Show Job Controls
Bid Cobra

RUSK SH 64 (0245-08-054)

Items: 141

County: RUSK
Length: 0.0000 MILES
Highway: SH 64
District: TYLER
Control Number: 0245-08-054
DBE Goal: 0.0%
Project: STP 2026(238)HES
Guaranty: $100,000.00
Time: 315 WORKING DAYS
Engineer's Estimate: $13,420,245.06
Date: 01/06/2026 (5 months ago)
Contract Number: 1263006
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00184512
Contract Type: Federal
Project Description: INSTALL TWLTL AND BRIDGE REPLACEMENT.
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$13,420,245.06
$13,629,477.94
Over/Under Est: 1.56% $209,232.88
Over/Under Est: 5.31% $713,256.76
Amt Left: 3.7% $504,023.88
$14,203,271.41
Over/Under Est: 5.83% $783,026.35
Amt Left: 4.21% $573,793.47
Delta: -0.49% -$69,769.59
$14,349,366.06
Over/Under Est: 6.92% $929,121.00
Amt Left: 5.28% $719,888.12
Delta: -1.03% -$146,094.65
Over/Under Est: 12.54% $1,683,463.64
Amt Left: 10.82% $1,474,230.76
Delta: -5.26% -$754,342.64

Bid Items & Bid Tabulations

141 Total 0 of 141
RUSK  |  SH 64  |  TYLER  |  0245-08-054  |  01/06/2026  |  $13,420,245.06  |  STP 2026(238)HES  |  HAZARD ELIM & SAFETY  |  315 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONGVIEW BRIDGE AND ROAD, LTD.
PINTO CONSTRUCTION CO., INC.
EAST TEXAS BRIDGE, INC.
A. L. HELMCAMP, INC.
L. S. EQUIPMENT CO., INC.
PREPARING ROW
STA 173.830 $2,400.000 $3,500.000 $1,850.000 $2,200.000 $1,850.000 $1,875.000
REMOV CONC (PAV)
SY 5,463.000 $15.000 $17.000 $35.540 $15.000 $22.000 $65.000
REMOV CONC (MOWSTRIP)
SY 858.000 $20.000 $23.000 $24.150 $30.000 $24.000 $31.500
REMOV CONC (RIPRAP)
SY 15.000 $80.000 $60.000 $30.450 $30.000 $30.000 $45.500
REMOV CONC (DRIVEWAYS)
SY 145.000 $30.000 $21.000 $30.450 $30.000 $30.000 $24.500
REMOV CONC (CURB)
LF 1,104.000 $20.000 $6.000 $18.380 $10.000 $18.000 $19.500
RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
SY 17,239.000 $14.000 $6.000 $4.340 $8.000 $12.000 $6.000
RMV (13"-17") TRT/UNTRT BASE & ASPH PAV
SY 10,283.000 $12.000 $8.000 $10.070 $12.000 $25.000 $6.500
EXCAV (ROADWAY)
CY 34,832.000 $11.000 $10.500 $12.820 $18.000 $24.000 $13.500
EMBANK (FNL)(DC)(TY C)
CY 14,626.000 $15.000 $15.500 $14.290 $22.000 $16.000 $24.500
FURN & PLACE TOPSOIL (4")
SY 111,150.000 $3.000 $2.500 $2.100 $2.500 $0.900 $2.500
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 111,150.000 $0.600 $0.590 $0.550 $0.600 $0.550 $0.580
BOND FBR MTRX SEED (TEMP)(WARM)
SY 55,575.000 $0.600 $0.570 $0.550 $0.550 $0.550 $0.580
BOND FBR MTRX SEED (TEMP)(COOL)
SY 55,575.000 $0.400 $0.580 $0.550 $0.550 $0.550 $0.580
VEGETATIVE WATERING
TGL 2,445.300 $12.000 $11.000 $0.010 $12.000 $1.000 $0.010
FL BS (CMP IN PLC)(TY A GR 1-2) (12")
SY 39,838.000 $45.000 $48.000 $56.180 $48.000 $39.000 $34.660
CEMENT
TON 1,209.000 $280.000 $295.000 $259.660 $265.000 $230.000 $275.000
CEMENT TRT (SUBGRADE)(12")
SY 44,757.000 $4.250 $2.500 $7.020 $4.000 $11.000 $6.500
PRIME COAT & BLOTTER (MC-30)
GAL 3,818.000 $8.000 $5.850 $12.600 $6.250 $5.500 $7.000
EMULS ASPH (EROSN CONT)(CSS-1)
GAL 1,611.000 $7.000 $5.000 $13.140 $6.000 $12.500 $5.250
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 41,454.000 $5.000 $4.000 $4.150 $5.500 $4.000 $5.250
AGGR (TY-PD OR PL, GR-3)
CY 922.000 $190.000 $195.000 $179.250 $235.000 $280.000 $225.000
SP MIXES SP-C PG70-22
TON 12,368.000 $140.000 $160.000 $177.680 $173.000 $150.000 $160.000
TACK COAT
GAL 6,111.000 $5.000 $4.000 $6.300 $5.000 $5.000 $6.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 23,947.000 $3.750 $2.750 $2.300 $4.000 $3.500 $2.920
PLANE ASPH CONC PAV(2")
SY 10,241.000 $5.000 $2.750 $2.990 $4.000 $4.300 $2.920
CEM STABIL BKFL
CY 248.000 $280.000 $250.000 $246.750 $350.000 $255.000 $250.000
FLOWABLE BACKFILL
CY 4.000 $370.000 $500.000 $346.500 $500.000 $345.000 $500.000
TRENCH EXCAVATION PROTECTION
LF 35.000 $12.000 $20.000 $21.000 $30.000 $21.000 $20.000
TEMPORARY SPL SHORING
SF 7,886.000 $40.000 $65.000 $42.000 $65.000 $42.000 $88.000
DRILL SHAFT (36 IN)
LF 744.000 $330.000 $420.000 $341.250 $275.000 $350.000 $335.000
CL C CONC (ABUT)(HPC)
CY 64.600 $1,700.000 $1,500.000 $1,890.000 $1,300.000 $2,715.000 $1,950.000
CL C CONC (CAP)(HPC)
CY 49.800 $1,800.000 $1,450.000 $1,575.000 $1,300.000 $3,000.000 $1,650.000
CL C CONC (COLUMN)(HPC)
CY 34.800 $2,100.000 $1,550.000 $1,995.000 $1,350.000 $2,000.000 $2,200.000
CL C CONC (COLLAR)
EA 2.000 $1,400.000 $2,000.000 $1,417.500 $2,000.000 $1,420.000 $2,200.000
CL E CONC (SEAL SLAB)(NON-REINF)
CY 14.000 $500.000 $550.000 $477.750 $600.000 $475.000 $850.000
REINF CONC SLAB (HPC)
SF 6,900.000 $32.000 $32.000 $34.130 $33.000 $49.000 $35.500
APPROACH SLAB (HPC)
CY 112.000 $900.000 $1,000.000 $840.000 $770.000 $1,100.000 $880.000
PRESTR CONC GIRDER (TX28)
LF 794.500 $300.000 $300.000 $357.000 $275.000 $265.000 $360.000
RIPRAP (CONC)(5 IN)
CY 4.000 $900.000 $750.000 $756.000 $800.000 $756.000 $1,200.000
RIPRAP (MOW STRIP)(4 IN)
CY 95.000 $700.000 $600.000 $971.250 $650.000 $970.000 $800.000
RIPRAP (STONE COMMON)(DRY)(8 IN)
CY 2.000 $230.000 $625.000 $262.030 $1,000.000 $262.000 $495.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 843.000 $250.000 $210.000 $267.750 $225.000 $267.000 $250.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 3,158.000 $180.000 $210.000 $236.250 $225.000 $139.000 $255.000
RAIL (TY SSTR)(HPC)
LF 278.000 $170.000 $100.000 $130.200 $120.000 $190.000 $130.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 124.000 $275.000 $225.000 $210.000 $210.000 $311.000 $210.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 14.000 $990.000 $2,600.000 $863.100 $800.000 $863.000 $1,750.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 8.000 $1,700.000 $4,300.000 $892.500 $1,000.000 $892.000 $2,250.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 15.000 $1,500.000 $2,600.000 $892.500 $1,000.000 $892.000 $1,540.000
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
LF 22.000 $1,600.000 $1,900.000 $997.500 $1,200.000 $997.000 $1,500.000
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
LF 14.000 $2,500.000 $3,000.000 $1,785.000 $2,000.000 $1,785.000 $2,475.000
WINGWALL (FW - S) (HW=5 FT)
EA 1.000 $11,000.000 $16,500.000 $13,125.000 $10,000.000 $13,125.000 $15,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $35,000.000 $16,700.000 $17,325.000 $12,000.000 $17,325.000 $16,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $27,000.000 $18,000.000 $26,250.000 $18,000.000 $26,250.000 $21,500.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $42,500.000 $24,000.000 $30,450.000 $28,000.000 $30,450.000 $25,000.000
WINGWALL (PW - 1) (HW=10 FT)
EA 2.000 $50,000.000 $28,000.000 $44,100.000 $42,000.000 $44,100.000 $35,000.000
WINGWALL (PW - 1) (HW=12 FT)
EA 1.000 $65,000.000 $48,000.000 $72,975.000 $85,000.000 $72,975.000 $60,000.000
WINGWALL (PW - 1) (HW=13 FT)
EA 1.000 $24,000.000 $45,000.000 $75,600.000 $60,000.000 $75,600.000 $60,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 199.000 $1,000.000 $975.000 $945.000 $1,000.000 $945.000 $891.250
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $2,000.000 $1,400.000 $1,548.750 $1,500.000 $1,548.000 $1,525.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 2.000 $3,800.000 $2,400.000 $2,310.000 $3,000.000 $2,310.000 $2,650.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $2,700.000 $4,500.000 $4,200.000 $4,700.000 $4,200.000 $5,500.000
PIPE (PVC) (SCH 40) (12 IN)
LF 104.000 $40.000 $55.000 $40.000 $40.000 $65.000 $25.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $80,000.000 $55,000.000 $131,250.000 $90,000.000 $140,000.000 $100,000.000
REMOV STR (PIPE)
EA 100.000 $500.000 $350.000 $315.000 $500.000 $315.000 $500.000
MOBILIZATION
LS 1.000 $1,051,355.680 $1,250,000.000 $1,000,000.000 $1,200,000.000 $1,300,000.000 $1,200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $6,000.000 $6,000.000 $2,630.000 $10,000.000 $13,000.000 $9,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 301.000 $100.000 $130.000 $200.000 $125.000 $408.000 $100.000
TMA (STATIONARY)
DAY 301.000 $150.000 $225.000 $250.000 $250.000 $275.000 $225.000
TMA (MOBILE OPERATION)
DAY 100.000 $100.000 $275.000 $50.000 $250.000 $275.000 $225.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 525.000 $55.000 $45.000 $39.900 $45.000 $40.000 $41.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 596.000 $75.000 $45.000 $52.500 $55.000 $52.000 $53.000
ROCK FILTER DAMS (REMOVE)
LF 1,106.000 $18.000 $16.000 $12.600 $15.000 $13.000 $2.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 445.000 $40.000 $55.000 $29.400 $32.000 $20.000 $31.500
CONSTRUCTION EXITS (REMOVE)
SY 445.000 $12.000 $18.000 $10.500 $11.000 $5.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,990.000 $5.000 $4.500 $4.200 $4.500 $4.200 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,990.000 $1.700 $1.250 $0.530 $0.600 $0.550 $0.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 744.000 $10.000 $6.000 $6.300 $7.000 $6.300 $6.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 744.000 $2.000 $1.500 $1.050 $1.000 $1.050 $1.100
CONSTRUCTING DETOURS
SY 2,361.000 $135.000 $82.000 $133.370 $80.000 $125.000 $195.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 540.000 $60.000 $45.000 $151.480 $55.000 $100.000 $30.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 540.000 $28.000 $5.500 $65.090 $15.000 $50.000 $23.520
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 540.000 $25.000 $15.000 $18.180 $35.000 $100.000 $25.000
INTERSECTIONS (ACP)
SY 2,468.000 $60.000 $40.000 $38.550 $40.000 $42.000 $82.500
DRIVEWAYS (CONC) (HES)
SY 200.000 $115.000 $100.000 $183.750 $120.000 $185.000 $125.000
DRIVEWAYS (ACP)
SY 16,665.000 $45.000 $45.000 $45.100 $45.000 $42.000 $82.500
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 34,036.000 $0.330 $0.220 $0.160 $0.350 $0.340 $0.250
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 34,036.000 $0.250 $0.220 $0.180 $0.350 $0.340 $0.250
MTL W-BEAM GD FEN (STEEL POST)
LF 925.000 $30.000 $28.000 $27.300 $28.000 $27.000 $26.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,300.000 $2,075.000 $2,262.750 $2,200.000 $1,979.000 $1,900.000
REMOVE METAL BEAM GUARD FENCE
LF 2,260.000 $3.000 $3.000 $2.100 $2.750 $2.100 $4.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,400.000 $3,200.000 $3,013.500 $3,200.000 $3,015.000 $3,150.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,500.000 $3,300.000 $1,919.500 $3,300.000 $1,115.000 $3,200.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,300.000 $1,100.000 $1,468.500 $1,100.000 $1,115.000 $1,250.000
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 2.000 $7,500.000 $35,500.000 $8,206.000 $36,000.000 $35,000.000 $33,250.000
REMOVE AND INSTALL EXISTING GATE
EA 2.000 $2,000.000 $1,200.000 $2,500.000 $500.000 $2,760.000 $500.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 5.000 $670.000 $800.000 $874.500 $800.000 $619.000 $750.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 59.000 $340.000 $370.000 $368.500 $375.000 $231.000 $365.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 13.000 $370.000 $420.000 $401.500 $425.000 $263.000 $395.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 33.000 $900.000 $720.000 $830.500 $725.000 $725.000 $675.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $1,200.000 $990.000 $957.000 $1,000.000 $893.000 $915.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,100.000 $1,150.000 $1,083.500 $1,150.000 $1,040.000 $1,150.000
REMOVE SM RD SN SUP&AM
EA 7.000 $130.000 $110.000 $143.000 $110.000 $105.000 $109.500
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 22.000 $70.000 $90.000 $115.500 $55.000 $79.000 $55.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 13.000 $110.000 $97.000 $137.500 $100.000 $79.000 $95.000
INSTL OM SM RD SIGN (1-OM-CON)Y
EA 4.000 $390.000 $145.000 $100.000 $150.000 $26.000 $135.000
INSTL OM SM RD SIGN (1-OM-CON)R
EA 7.000 $300.000 $28.000 $100.000 $130.000 $26.000 $120.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 32,028.000 $0.500 $0.400 $0.370 $0.380 $0.370 $0.400
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 48,134.000 $0.500 $0.400 $0.370 $0.380 $0.370 $0.400
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 310.000 $1.400 $5.500 $5.250 $5.500 $5.250 $7.250
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 620.000 $1.200 $5.500 $5.250 $5.500 $5.250 $7.250
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,073.000 $2.300 $2.000 $3.150 $2.000 $0.530 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 4,369.000 $2.000 $2.000 $3.150 $2.000 $0.530 $2.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 90.000 $2.000 $3.300 $3.150 $3.300 $3.150 $3.200
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 162.000 $2.000 $3.000 $2.630 $2.750 $2.630 $2.550
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 877.000 $1.000 $1.750 $1.580 $1.650 $1.580 $1.750
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 151.000 $6.000 $8.000 $7.350 $7.700 $7.350 $7.250
PAVEMENT SLER 6"
LF 90.000 $2.000 $2.200 $2.100 $2.200 $2.100 $2.100
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 349.000 $1.000 $1.100 $1.050 $1.100 $1.050 $1.050
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 34,191.000 $0.500 $0.950 $0.890 $0.930 $0.890 $0.920
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 8,738.000 $0.500 $0.950 $0.890 $0.930 $0.890 $0.920
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 34,951.000 $0.500 $0.950 $0.890 $0.930 $0.890 $0.920
PREFAB PM TY C (W)(ARROW)
EA 2.000 $225.000 $250.000 $236.250 $275.000 $236.000 $235.000
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 2.000 $400.000 $305.000 $288.750 $300.000 $289.000 $280.000
PREFAB PM TY C (W)(WORD)
EA 2.000 $240.000 $275.000 $262.500 $275.000 $263.000 $255.000
REFL PAV MRKR TY I-C
EA 44.000 $4.500 $5.500 $5.250 $5.500 $5.250 $5.150
REFL PAV MRKR TY II-A-A
EA 1,039.000 $6.000 $5.500 $5.250 $5.500 $5.250 $5.150
TRAFFIC BUTTON TY W
EA 62.000 $7.000 $5.500 $5.250 $5.500 $5.250 $5.150
TRAFFIC BUTTON TY Y
EA 62.000 $5.000 $5.500 $5.250 $5.500 $5.250 $5.150
ELIM EXT PM & MRKS (6")
LF 22,208.000 $2.000 $0.500 $0.470 $0.500 $0.470 $0.470
ELIM EXT PM & MRKS (RUMBLE STRIP)
LF 47,663.000 $3.500 $0.600 $0.150 $0.500 $1.050 $1.000
PAV SURF PREP FOR MRK (6")
LF 90.000 $0.800 $2.200 $2.100 $2.200 $2.100 $0.500
FULL - WIDTH MOWING
CYC 3.000 $5,800.000 $7,500.000 $3,500.000 $8,000.000 $6,500.000 $5,000.000
LITTER REMOVAL
CYC 3.000 $6,000.000 $4,500.000 $1,500.000 $3,600.000 $5,500.000 $500.000
1
RC PIPE (CL III)(18 IN)
LF 4,068.000 $55.000 $50.000 $65.100 $62.000 $65.000 $76.250
1
RC PIPE (CL III)(24 IN)
LF 98.000 $150.000 $67.000 $105.000 $90.000 $105.000 $106.500
1
RC PIPE (CL III)(30 IN)
LF 50.000 $220.000 $130.000 $210.000 $130.000 $210.000 $249.000
1A
RC PIPE (CL III)(30 IN)
LF 0.000 $220.000 $0.000 $0.000 $0.000 $0.000 $0.000
1A
THERMOPLASTIC PIPE (PP) (18")
LF 0.000 $55.000 $0.000 $0.000 $0.000 $0.000 $0.000
1A
THERMOPLASTIC PIPE (PP) (24")
LF 0.000 $150.000 $0.000 $0.000 $0.000 $0.000 $0.000
1A
THERMOPLASTIC PIPE (PP) (30")
LF 0.000 $220.000 $0.000 $0.000 $0.000 $0.000 $0.000
Totals: $13,420,245.060 $13,629,477.940 $14,133,501.823 $14,203,271.410 $14,349,366.060 $15,103,708.703