PREPARING ROW
|
STA
|
173.830
|
$2,400.000
|
$3,500.000
|
$1,850.000
|
$2,200.000
|
$1,850.000
|
$1,875.000
|
|
|
|
REMOV CONC (PAV)
|
SY
|
5,463.000
|
$15.000
|
$17.000
|
$35.540
|
$15.000
|
$22.000
|
$65.000
|
|
|
|
REMOV CONC (MOWSTRIP)
|
SY
|
858.000
|
$20.000
|
$23.000
|
$24.150
|
$30.000
|
$24.000
|
$31.500
|
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
15.000
|
$80.000
|
$60.000
|
$30.450
|
$30.000
|
$30.000
|
$45.500
|
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
145.000
|
$30.000
|
$21.000
|
$30.450
|
$30.000
|
$30.000
|
$24.500
|
|
|
|
REMOV CONC (CURB)
|
LF
|
1,104.000
|
$20.000
|
$6.000
|
$18.380
|
$10.000
|
$18.000
|
$19.500
|
|
|
|
RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
|
SY
|
17,239.000
|
$14.000
|
$6.000
|
$4.340
|
$8.000
|
$12.000
|
$6.000
|
|
|
|
RMV (13"-17") TRT/UNTRT BASE & ASPH PAV
|
SY
|
10,283.000
|
$12.000
|
$8.000
|
$10.070
|
$12.000
|
$25.000
|
$6.500
|
|
|
|
EXCAV (ROADWAY)
|
CY
|
34,832.000
|
$11.000
|
$10.500
|
$12.820
|
$18.000
|
$24.000
|
$13.500
|
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
14,626.000
|
$15.000
|
$15.500
|
$14.290
|
$22.000
|
$16.000
|
$24.500
|
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
111,150.000
|
$3.000
|
$2.500
|
$2.100
|
$2.500
|
$0.900
|
$2.500
|
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
111,150.000
|
$0.600
|
$0.590
|
$0.550
|
$0.600
|
$0.550
|
$0.580
|
|
|
|
BOND FBR MTRX SEED (TEMP)(WARM)
|
SY
|
55,575.000
|
$0.600
|
$0.570
|
$0.550
|
$0.550
|
$0.550
|
$0.580
|
|
|
|
BOND FBR MTRX SEED (TEMP)(COOL)
|
SY
|
55,575.000
|
$0.400
|
$0.580
|
$0.550
|
$0.550
|
$0.550
|
$0.580
|
|
|
|
VEGETATIVE WATERING
|
TGL
|
2,445.300
|
$12.000
|
$11.000
|
$0.010
|
$12.000
|
$1.000
|
$0.010
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 1-2) (12")
|
SY
|
39,838.000
|
$45.000
|
$48.000
|
$56.180
|
$48.000
|
$39.000
|
$34.660
|
|
|
|
CEMENT
|
TON
|
1,209.000
|
$280.000
|
$295.000
|
$259.660
|
$265.000
|
$230.000
|
$275.000
|
|
|
|
CEMENT TRT (SUBGRADE)(12")
|
SY
|
44,757.000
|
$4.250
|
$2.500
|
$7.020
|
$4.000
|
$11.000
|
$6.500
|
|
|
|
PRIME COAT & BLOTTER (MC-30)
|
GAL
|
3,818.000
|
$8.000
|
$5.850
|
$12.600
|
$6.250
|
$5.500
|
$7.000
|
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1)
|
GAL
|
1,611.000
|
$7.000
|
$5.000
|
$13.140
|
$6.000
|
$12.500
|
$5.250
|
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
41,454.000
|
$5.000
|
$4.000
|
$4.150
|
$5.500
|
$4.000
|
$5.250
|
|
|
|
AGGR (TY-PD OR PL, GR-3)
|
CY
|
922.000
|
$190.000
|
$195.000
|
$179.250
|
$235.000
|
$280.000
|
$225.000
|
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
12,368.000
|
$140.000
|
$160.000
|
$177.680
|
$173.000
|
$150.000
|
$160.000
|
|
|
|
TACK COAT
|
GAL
|
6,111.000
|
$5.000
|
$4.000
|
$6.300
|
$5.000
|
$5.000
|
$6.000
|
|
|
|
PLANE & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
23,947.000
|
$3.750
|
$2.750
|
$2.300
|
$4.000
|
$3.500
|
$2.920
|
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
10,241.000
|
$5.000
|
$2.750
|
$2.990
|
$4.000
|
$4.300
|
$2.920
|
|
|
|
CEM STABIL BKFL
|
CY
|
248.000
|
$280.000
|
$250.000
|
$246.750
|
$350.000
|
$255.000
|
$250.000
|
|
|
|
FLOWABLE BACKFILL
|
CY
|
4.000
|
$370.000
|
$500.000
|
$346.500
|
$500.000
|
$345.000
|
$500.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
35.000
|
$12.000
|
$20.000
|
$21.000
|
$30.000
|
$21.000
|
$20.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
7,886.000
|
$40.000
|
$65.000
|
$42.000
|
$65.000
|
$42.000
|
$88.000
|
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
744.000
|
$330.000
|
$420.000
|
$341.250
|
$275.000
|
$350.000
|
$335.000
|
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
64.600
|
$1,700.000
|
$1,500.000
|
$1,890.000
|
$1,300.000
|
$2,715.000
|
$1,950.000
|
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
49.800
|
$1,800.000
|
$1,450.000
|
$1,575.000
|
$1,300.000
|
$3,000.000
|
$1,650.000
|
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
34.800
|
$2,100.000
|
$1,550.000
|
$1,995.000
|
$1,350.000
|
$2,000.000
|
$2,200.000
|
|
|
|
CL C CONC (COLLAR)
|
EA
|
2.000
|
$1,400.000
|
$2,000.000
|
$1,417.500
|
$2,000.000
|
$1,420.000
|
$2,200.000
|
|
|
|
CL E CONC (SEAL SLAB)(NON-REINF)
|
CY
|
14.000
|
$500.000
|
$550.000
|
$477.750
|
$600.000
|
$475.000
|
$850.000
|
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
6,900.000
|
$32.000
|
$32.000
|
$34.130
|
$33.000
|
$49.000
|
$35.500
|
|
|
|
APPROACH SLAB (HPC)
|
CY
|
112.000
|
$900.000
|
$1,000.000
|
$840.000
|
$770.000
|
$1,100.000
|
$880.000
|
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
794.500
|
$300.000
|
$300.000
|
$357.000
|
$275.000
|
$265.000
|
$360.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
4.000
|
$900.000
|
$750.000
|
$756.000
|
$800.000
|
$756.000
|
$1,200.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
95.000
|
$700.000
|
$600.000
|
$971.250
|
$650.000
|
$970.000
|
$800.000
|
|
|
|
RIPRAP (STONE COMMON)(DRY)(8 IN)
|
CY
|
2.000
|
$230.000
|
$625.000
|
$262.030
|
$1,000.000
|
$262.000
|
$495.000
|
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
843.000
|
$250.000
|
$210.000
|
$267.750
|
$225.000
|
$267.000
|
$250.000
|
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
3,158.000
|
$180.000
|
$210.000
|
$236.250
|
$225.000
|
$139.000
|
$255.000
|
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
278.000
|
$170.000
|
$100.000
|
$130.200
|
$120.000
|
$190.000
|
$130.000
|
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
124.000
|
$275.000
|
$225.000
|
$210.000
|
$210.000
|
$311.000
|
$210.000
|
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
14.000
|
$990.000
|
$2,600.000
|
$863.100
|
$800.000
|
$863.000
|
$1,750.000
|
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
8.000
|
$1,700.000
|
$4,300.000
|
$892.500
|
$1,000.000
|
$892.000
|
$2,250.000
|
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
15.000
|
$1,500.000
|
$2,600.000
|
$892.500
|
$1,000.000
|
$892.000
|
$1,540.000
|
|
|
|
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
|
LF
|
22.000
|
$1,600.000
|
$1,900.000
|
$997.500
|
$1,200.000
|
$997.000
|
$1,500.000
|
|
|
|
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
|
LF
|
14.000
|
$2,500.000
|
$3,000.000
|
$1,785.000
|
$2,000.000
|
$1,785.000
|
$2,475.000
|
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
1.000
|
$11,000.000
|
$16,500.000
|
$13,125.000
|
$10,000.000
|
$13,125.000
|
$15,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$35,000.000
|
$16,700.000
|
$17,325.000
|
$12,000.000
|
$17,325.000
|
$16,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$27,000.000
|
$18,000.000
|
$26,250.000
|
$18,000.000
|
$26,250.000
|
$21,500.000
|
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$42,500.000
|
$24,000.000
|
$30,450.000
|
$28,000.000
|
$30,450.000
|
$25,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
2.000
|
$50,000.000
|
$28,000.000
|
$44,100.000
|
$42,000.000
|
$44,100.000
|
$35,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=12 FT)
|
EA
|
1.000
|
$65,000.000
|
$48,000.000
|
$72,975.000
|
$85,000.000
|
$72,975.000
|
$60,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=13 FT)
|
EA
|
1.000
|
$24,000.000
|
$45,000.000
|
$75,600.000
|
$60,000.000
|
$75,600.000
|
$60,000.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
199.000
|
$1,000.000
|
$975.000
|
$945.000
|
$1,000.000
|
$945.000
|
$891.250
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$2,000.000
|
$1,400.000
|
$1,548.750
|
$1,500.000
|
$1,548.000
|
$1,525.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$3,800.000
|
$2,400.000
|
$2,310.000
|
$3,000.000
|
$2,310.000
|
$2,650.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,700.000
|
$4,500.000
|
$4,200.000
|
$4,700.000
|
$4,200.000
|
$5,500.000
|
|
|
|
PIPE (PVC) (SCH 40) (12 IN)
|
LF
|
104.000
|
$40.000
|
$55.000
|
$40.000
|
$40.000
|
$65.000
|
$25.000
|
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$80,000.000
|
$55,000.000
|
$131,250.000
|
$90,000.000
|
$140,000.000
|
$100,000.000
|
|
|
|
REMOV STR (PIPE)
|
EA
|
100.000
|
$500.000
|
$350.000
|
$315.000
|
$500.000
|
$315.000
|
$500.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,051,355.680
|
$1,250,000.000
|
$1,000,000.000
|
$1,200,000.000
|
$1,300,000.000
|
$1,200,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$6,000.000
|
$6,000.000
|
$2,630.000
|
$10,000.000
|
$13,000.000
|
$9,500.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
301.000
|
$100.000
|
$130.000
|
$200.000
|
$125.000
|
$408.000
|
$100.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
301.000
|
$150.000
|
$225.000
|
$250.000
|
$250.000
|
$275.000
|
$225.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
100.000
|
$100.000
|
$275.000
|
$50.000
|
$250.000
|
$275.000
|
$225.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
525.000
|
$55.000
|
$45.000
|
$39.900
|
$45.000
|
$40.000
|
$41.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
596.000
|
$75.000
|
$45.000
|
$52.500
|
$55.000
|
$52.000
|
$53.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,106.000
|
$18.000
|
$16.000
|
$12.600
|
$15.000
|
$13.000
|
$2.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
445.000
|
$40.000
|
$55.000
|
$29.400
|
$32.000
|
$20.000
|
$31.500
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
445.000
|
$12.000
|
$18.000
|
$10.500
|
$11.000
|
$5.000
|
$11.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,990.000
|
$5.000
|
$4.500
|
$4.200
|
$4.500
|
$4.200
|
$4.500
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,990.000
|
$1.700
|
$1.250
|
$0.530
|
$0.600
|
$0.550
|
$0.500
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
744.000
|
$10.000
|
$6.000
|
$6.300
|
$7.000
|
$6.300
|
$6.250
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
744.000
|
$2.000
|
$1.500
|
$1.050
|
$1.000
|
$1.050
|
$1.100
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,361.000
|
$135.000
|
$82.000
|
$133.370
|
$80.000
|
$125.000
|
$195.000
|
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
540.000
|
$60.000
|
$45.000
|
$151.480
|
$55.000
|
$100.000
|
$30.000
|
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
540.000
|
$28.000
|
$5.500
|
$65.090
|
$15.000
|
$50.000
|
$23.520
|
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
540.000
|
$25.000
|
$15.000
|
$18.180
|
$35.000
|
$100.000
|
$25.000
|
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,468.000
|
$60.000
|
$40.000
|
$38.550
|
$40.000
|
$42.000
|
$82.500
|
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
200.000
|
$115.000
|
$100.000
|
$183.750
|
$120.000
|
$185.000
|
$125.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
16,665.000
|
$45.000
|
$45.000
|
$45.100
|
$45.000
|
$42.000
|
$82.500
|
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
34,036.000
|
$0.330
|
$0.220
|
$0.160
|
$0.350
|
$0.340
|
$0.250
|
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
34,036.000
|
$0.250
|
$0.220
|
$0.180
|
$0.350
|
$0.340
|
$0.250
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
925.000
|
$30.000
|
$28.000
|
$27.300
|
$28.000
|
$27.000
|
$26.500
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,300.000
|
$2,075.000
|
$2,262.750
|
$2,200.000
|
$1,979.000
|
$1,900.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,260.000
|
$3.000
|
$3.000
|
$2.100
|
$2.750
|
$2.100
|
$4.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$3,400.000
|
$3,200.000
|
$3,013.500
|
$3,200.000
|
$3,015.000
|
$3,150.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,500.000
|
$3,300.000
|
$1,919.500
|
$3,300.000
|
$1,115.000
|
$3,200.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,300.000
|
$1,100.000
|
$1,468.500
|
$1,100.000
|
$1,115.000
|
$1,250.000
|
|
|
|
CCA (INSTL)(N)(TL3)(WORK ZONE)
|
EA
|
2.000
|
$7,500.000
|
$35,500.000
|
$8,206.000
|
$36,000.000
|
$35,000.000
|
$33,250.000
|
|
|
|
REMOVE AND INSTALL EXISTING GATE
|
EA
|
2.000
|
$2,000.000
|
$1,200.000
|
$2,500.000
|
$500.000
|
$2,760.000
|
$500.000
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
5.000
|
$670.000
|
$800.000
|
$874.500
|
$800.000
|
$619.000
|
$750.000
|
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
59.000
|
$340.000
|
$370.000
|
$368.500
|
$375.000
|
$231.000
|
$365.000
|
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
13.000
|
$370.000
|
$420.000
|
$401.500
|
$425.000
|
$263.000
|
$395.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
33.000
|
$900.000
|
$720.000
|
$830.500
|
$725.000
|
$725.000
|
$675.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$1,200.000
|
$990.000
|
$957.000
|
$1,000.000
|
$893.000
|
$915.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,100.000
|
$1,150.000
|
$1,083.500
|
$1,150.000
|
$1,040.000
|
$1,150.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
7.000
|
$130.000
|
$110.000
|
$143.000
|
$110.000
|
$105.000
|
$109.500
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
22.000
|
$70.000
|
$90.000
|
$115.500
|
$55.000
|
$79.000
|
$55.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
13.000
|
$110.000
|
$97.000
|
$137.500
|
$100.000
|
$79.000
|
$95.000
|
|
|
|
INSTL OM SM RD SIGN (1-OM-CON)Y
|
EA
|
4.000
|
$390.000
|
$145.000
|
$100.000
|
$150.000
|
$26.000
|
$135.000
|
|
|
|
INSTL OM SM RD SIGN (1-OM-CON)R
|
EA
|
7.000
|
$300.000
|
$28.000
|
$100.000
|
$130.000
|
$26.000
|
$120.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
32,028.000
|
$0.500
|
$0.400
|
$0.370
|
$0.380
|
$0.370
|
$0.400
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
48,134.000
|
$0.500
|
$0.400
|
$0.370
|
$0.380
|
$0.370
|
$0.400
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
310.000
|
$1.400
|
$5.500
|
$5.250
|
$5.500
|
$5.250
|
$7.250
|
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
620.000
|
$1.200
|
$5.500
|
$5.250
|
$5.500
|
$5.250
|
$7.250
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,073.000
|
$2.300
|
$2.000
|
$3.150
|
$2.000
|
$0.530
|
$2.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
4,369.000
|
$2.000
|
$2.000
|
$3.150
|
$2.000
|
$0.530
|
$2.000
|
|
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
90.000
|
$2.000
|
$3.300
|
$3.150
|
$3.300
|
$3.150
|
$3.200
|
|
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
162.000
|
$2.000
|
$3.000
|
$2.630
|
$2.750
|
$2.630
|
$2.550
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
877.000
|
$1.000
|
$1.750
|
$1.580
|
$1.650
|
$1.580
|
$1.750
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
151.000
|
$6.000
|
$8.000
|
$7.350
|
$7.700
|
$7.350
|
$7.250
|
|
|
|
PAVEMENT SLER 6"
|
LF
|
90.000
|
$2.000
|
$2.200
|
$2.100
|
$2.200
|
$2.100
|
$2.100
|
|
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
349.000
|
$1.000
|
$1.100
|
$1.050
|
$1.100
|
$1.050
|
$1.050
|
|
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
34,191.000
|
$0.500
|
$0.950
|
$0.890
|
$0.930
|
$0.890
|
$0.920
|
|
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
8,738.000
|
$0.500
|
$0.950
|
$0.890
|
$0.930
|
$0.890
|
$0.920
|
|
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
34,951.000
|
$0.500
|
$0.950
|
$0.890
|
$0.930
|
$0.890
|
$0.920
|
|
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
2.000
|
$225.000
|
$250.000
|
$236.250
|
$275.000
|
$236.000
|
$235.000
|
|
|
|
PREFAB PM TY C (W)(LN REDUCT ARROW)
|
EA
|
2.000
|
$400.000
|
$305.000
|
$288.750
|
$300.000
|
$289.000
|
$280.000
|
|
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
2.000
|
$240.000
|
$275.000
|
$262.500
|
$275.000
|
$263.000
|
$255.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
44.000
|
$4.500
|
$5.500
|
$5.250
|
$5.500
|
$5.250
|
$5.150
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,039.000
|
$6.000
|
$5.500
|
$5.250
|
$5.500
|
$5.250
|
$5.150
|
|
|
|
TRAFFIC BUTTON TY W
|
EA
|
62.000
|
$7.000
|
$5.500
|
$5.250
|
$5.500
|
$5.250
|
$5.150
|
|
|
|
TRAFFIC BUTTON TY Y
|
EA
|
62.000
|
$5.000
|
$5.500
|
$5.250
|
$5.500
|
$5.250
|
$5.150
|
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
22,208.000
|
$2.000
|
$0.500
|
$0.470
|
$0.500
|
$0.470
|
$0.470
|
|
|
|
ELIM EXT PM & MRKS (RUMBLE STRIP)
|
LF
|
47,663.000
|
$3.500
|
$0.600
|
$0.150
|
$0.500
|
$1.050
|
$1.000
|
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
90.000
|
$0.800
|
$2.200
|
$2.100
|
$2.200
|
$2.100
|
$0.500
|
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$5,800.000
|
$7,500.000
|
$3,500.000
|
$8,000.000
|
$6,500.000
|
$5,000.000
|
|
|
|
LITTER REMOVAL
|
CYC
|
3.000
|
$6,000.000
|
$4,500.000
|
$1,500.000
|
$3,600.000
|
$5,500.000
|
$500.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
4,068.000
|
$55.000
|
$50.000
|
$65.100
|
$62.000
|
$65.000
|
$76.250
|
|
1
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
98.000
|
$150.000
|
$67.000
|
$105.000
|
$90.000
|
$105.000
|
$106.500
|
|
1
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
50.000
|
$220.000
|
$130.000
|
$210.000
|
$130.000
|
$210.000
|
$249.000
|
|
1A
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
0.000
|
$220.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
1A
|
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
0.000
|
$55.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
1A
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
0.000
|
$150.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
1A
|
|
THERMOPLASTIC PIPE (PP) (30")
|
LF
|
0.000
|
$220.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
Totals: |
$13,420,245.060
|
$13,629,477.940
|
$14,133,501.823
|
$14,203,271.410
|
$14,349,366.060
|
$15,103,708.703
|