PREPARING ROW
|
STA
|
9.550
|
$8,000.000
|
$4,000.000
|
$7,400.000
|
$2,730.290
|
$18,500.000
|
$12,043.170
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
35.000
|
$150.000
|
$30.000
|
$150.000
|
$162.710
|
$125.000
|
$237.690
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
86.000
|
$8.000
|
$10.000
|
$0.010
|
$12.980
|
$13.500
|
$24.090
|
|
|
REMOVING STAB BASE & ASPH PAV (18")
|
SY
|
2,378.000
|
$10.000
|
$13.000
|
$0.010
|
$12.980
|
$14.250
|
$14.450
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
522.000
|
$40.000
|
$26.000
|
$10.000
|
$36.910
|
$125.000
|
$10.100
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
3,608.000
|
$15.000
|
$37.000
|
$31.500
|
$23.030
|
$35.000
|
$14.390
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
50.000
|
$50.000
|
$50.000
|
$75.000
|
$39.170
|
$45.000
|
$15.140
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C2)(DS)
|
CY
|
950.000
|
$50.000
|
$94.000
|
$168.000
|
$26.300
|
$35.000
|
$54.190
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
7,112.000
|
$2.000
|
$2.000
|
$2.000
|
$1.050
|
$3.000
|
$1.450
|
|
|
BLOCK SODDING
|
SY
|
7,112.000
|
$6.000
|
$3.500
|
$5.000
|
$3.840
|
$4.500
|
$5.540
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
7,112.000
|
$0.500
|
$0.260
|
$0.200
|
$0.300
|
$0.250
|
$0.350
|
|
|
VEGETATIVE WATERING
|
MG
|
1,058.000
|
$18.000
|
$48.000
|
$2.100
|
$53.100
|
$20.000
|
$48.170
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
|
SY
|
3,291.000
|
$20.000
|
$30.000
|
$50.000
|
$32.970
|
$22.500
|
$24.090
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
1,082.000
|
$275.000
|
$297.000
|
$0.010
|
$312.700
|
$0.010
|
$301.780
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
3,291.000
|
$9.000
|
$6.000
|
$16.000
|
$11.090
|
$6.500
|
$5.430
|
|
|
PRIME COAT (MS-2 OR SS-1)
|
GAL
|
658.000
|
$13.000
|
$7.000
|
$8.400
|
$7.430
|
$6.300
|
$9.630
|
|
|
ASPH (CRS-2P)
|
GAL
|
823.000
|
$12.000
|
$8.000
|
$6.130
|
$8.850
|
$7.500
|
$7.030
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
691.000
|
$17.000
|
$9.000
|
$6.970
|
$10.150
|
$8.600
|
$8.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
31.000
|
$600.000
|
$500.000
|
$344.400
|
$578.200
|
$490.000
|
$395.020
|
|
|
CEM STABIL BKFL
|
CY
|
103.000
|
$170.000
|
$200.000
|
$500.000
|
$195.960
|
$150.000
|
$151.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
776.000
|
$270.000
|
$186.000
|
$225.000
|
$234.950
|
$150.000
|
$417.930
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
54.500
|
$1,100.000
|
$800.000
|
$3,000.000
|
$1,525.150
|
$1,200.000
|
$2,130.880
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
48.200
|
$1,500.000
|
$970.000
|
$3,000.000
|
$1,917.490
|
$1,600.000
|
$1,912.530
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
14.700
|
$1,800.000
|
$1,500.000
|
$3,000.000
|
$2,985.390
|
$1,850.000
|
$2,348.880
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
8,970.000
|
$23.000
|
$19.000
|
$25.000
|
$42.200
|
$26.000
|
$65.630
|
|
|
APPROACH SLAB (HPC)
|
CY
|
113.000
|
$600.000
|
$650.000
|
$900.000
|
$744.440
|
$590.000
|
$2,272.950
|
|
|
PRESTR CONC BOX BEAM (5XB20)
|
LF
|
1,159.620
|
$325.000
|
$233.000
|
$300.000
|
$314.200
|
$350.000
|
$392.400
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
35.000
|
$600.000
|
$465.000
|
$900.000
|
$757.230
|
$650.000
|
$600.140
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,510.200
|
$150.000
|
$165.000
|
$175.000
|
$164.070
|
$10.000
|
$201.380
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
42.000
|
$580.000
|
$420.000
|
$1,000.000
|
$844.330
|
$675.000
|
$512.710
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
438.000
|
$150.000
|
$155.000
|
$200.000
|
$156.040
|
$150.000
|
$176.670
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
104.000
|
$150.000
|
$120.000
|
$200.000
|
$149.370
|
$140.000
|
$154.420
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
178.000
|
$900.000
|
$805.000
|
$750.000
|
$938.830
|
$650.000
|
$1,094.090
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
802.000
|
$85.000
|
$128.000
|
$85.000
|
$166.940
|
$1.000
|
$119.230
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
240.000
|
$175.000
|
$183.000
|
$150.000
|
$277.650
|
$1.000
|
$238.450
|
|
|
RC PIPE (CL III)(72 IN)
|
LF
|
240.000
|
$400.000
|
$502.000
|
$600.000
|
$673.470
|
$1.000
|
$880.910
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
2.000
|
$12,500.000
|
$10,500.000
|
$10,800.000
|
$13,393.000
|
$1.000
|
$12,579.060
|
|
|
HEADWALL (CH - PW - S) (DIA= 72 IN)
|
EA
|
2.000
|
$20,200.000
|
$16,500.000
|
$30,000.000
|
$29,895.300
|
$1.000
|
$20,538.540
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
2.000
|
$18,000.000
|
$20,000.000
|
$28,000.000
|
$36,603.600
|
$58,700.000
|
$22,753.270
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(6:1) (C)
|
EA
|
1.000
|
$25,000.000
|
$30,750.000
|
$40,000.000
|
$45,618.800
|
$167,054.000
|
$15,533.160
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,800.000
|
$2,100.000
|
$900.000
|
$2,146.430
|
$1,500.000
|
$2,291.090
|
|
|
REMOV STR (SET)
|
EA
|
8.000
|
$700.000
|
$1,000.000
|
$500.000
|
$1,146.270
|
$285.000
|
$444.210
|
|
|
REMOV STR (WINGWALL)
|
EA
|
3.000
|
$1,800.000
|
$5,000.000
|
$7,500.000
|
$1,668.850
|
$1,750.000
|
$1,781.080
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$1,500.000
|
$5,500.000
|
$5,000.000
|
$1,463.040
|
$2,350.000
|
$1,958.390
|
|
|
REMOV STR (PIPE)
|
LF
|
1,180.000
|
$21.000
|
$25.000
|
$10.000
|
$30.190
|
$13.500
|
$22.620
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
23.000
|
$100.000
|
$390.000
|
$500.000
|
$165.130
|
$72.000
|
$98.850
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$75,000.000
|
$60,000.000
|
$100,000.000
|
$48,067.190
|
$375,000.000
|
$53,200.690
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$345,521.450
|
$400,249.800
|
$333,000.000
|
$300,017.360
|
$450,000.000
|
$523,877.800
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$6,000.000
|
$10,000.000
|
$9,000.000
|
$3,341.850
|
$5,000.000
|
$14,451.800
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
57.000
|
$33.000
|
$30.000
|
$49.350
|
$28.910
|
$24.500
|
$48.800
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
20.000
|
$70.000
|
$70.000
|
$61.950
|
$68.440
|
$58.000
|
$77.800
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
77.000
|
$13.000
|
$10.000
|
$30.980
|
$9.440
|
$8.000
|
$26.780
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
346.000
|
$25.000
|
$35.000
|
$25.200
|
$29.500
|
$25.000
|
$28.950
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
346.000
|
$9.000
|
$8.000
|
$12.600
|
$8.260
|
$7.000
|
$9.130
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,314.000
|
$3.500
|
$3.000
|
$2.100
|
$2.710
|
$2.300
|
$3.700
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,314.000
|
$0.800
|
$0.550
|
$0.260
|
$0.530
|
$0.450
|
$0.880
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,187.000
|
$4.000
|
$7.000
|
$4.520
|
$5.840
|
$4.950
|
$6.830
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,187.000
|
$1.500
|
$1.000
|
$1.050
|
$1.000
|
$0.850
|
$1.640
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,859.000
|
$85.000
|
$119.000
|
$125.000
|
$53.330
|
$350.000
|
$82.320
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,160.000
|
$55.000
|
$58.000
|
$50.000
|
$51.760
|
$80.000
|
$78.890
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,160.000
|
$14.000
|
$8.000
|
$25.000
|
$21.070
|
$10.000
|
$17.320
|
|
|
DRIVEWAYS (ACP)
|
SY
|
457.000
|
$60.000
|
$105.000
|
$25.000
|
$37.640
|
$31.900
|
$51.970
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
1,392.000
|
$1.800
|
$3.500
|
$3.250
|
$3.540
|
$7.160
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
696.000
|
$0.850
|
$3.500
|
$3.250
|
$3.540
|
$7.160
|
$0.210
|
|
|
RIGHT OF WAY MARKERS
|
EA
|
4.000
|
$200.000
|
$200.000
|
$525.000
|
$383.500
|
$250.000
|
$167.600
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
200.000
|
$25.000
|
$21.000
|
$20.480
|
$23.010
|
$20.500
|
$29.050
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$2,000.000
|
$2,000.000
|
$2,647.620
|
$2,094.500
|
$1,925.000
|
$2,437.700
|
|
|
SHORT RADIUS
|
LF
|
83.000
|
$50.000
|
$40.000
|
$164.850
|
$24.780
|
$225.000
|
$80.070
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
50.000
|
$35.000
|
$23.000
|
$21.530
|
$24.190
|
$35.000
|
$37.100
|
|
|
TL-3 31" SHORT RADIUS (END ANCHOR)
|
EA
|
2.000
|
$1,000.000
|
$23,000.000
|
$2,100.000
|
$10,807.620
|
$18,500.000
|
$2,408.630
|
|
|
TL-3 31" SHORT RADIUS (TRANSITION)
|
EA
|
1.000
|
$1,500.000
|
$23,000.000
|
$3,150.000
|
$4,965.440
|
$9,000.000
|
$3,612.950
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
258.000
|
$3.500
|
$6.000
|
$2.100
|
$23.600
|
$2.000
|
$2.620
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,300.000
|
$3,000.000
|
$2,940.000
|
$3,304.000
|
$2,900.000
|
$3,651.130
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$265.000
|
$300.000
|
$262.500
|
$295.000
|
$225.000
|
$298.910
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,300.000
|
$900.000
|
$731.920
|
$3,087.850
|
$15.000
|
$1,208.730
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$9,200.000
|
$9,000.000
|
$11,500.220
|
$19,639.510
|
$22.000
|
$10,074.710
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$950.000
|
$1,400.000
|
$792.750
|
$890.900
|
$755.000
|
$909.260
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,100.000
|
$2,000.000
|
$1,102.500
|
$1,239.000
|
$1,050.000
|
$1,264.530
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$25.000
|
$140.000
|
$21.000
|
$88.500
|
$75.000
|
$90.320
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$30.000
|
$140.000
|
$26.250
|
$88.500
|
$75.000
|
$90.320
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
19.000
|
$6.000
|
$10.000
|
$12.600
|
$14.160
|
$12.000
|
$14.450
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,956.000
|
$1.250
|
$1.500
|
$1.170
|
$1.310
|
$1.110
|
$1.340
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,956.000
|
$1.600
|
$1.500
|
$1.170
|
$1.310
|
$1.110
|
$1.340
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
390.000
|
$0.750
|
$1.000
|
$0.740
|
$0.830
|
$0.700
|
$0.840
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
195.000
|
$1.000
|
$1.000
|
$0.740
|
$0.830
|
$0.700
|
$0.840
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
4,476.000
|
$0.750
|
$1.250
|
$0.970
|
$1.090
|
$0.920
|
$1.110
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
575.000
|
$0.750
|
$1.250
|
$1.050
|
$1.180
|
$1.000
|
$1.200
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
3,326.000
|
$0.750
|
$0.750
|
$0.970
|
$1.090
|
$0.920
|
$1.110
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
33.000
|
$6.000
|
$7.000
|
$12.600
|
$14.160
|
$12.000
|
$14.450
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
856.000
|
$1.000
|
$2.000
|
$1.260
|
$1.420
|
$1.200
|
$1.450
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
585.000
|
$0.650
|
$1.000
|
$0.630
|
$0.710
|
$0.600
|
$0.720
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$3,100.000
|
$2,250.000
|
$2,100.000
|
$3,068.000
|
$250.000
|
$5,019.070
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
543.000
|
$180.000
|
$145.000
|
$151.000
|
$162.960
|
$138.100
|
$153.550
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,900.000
|
$35,000.000
|
$10,000.000
|
$11,800.000
|
$12,000.000
|
$12,798.300
|
|
|
TMA (STATIONARY)
|
DAY
|
5.000
|
$225.000
|
$300.000
|
$250.000
|
$466.100
|
$650.000
|
$526.770
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
5.000
|
$200.000
|
$750.000
|
$525.000
|
$938.100
|
$650.000
|
$945.510
|
|
Totals: |
$3,836,735.950
|
$4,090,390.330
|
$4,278,934.320
|
$4,303,712.804
|
$4,574,110.960
|
$5,321,608.370
|