ROCKWALL SH 66 (0009-04-074)

Items: 121

County: ROCKWALL
Length: N/A
Highway: SH 66
District: DALLAS
Control Number: 0009-04-074
DBE Goal: N/A
Project: STP 2B23(089)HES
Guaranty: N/A
Time: 202 WORKING DAYS
Engineer's Estimate: $2,727,369.18
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
LANE SELMAN
NICHOLAS WADLINGTON
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$2,727,369.18
$4,078,127.00
Over/Under Est: 49.53% $1,350,757.82
Over/Under Est: 68.33% $1,863,581.02
Amt Left: 12.57% $512,823.20
Subcontractor Percentage Amount
TEXAS SELECT EROSION, LLC 5.47% $224,134.73
ALPHA PAVING INDUSTRIES LLC 3.66% $149,969.49
LINEAR TRAFFIC MARKINGS LLC 1.71% $70,067.71
FIBERTEL, LLC 1.10% $45,072.80
A&A LANDSCAPE, LLC 0.73% $29,911.95
CDM HOLDINGS, LLC 0.37% $15,160.85
BLUE ROCK DRILLING, LLC 0.24% $9,834.06
AAA DRILLING FOUNDATION COMPANY, INC. 0.20% $8,195.05
AWP SAFETY 0.07% $2,868.27
TEXOP CONSTRUCTION 0.00% $0.00
Total: 13.55% $555,214.91

Bid Items & Bid Tabulations

121 Total 0 of 121
ROCKWALL  |  SH 66  |  DALLAS  |  0009-04-074  |  08/03/2023  |  $2,727,369.18  |  STP 2B23(089)HES  |  HWY IMPRV  |  202 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNH CONSTRUCTION, LLC
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 40.500 $1,500.000 $7,400.000 $4,935.330
REMOVING CONC (PAV)
SY 35.000 $25.000 $20.000 $58.000
REMOVING CONC (RIPRAP)
SY 165.000 $25.000 $20.000 $36.910
REMOVING CONC (DRIVEWAYS)
SY 1,044.000 $25.000 $20.000 $31.110
REMOVING STAB BASE & ASPH PAV (0-6")
SY 410.000 $10.000 $20.000 $29.800
REMOVING STAB BASE & ASPH PAV(12"-27")
SY 1,210.000 $25.000 $50.000 $29.800
EXCAVATION (ROADWAY)
CY 41.300 $30.000 $20.000 $107.770
SUBGRADE WIDENING (ORD COMP)
STA 40.200 $250.000 $450.000 $1,126.100
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 740.800 $30.000 $50.000 $116.890
BACKFILL (TY A OR B)
STA 42.500 $200.000 $450.000 $468.070
ROAD GRADER WORK (ORD COMP)
STA 42.500 $150.000 $450.000 $1,900.210
FURNISHING AND PLACING TOPSOIL (4")
SY 18,110.000 $1.500 $7.000 $4.460
BLOCK SODDING
SY 18,110.000 $3.000 $7.000 $4.500
DRILL SEED (TEMP)(WARM OR COOL)
SY 18,110.000 $0.200 $0.500 $0.280
VEGETATIVE WATERING
MG 5,391.000 $5.000 $10.000 $2.100
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 5,945.000 $25.000 $25.000 $84.830
PRIME COAT(MC-30 OR AE-P)
GAL 1,198.000 $7.000 $6.000 $11.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,339.000 $70.000 $65.000 $73.500
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 13,385.000 $2.000 $6.000 $2.500
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 85.000 $280.000 $450.000 $377.700
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 39.000 $350.000 $550.000 $473.350
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 22.000 $700.000 $700.000 $645.850
CL C CONC (RAIL FOUNDATION)(HPC)
CY 37.000 $700.000 $1,850.000 $1,626.760
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 13.000 $550.000 $650.000 $976.650
RIPRAP (MOW STRIP)(4 IN)
CY 17.000 $600.000 $550.000 $1,058.800
RAIL (TY T66)
LF 205.000 $200.000 $185.000 $469.620
RC PIPE (CL III)(18 IN)
LF 570.000 $60.000 $95.000 $153.210
RC PIPE (CL III)(24 IN)
LF 316.000 $75.000 $150.000 $161.800
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 28.000 $1,100.000 $1,850.000 $1,201.150
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 10.000 $1,600.000 $2,500.000 $1,980.970
CLEAN EXIST CULVERTS
EA 1.000 $2,500.000 $1,500.000 $10,318.040
REMOV STR (SET)
EA 38.000 $300.000 $500.000 $527.400
REMOV STR (PIPE)
EA 19.000 $500.000 $500.000 $36.590
MOBILIZATION
LS 1.000 $234,285.380 $400,000.000 $451,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $12,000.000 $8,500.000 $31,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 95.000 $45.000 $30.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 95.000 $15.000 $15.000 $30.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,229.000 $25.000 $40.000 $24.000
CONSTRUCTION EXITS (REMOVE)
SY 1,229.000 $10.000 $20.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,660.000 $4.000 $4.000 $1.950
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,660.000 $1.000 $2.000 $0.400
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 919.000 $7.000 $18.000 $3.750
BIODEG EROSN CONT LOGS (REMOVE)
LF 919.000 $1.200 $9.000 $1.000
DRIVEWAYS (ACP)
SY 410.000 $75.000 $50.000 $88.020
DRIVEWAYS (CONC) (HES)
SY 1,044.000 $150.000 $105.000 $188.440
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 7,190.000 $0.200 $1.000 $1.250
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $35.000 $35.000 $26.500
REMOVE METAL BEAM GUARD FENCE
LF 75.000 $10.000 $500.000 $3.500
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,250.000 $2,975.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $400.000 $1,500.000 $350.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 2.000 $22,000.000 $30,000.000 $32,466.670
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 11.000 $300.000 $850.000 $250.000
CONDT (PVC) (SCH 40) (2")
LF 348.000 $18.000 $25.000 $19.570
CONDT (PVC) (SCH 40) (2") (BORE)
LF 56.000 $45.000 $35.000 $33.780
CONDT (PVC) (SCH 40) (3")
LF 280.000 $25.000 $30.000 $22.400
CONDT (PVC) (SCH 40) (3") (BORE)
LF 921.000 $50.000 $50.000 $37.930
CONDT (PVC) (SCH 80) (2")
LF 103.000 $35.000 $30.000 $21.300
ELEC CONDR (NO.12) INSULATED
LF 800.000 $2.250 $3.000 $2.010
ELEC CONDR (NO.8) INSULATED
LF 3,030.000 $2.300 $3.000 $2.500
ELEC CONDR (NO.6) BARE
LF 1,511.000 $4.000 $4.000 $2.640
ELEC CONDR (NO.6) INSULATED
LF 810.000 $4.000 $4.000 $2.920
TRAY CABLE (3 CONDR) (12 AWG)
LF 1,762.000 $3.500 $4.000 $3.340
GROUND BOX TY A (122311)W/APRON
EA 2.000 $1,400.000 $2,000.000 $1,656.200
GROUND BOX TY C (162911)W/APRON
EA 12.000 $1,200.000 $2,000.000 $1,777.500
GROUND BOX TY D (162922)W/APRON
EA 2.000 $2,200.000 $2,000.000 $1,826.500
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 3.000 $11,000.000 $10,000.000 $9,612.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 11.000 $750.000 $1,500.000 $650.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,100.000 $1,500.000 $1,075.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 3.000 $1,500.000 $1,500.000 $1,295.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $25.000 $100.000 $18.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $30.000 $100.000 $25.500
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 4.000 $150.000 $100.000 $55.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 80.000 $5.000 $6.000 $8.040
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 975.000 $1.400 $6.000 $8.040
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 620.000 $1.050 $3.000 $1.460
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 230.000 $8.000 $10.000 $7.450
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 7.000 $130.000 $250.000 $150.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 7.000 $150.000 $250.000 $150.000
REFL PAV MRK TY II (W) 6" (SLD)
LF 14,440.000 $0.400 $1.250 $0.550
REFL PAV MRK TY II (Y) 6" (SLD)
LF 20,180.000 $0.400 $1.250 $0.550
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 7,220.000 $0.950 $1.500 $0.790
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 10,090.000 $1.050 $1.500 $0.790
REFL PAV MRKR TY I-C
EA 32.000 $5.000 $11.000 $5.500
REFL PAV MRKR TY II-A-A
EA 523.000 $4.500 $6.000 $5.500
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $150.000 $250.000 $75.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 1.000 $150.000 $250.000 $75.000
INSTALL HWY TRF SIG (ISOLATED)
EA 3.000 $26,000.000 $50,000.000 $71,122.770
VEH SIG SEC (12")LED(GRN)
EA 22.000 $400.000 $450.000 $438.600
VEH SIG SEC (12")LED(GRN ARW)
EA 10.000 $300.000 $450.000 $438.600
VEH SIG SEC (12")LED(YEL)
EA 22.000 $350.000 $450.000 $438.600
VEH SIG SEC (12")LED(YEL ARW)
EA 10.000 $325.000 $450.000 $438.600
VEH SIG SEC (12")LED(RED)
EA 22.000 $350.000 $450.000 $438.600
VEH SIG SEC (12")LED(RED ARW)
EA 10.000 $320.000 $450.000 $438.600
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 17.000 $210.000 $200.000 $298.600
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 5.000 $210.000 $250.000 $340.600
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 5.000 $210.000 $250.000 $396.600
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 767.000 $3.000 $4.000 $2.920
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 230.000 $5.500 $4.500 $3.970
TRF SIG CBL (TY A)(14 AWG)(12 CONDR)
LF 573.000 $6.000 $5.000 $4.740
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
LF 815.000 $10.000 $6.000 $5.300
INS TRF SIG PL AM(S)1 ARM(20')LUM&ILSN
EA 1.000 $9,000.000 $18,500.000 $14,970.200
INS TRF SIG PL AM(S)1 ARM(24')LUM&ILSN
EA 1.000 $10,200.000 $24,000.000 $14,970.200
INS TRF SIG PL AM(S)1 ARM(28')LUM
EA 1.000 $10,000.000 $20,000.000 $13,411.600
INS TRF SIG PL AM(S)1 ARM(28')LUM&ILSN
EA 2.000 $12,000.000 $25,000.000 $14,970.200
INS TRF SIG PL AM(S)1 ARM(32')
EA 1.000 $13,000.000 $18,500.000 $11,661.600
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 1.000 $14,000.000 $20,000.000 $14,620.200
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 1.000 $15,000.000 $23,000.000 $15,670.200
INS TRF SIG PL AM(S)1 ARM(36')LUM&ILSN
EA 1.000 $15,000.000 $26,500.000 $17,578.800
INS TRF SIG PL AM(S)1 ARM(44')LUM&ILSN
EA 1.000 $17,000.000 $28,000.000 $18,787.400
INS TRF SIG PL AM(S)1 ARM(60')LUM&ILSN
EA 1.000 $20,000.000 $42,500.000 $48,663.200
FULL - WIDTH MOWING
CYC 3.000 $6,000.000 $5,000.000 $3,150.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 150.000 $20.000 $20.000 $94.680
SP MIXES SP-B PG64-22
TON 1,135.000 $140.000 $160.000 $174.300
SP MIXES SP-C SAC-B PG70-22
TON 1,933.000 $145.000 $180.000 $150.400
TACK COAT
GAL 1,740.000 $4.000 $6.000 $1.010
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $15,000.000 $16,500.000 $20,000.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 3.000 $9,000.000 $12,500.000 $12,552.000
TMA (STATIONARY)
DAY 202.000 $200.000 $250.000 $157.500
TMA (MOBILE OPERATION)
DAY 40.000 $220.000 $550.000 $784.000
RVDS(PRESENCE DETECTION ONLY)
EA 4.000 $9,000.000 $12,500.000 $17,222.000
RVDS(PRESENCE AND ADVANCE DET)
EA 7.000 $9,500.000 $15,000.000 $17,222.000
Totals: $2,727,369.180 $4,078,127.000 $4,590,950.218