RUSK FM 1251 (1388-01-010)

Items: 109

County: RUSK
Length: 3.8180 MILES
Highway: FM 1251
District: TYLER
Control Number: 1388-01-010
DBE Goal: 0.0%
Project: F 2026(471)
Guaranty: $100,000.00
Time: 285 WORKING DAYS
Engineer's Estimate: $8,986,323.64
Date: 04/07/2026 (2 months ago) Changed
Contract Number: 4263213
Type: ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDE
Project ID: A00060559
Contract Type: Federal
Project Description: REHABILITATE ROADWAY AND WIDEN TO 28'
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$8,986,323.64
$8,734,907.66
Over/Under Est: -2.8% -$251,415.98
Over/Under Est: 0.01% $993.28
Amt Left: 2.89% $252,409.26
Over/Under Est: 5.4% $485,499.25
Amt Left: 8.44% $736,915.23
Delta: -5.39% -$484,505.97
Over/Under Est: 7.76% $697,133.94
Amt Left: 10.86% $948,549.92
Delta: -2.23% -$211,634.69
Over/Under Est: 8.62% $774,260.27
Amt Left: 11.74% $1,025,676.25
Delta: -0.80% -$77,126.33
$9,788,548.77
Over/Under Est: 8.93% $802,225.13
Amt Left: 12.06% $1,053,641.11
Delta: -0.29% -$27,964.86
Over/Under Est: 15.6% $1,402,171.85
Amt Left: 18.93% $1,653,587.83
Delta: -6.13% -$599,946.72
$11,577,803.96
Over/Under Est: 28.84% $2,591,480.32
Amt Left: 32.55% $2,842,896.30
Delta: -11.45% -$1,189,308.47

Bid Items & Bid Tabulations

109 Total 0 of 109
RUSK  |  FM 1251  |  TYLER  |  1388-01-010  |  04/07/2026  |  $8,986,323.64  |  F 2026(471)  |  ROADWAY REHAB/RECON WITH NO ADDE  |  285 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DRAKE COMPANIES LLC
BIG CREEK CONSTRUCTION, LTD.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
MADDEN CONTRACTING COMPANY, LLC.
L. S. EQUIPMENT CO., INC.
REYNOLDS & KAY, LTD.
LONGVIEW BRIDGE AND ROAD, LTD.
A. L. HELMCAMP, INC.
PREPARING ROW
STA 266.690 $2,000.000 $3,000.000 $3,200.000 $2,050.000 $3,000.000 $2,800.000 $3,018.000 $3,400.000 $5,000.000
REMOV CONC (RIPRAP)
SY 72.000 $30.000 $18.000 $20.000 $33.000 $31.000 $49.000 $16.000 $20.000 $31.000
EXCAV (ROADWAY)
CY 1,221.000 $15.000 $22.000 $30.000 $26.000 $25.220 $15.000 $23.000 $20.000 $25.000
SUBGR WIDEN (DC)
STA 266.690 $292.000 $295.000 $850.000 $500.000 $233.300 $875.000 $500.000 $295.000 $350.000
EMBANK (VEH)(OC)(TY A)
CY 168.000 $25.000 $16.000 $50.000 $200.000 $50.000 $50.000 $45.000 $50.000 $50.000
EMBANK (VEH)(OC)(TY C)
CY 135.500 $54.000 $19.250 $100.000 $200.000 $50.000 $50.000 $65.000 $55.000 $50.000
BACKFILL (TY A)
STA 266.690 $350.000 $165.000 $250.000 $250.000 $471.170 $295.000 $1,700.000 $255.000 $300.000
BLADING
STA 281.490 $100.000 $145.000 $300.000 $312.000 $402.930 $250.000 $350.000 $200.000 $300.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 121,469.000 $0.600 $0.530 $0.550 $0.600 $0.480 $0.750 $0.600 $0.850 $0.500
BOND FBR MTRX SEED (TEMP)(WARM)
SY 60,353.000 $0.570 $0.530 $0.550 $0.550 $0.480 $0.750 $0.550 $0.800 $0.500
BOND FBR MTRX SEED (TEMP)(COOL)
SY 60,353.000 $0.560 $0.530 $0.550 $0.550 $0.480 $0.750 $0.550 $0.800 $0.500
VEGETATIVE WATERING
TGL 2,924.000 $17.000 $12.000 $20.000 $25.000 $20.000 $0.010 $20.000 $24.000 $2.000
PROOF ROLLING
HR 96.000 $135.000 $195.000 $100.000 $170.000 $200.000 $150.000 $70.000 $50.000 $200.000
REWORK BS MTL (TY C)(8")(ORD COMP)
SY 57,756.000 $3.000 $2.750 $2.500 $2.250 $3.250 $7.500 $2.000 $4.600 $5.000
CEMENT
TON 1,724.250 $280.000 $250.000 $230.000 $235.000 $245.860 $240.000 $265.000 $350.000 $260.000
CEMENT TRT (EXIST MATL)(8")
SY 83,297.000 $4.000 $2.500 $3.500 $3.950 $5.210 $4.500 $4.500 $2.500 $4.000
ASPH (RC-250)
GAL 23,323.000 $5.200 $5.500 $5.250 $6.400 $6.360 $5.000 $7.000 $5.300 $5.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 31,216.000 $6.000 $4.400 $4.250 $5.500 $4.750 $5.250 $5.000 $4.200 $4.500
AGGR (TY-PD OR PL, GR-4)
CY 693.000 $210.000 $176.000 $170.000 $170.000 $200.100 $195.000 $177.000 $250.000 $225.000
AGGR (TY-PD GR-5 OR TY-PL GR-5)
CY 595.000 $220.000 $166.000 $200.000 $190.000 $255.850 $205.000 $205.000 $260.000 $225.000
SP MIXES SP-B PG64-22
TON 18,361.300 $140.000 $137.750 $120.000 $149.000 $150.000 $142.500 $138.000 $148.000 $165.000
SP MIXES SP-C PG64-22 (LEVEL-UP)
TON 1,522.620 $140.000 $158.500 $150.000 $188.000 $175.000 $162.000 $160.000 $182.000 $195.000
SP MIXES SP-C PG76-22
TON 9,022.070 $144.000 $154.950 $140.000 $150.000 $175.000 $158.500 $150.000 $160.000 $185.000
TACK COAT
GAL 12,080.000 $5.000 $4.200 $1.000 $3.500 $0.010 $5.000 $3.000 $4.000 $5.000
CUT & RESTORING PAV
SY 33.000 $350.000 $250.000 $125.000 $210.000 $145.000 $210.000 $170.000 $250.000 $197.000
FLOWABLE BACKFILL
CY 20.000 $365.000 $280.000 $350.000 $368.000 $410.000 $500.000 $350.000 $260.000 $346.000
TRENCH EXCAVATION PROTECTION
LF 56.000 $80.000 $25.000 $20.000 $36.000 $25.000 $7.000 $1.000 $15.000 $33.000
TEMPORARY SPL SHORING
SF 1,047.000 $59.000 $58.000 $35.000 $52.000 $33.000 $50.000 $65.000 $62.000 $49.000
CL C CONC (COLLAR)
EA 28.000 $1,320.000 $1,075.000 $600.000 $893.000 $675.000 $1,800.000 $1,000.000 $1,450.000 $840.000
RIPRAP (CONC)(CL B)
CY 4.000 $900.000 $710.000 $900.000 $1,000.000 $750.000 $725.000 $1,100.000 $1,350.000 $945.000
RIPRAP (MOW STRIP)(4 IN)
CY 36.000 $720.000 $595.000 $800.000 $980.000 $695.000 $625.000 $900.000 $550.000 $924.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 43.000 $406.000 $235.000 $200.000 $335.000 $230.000 $350.000 $300.000 $340.000 $315.000
RETROFIT RAIL (TY T131RC)
LF 320.000 $200.000 $195.000 $230.000 $275.000 $186.000 $185.000 $200.000 $195.000 $372.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 24.000 $1,200.000 $895.000 $1,600.000 $1,000.000 $925.000 $900.000 $1,200.000 $1,225.000 $945.000
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
LF 26.000 $1,225.000 $960.000 $1,800.000 $1,450.000 $1,220.000 $975.000 $1,400.000 $1,500.000 $1,365.000
RC PIPE (CL III)(18 IN)
LF 830.000 $50.000 $55.000 $70.000 $80.000 $51.000 $68.000 $70.000 $65.000 $75.000
RC PIPE (CL III)(24 IN)
LF 228.000 $65.000 $75.000 $100.000 $134.000 $73.000 $87.500 $90.000 $87.000 $126.000
RC PIPE (CL III)(30 IN)
LF 16.000 $160.000 $150.000 $150.000 $190.000 $160.000 $152.500 $140.000 $155.000 $178.000
RC PIPE (CL III)(36 IN)
LF 54.000 $190.000 $155.000 $200.000 $212.000 $165.000 $200.000 $155.000 $135.000 $199.000
RC PIPE (CL III)(48 IN)
LF 16.000 $220.000 $260.000 $300.000 $324.000 $260.000 $350.000 $245.000 $260.000 $304.000
RC PIPE (CL III)(54 IN)
LF 24.000 $250.000 $265.000 $400.000 $380.000 $345.000 $500.000 $300.000 $265.000 $357.000
JCTBOX(COMPL)(PJB)(3FTX5FT)
EA 1.000 $8,500.000 $7,100.000 $10,000.000 $9,500.000 $6,950.000 $7,100.000 $6,500.000 $7,100.000 $8,925.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 3.000 $10,000.000 $9,900.000 $11,000.000 $14,000.000 $9,100.000 $10,500.000 $16,000.000 $13,500.000 $13,020.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 1.000 $12,500.000 $10,660.000 $13,000.000 $18,000.000 $12,200.000 $11,500.000 $26,000.000 $17,400.000 $16,800.000
HEADWALL (CH - PW - 0) (DIA= 54 IN)
EA 2.000 $15,000.000 $13,775.000 $15,000.000 $22,000.000 $18,450.000 $14,000.000 $30,000.000 $21,200.000 $20,475.000
WINGWALL (PW - 2) (HW=7 FT)
EA 1.000 $23,463.000 $21,975.000 $32,000.000 $26,000.000 $31,200.000 $24,500.000 $25,000.000 $33,100.000 $24,150.000
WINGWALL (PW - 2) (HW=8 FT)
EA 3.000 $28,589.000 $27,145.000 $45,000.000 $37,000.000 $38,750.000 $26,500.000 $30,000.000 $42,000.000 $34,650.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 2.000 $1,550.000 $720.000 $800.000 $1,060.000 $610.000 $710.000 $1,350.000 $780.000 $997.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 7.000 $950.000 $815.000 $825.000 $1,060.000 $610.000 $710.000 $1,350.000 $838.000 $997.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 4.000 $1,350.000 $955.000 $950.000 $1,060.000 $610.000 $900.000 $1,350.000 $936.000 $997.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 54.000 $950.000 $955.000 $950.000 $1,230.000 $610.000 $900.000 $1,350.000 $1,035.000 $1,155.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 9.000 $1,200.000 $1,175.000 $1,400.000 $1,400.000 $890.000 $1,500.000 $2,000.000 $1,250.000 $1,312.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 3.000 $1,520.000 $1,385.000 $1,700.000 $1,625.000 $1,135.000 $1,500.000 $2,000.000 $1,465.000 $1,527.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $1,400.000 $1,385.000 $1,700.000 $1,565.000 $1,135.000 $1,500.000 $2,000.000 $1,440.000 $1,470.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 1.000 $2,000.000 $1,865.000 $2,200.000 $1,950.000 $1,270.000 $2,250.000 $2,700.000 $2,000.000 $1,837.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 1.000 $2,400.000 $2,350.000 $3,400.000 $2,455.000 $1,880.000 $2,250.000 $3,000.000 $2,450.000 $2,310.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 1.000 $3,500.000 $2,785.000 $4,000.000 $3,570.000 $2,110.000 $2,500.000 $4,000.000 $2,900.000 $3,360.000
SET (TY II) (48 IN) (RCP) (4: 1) (C)
EA 1.000 $5,000.000 $6,755.000 $10,000.000 $7,800.000 $5,800.000 $6,000.000 $8,000.000 $6,900.000 $7,350.000
CLEAN EXIST CULVERTS
EA 6.000 $4,000.000 $1,050.000 $2,000.000 $2,230.000 $1,000.000 $1,500.000 $1,700.000 $2,500.000 $2,100.000
REMOV STR (PIPE)
EA 31.000 $410.000 $515.000 $360.000 $360.000 $200.000 $45.000 $800.000 $950.000 $336.000
MOBILIZATION
LS 1.000 $664,095.000 $580,000.000 $880,000.000 $700,000.000 $606,000.000 $800,000.000 $688,000.000 $1,000,000.000 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $6,000.000 $5,150.000 $4,000.000 $3,500.000 $10,000.000 $2,500.000 $5,000.000 $1,600.000 $15,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 42.000 $150.000 $135.000 $150.000 $233.000 $100.000 $150.000 $100.000 $330.000 $150.000
TMA (STATIONARY)
DAY 224.000 $240.000 $190.000 $200.000 $265.000 $330.000 $225.000 $350.000 $330.000 $200.000
TMA (MOBILE OPERATION)
DAY 72.000 $310.000 $275.000 $400.000 $265.000 $0.010 $225.000 $100.000 $450.000 $550.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,320.000 $40.000 $42.000 $60.000 $36.000 $39.000 $55.000 $35.000 $66.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 1,320.000 $14.000 $11.000 $10.000 $11.000 $10.000 $6.000 $10.000 $23.000 $10.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 300.000 $30.000 $28.500 $30.000 $43.000 $25.000 $20.000 $16.000 $50.000 $82.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 300.000 $107.000 $85.000 $100.000 $55.000 $50.000 $75.000 $65.000 $230.000 $122.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,400.000 $4.300 $4.000 $4.200 $4.000 $3.690 $4.500 $4.000 $6.100 $3.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,400.000 $1.000 $1.000 $1.000 $1.000 $0.750 $0.750 $0.900 $1.750 $0.750
INTERSECTIONS (ACP)
SY 927.000 $70.000 $40.000 $35.000 $73.000 $49.000 $55.000 $75.000 $50.000 $82.000
DRIVEWAYS (ACP)
SY 3,082.000 $70.000 $48.000 $40.000 $77.000 $44.250 $46.000 $49.000 $70.000 $82.000
TURNOUTS (ACP)
SY 186.000 $109.000 $48.000 $40.000 $81.000 $71.000 $55.000 $157.000 $115.000 $140.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 51,614.000 $0.260 $0.170 $0.200 $0.250 $0.300 $0.180 $0.150 $0.200 $0.200
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 25,587.000 $0.280 $0.290 $0.200 $0.250 $0.300 $0.250 $0.150 $0.250 $0.290
MTL W-BEAM GD FEN (STEEL POST)
LF 500.000 $31.000 $30.000 $40.000 $33.500 $30.000 $32.000 $33.000 $33.000 $31.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,050.000 $2,500.000 $2,600.000 $1,125.000 $1,350.000 $1,200.000 $1,240.000 $2,348.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $2.420 $2.750 $3.000 $2.800 $2.500 $2.500 $2.750 $2.750 $3.150
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $200.000 $220.000 $250.000 $225.000 $200.000 $220.000 $225.000 $220.000 $210.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,300.000 $3,440.000 $3,300.000 $3,500.000 $3,125.000 $3,300.000 $3,500.000 $3,450.000 $3,150.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $230.000 $220.000 $250.000 $225.000 $200.000 $220.000 $225.000 $220.000 $262.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 17.000 $330.000 $370.000 $350.000 $375.000 $336.000 $366.000 $375.000 $260.000 $252.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 2.000 $380.000 $410.000 $400.000 $415.000 $371.000 $375.000 $400.000 $300.000 $273.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 52.000 $700.000 $760.000 $700.000 $770.000 $690.000 $696.500 $775.000 $750.000 $892.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $875.000 $890.000 $900.000 $900.000 $809.000 $820.000 $900.000 $935.000 $1,039.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,500.000 $1,450.000 $1,500.000 $1,500.000 $1,318.000 $1,340.000 $1,400.000 $1,540.000 $1,039.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 1.000 $110.000 $1,550.000 $1,550.000 $1,575.000 $1,410.000 $1,430.000 $1,500.000 $1,550.000 $1,039.000
REMOVE SM RD SN SUP&AM
EA 60.000 $108.500 $110.000 $125.000 $110.000 $101.000 $101.000 $110.000 $125.000 $105.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 6.000 $19.000 $22.000 $30.000 $20.000 $18.000 $20.000 $20.000 $20.000 $21.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 12.000 $28.000 $28.000 $40.000 $28.000 $25.000 $35.000 $28.000 $27.500 $26.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 56.000 $65.000 $100.000 $100.000 $104.000 $93.000 $93.500 $100.000 $71.500 $79.000
INSTL OM SM RD SIGN (1-OM-CON)R
EA 8.000 $25.000 $84.000 $85.000 $85.000 $76.000 $76.000 $85.000 $52.000 $21.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 60,595.000 $0.330 $0.450 $0.400 $0.400 $0.400 $0.500 $0.450 $0.450 $0.370
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 3,780.000 $0.650 $0.450 $0.400 $0.400 $0.400 $0.500 $0.450 $0.450 $0.370
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 116,342.000 $0.270 $0.450 $0.400 $0.400 $0.400 $0.430 $0.450 $0.450 $0.370
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,788.000 $0.650 $1.750 $1.500 $2.000 $2.500 $2.000 $1.100 $2.500 $1.120
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 80.000 $2.000 $2.750 $3.000 $2.800 $2.500 $3.000 $2.750 $2.750 $2.630
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 228.000 $8.000 $7.700 $10.000 $7.800 $7.000 $8.000 $7.750 $7.700 $7.350
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 60,595.000 $0.650 $0.720 $0.720 $0.750 $0.650 $0.750 $0.700 $0.750 $0.680
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 1,890.000 $0.950 $0.940 $0.940 $0.950 $0.850 $0.950 $0.950 $0.950 $0.890
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 58,171.000 $0.650 $0.720 $0.720 $0.750 $0.650 $0.750 $0.700 $0.750 $0.680
REFL PAV MRKR TY I-A
EA 192.000 $5.000 $6.600 $7.000 $6.700 $6.000 $6.500 $6.500 $6.600 $6.300
REFL PAV MRKR TY I-C
EA 4.000 $5.000 $6.600 $7.000 $6.700 $6.000 $6.500 $6.500 $6.600 $6.300
REFL PAV MRKR TY II-A-A
EA 943.000 $5.200 $5.500 $6.000 $5.600 $5.000 $5.500 $5.500 $5.500 $5.250
FULL - WIDTH MOWING
CYC 4.000 $5,500.000 $5,500.000 $6,000.000 $6,000.000 $3,200.000 $8,500.000 $3,200.000 $3,300.000 $6,000.000
LITTER REMOVAL
CYC 4.000 $3,000.000 $3,000.000 $3,000.000 $4,500.000 $1,600.000 $2,500.000 $1,000.000 $2,000.000 $5,500.000
INSTALL FTB
LF 100.000 $60.000 $66.000 $70.000 $85.000 $60.000 $65.000 $50.000 $40.000 $63.000
REMOVE FTB
LF 100.000 $15.000 $22.000 $20.000 $15.000 $20.000 $25.000 $1.000 $2.200 $21.000
Totals: $8,986,323.640 $8,734,907.646 $8,987,316.920 $9,471,822.890 $9,683,457.565 $9,760,583.905 $9,788,548.770 $10,388,495.490 $11,577,803.960
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $15,000.00