONC (COLLAR)
EA 10.000 $2,300.000 $1,100.000 $1,500.000
RIPRAP (STONE COMMON)(DRY)(24 IN)
CY 137.000 $300.000 $346.500 $300.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 6.000 $1,200.000 $1,650.000 $1,350.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 6.000 $1,340.000 $1,870.000 $1,500.000
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
LF 5.000 $1,320.000 $1,980.000 $2,000.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 12.000 $1,700.000 $2,090.000 $2,500.000
RC PIPE (CL III)(18 IN)
LF 1,352.000 $75.000 $78.100 $95.000
RC PIPE (CL III)(24 IN)
LF 168.000 $120.000 $110.000 $150.000
RC PIPE (CL III)(30 IN)
LF 22.000 $125.000 $176.000 $250.000
RC PIPE (CL III)(36 IN)
LF 54.000 $150.000 $209.000 $300.000
RC PIPE (CL III)(48 IN)
LF 8.000 $200.000 $341.000 $450.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $7,000.000 $9,900.000 $4,500.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $10,000.000 $13,200.000 $5,500.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $13,000.000 $15,400.000 $6,500.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 1.000 $18,000.000 $18,700.000 $12,500.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 1.000 $20,000.000 $19,294.000 $15,000.000
HEADWALL (CH - PW - 0) (DIA= 54 IN)
EA 2.000 $23,000.000 $20,900.000 $20,000.000
HEADWALL (CH - PW - 0) (DIA= 60 IN)
EA 1.000 $25,000.000 $24,200.000 $35,000.000
HEADWALL (CH - PW - 0) (DIA= 66 IN)
EA 1.000 $27,000.000 $26,950.000 $40,000.000
WINGWALL (PW - 2) (HW=10 FT)
EA 1.000 $50,000.000 $77,727.100 $55,000.000
WINGWALL (PW - 2) (HW=13 FT)
EA 1.000 $75,000.000 $90,200.000 $65,000.000
WINGWALL (PW - 2) (HW=6 FT)
EA 1.000 $25,000.000 $22,492.800 $40,000.000
WINGWALL (PW - 2) (HW=8 FT)
EA 1.000 $35,000.000 $39,600.000 $50,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 3.000 $2,000.000 $1,100.000 $1,850.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 104.000 $1,050.000 $1,100.000 $1,650.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,600.000 $2,090.000 $2,200.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 4.000 $3,000.000 $2,420.000 $3,000.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 4.000 $5,000.000 $7,700.000 $4,000.000
CLEAN EXIST CULVERTS
EA 4.000 $2,500.000 $2,530.000 $2,500.000
MOBILIZATION
LS 1.000 $850,000.000 $1,110,000.000 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $3,500.000 $15,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 2,220.000 $50.000 $47.300 $30.000
ROCK FILTER DAMS (REMOVE)
LF 2,220.000 $12.000 $11.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 500.000 $25.000 $15.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 500.000 $5.000 $4.000 $15.000
CONSTRUCTION PERIMETER FENCE
LF 250.000 $10.000 $5.500 $50.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,522.000 $5.000 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,522.000 $1.500 $1.000 $2.000
INTERSECTIONS (ACP)
SY 969.000 $75.000 $80.000 $45.000
DRIVEWAYS (ACP)
SY 5,796.000 $75.000 $70.000 $45.000
TURNOUTS (SURF TREAT)
SY 552.000 $70.000 $72.420 $45.000
RUMBLE STRIPS (CENTERLINE)
LF 26,552.000 $0.500 $1.000 $0.500
WIRE FENCE (TY A)
LF 20.000 $25.000 $100.000 $20.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $800.000 $687.500 $1,000.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 21.000 $250.000 $275.000 $1,000.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 2.000 $300.000 $323.400 $1,000.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 1.000 $7,000.000 $9,000.000 $12,500.000
CONDT (PVC) (SCH 80) (2")
LF 225.000 $20.000 $35.000 $20.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 225.000 $30.000 $30.000 $40.000
ELEC CONDR (NO.8) BARE
LF 225.000 $2.000 $4.000 $3.000
ELEC CONDR (NO.8) INSULATED
LF 845.000 $2.250 $4.000 $3.000
GROUND BOX TY A (122311)W/APRON
EA 4.000 $1,800.000 $1,650.000 $1,500.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $9,000.000 $10,000.000 $10,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $1,000.000 $987.800 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $1,300.000 $974.600 $1,500.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 33.000 $525.000 $469.700 $1,500.000
REMOVE SM RD SN SUP&AM
EA 43.000 $110.000 $108.900 $100.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
EA 34.000 $125.000 $105.600 $100.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 42,311.000 $0.350 $0.390 $2.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 42,311.000 $0.350 $0.390 $2.000
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 10,578.000 $2.000 $2.750 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,232.000 $2.000 $2.000 $6.000
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
LF 42,212.000 $1.000 $1.050 $2.000
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 1,726.000 $0.750 $0.770 $2.000
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 44,365.000 $0.750 $0.770 $2.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 29.000 $20.000 $16.500 $20.000
REFL PAV MRKR TY II-A-A
EA 538.000 $6.000 $8.800 $6.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 1.000 $8,000.000 $13,500.000 $15,000.000
SP MIXES SP-C SAC-A PG70-22
TON 14,599.000 $180.000 $201.360 $217.000
BONDING COURSE
GAL 3,850.000 $6.000 $6.330 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $25,000.000 $60,000.000 $16,500.000
TMA (STATIONARY)
DAY 262.000 $250.000 $350.000 $250.000
TMA (MOBILE OPERATION)
DAY 25.000 $250.000 $50.000 $550.000
Totals: $9,242,282.700 $11,134,224.992 $11,850,270.000