REFUGIO SH 202 (0447-04-018)

Items: 62

County: REFUGIO
Length: N/A
Highway: SH 202
District: CORPUS CHRISTI
Control Number: 0447-04-018
DBE Goal: 600.0%
Project: F 2B24(083)
Guaranty: N/A
Time: 297 WORKING DAYS
Engineer's Estimate: $6,531,817.77
Date: 05/03/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
ROBERT ISASSI
CHANDLER WILLIAMS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$6,531,817.77
$7,586,856.63
Over/Under Est: 16.15% $1,055,038.86
Subcontractor Percentage Amount
M & D FOUNDATION DRILLING INDUSTRIES, INC. 11.97% $924,915.85
ZENITH SITE SERVICES 6.61% $510,751.36
J. R. (JOE) RAMON & SONS, INC. 3.64% $281,260.96
AARON CONCRETE CONTRACTORS, LLC 2.41% $186,219.48
TORO BRAVO CONSTRUCTION, LLC 1.56% $120,540.41
MOTES CONSTRUCTION, LLC 1.03% $79,587.58
SYLVA CONSTRUCTION, LLC 0.99% $76,496.80
LONE STAR EROSION CONTROL 0.91% $70,315.24
H J HENKE, LLC 0.88% $67,997.15
GREGORY PILE DRIVING, INC. 0.52% $40,180.14
HIGHWAY BARRICADES AND SERVICES, LLC 0.21% $16,226.59
FRANK JR REINFORCEMENT LLC 0.10% $7,726.95
SOUTH TEXAS TRAFFIC ALLIANCE INC. 0.08% $6,181.56
HIGHWAY INFRASTRUCTURE SAFETY SERVICES, INC. 0.06% $4,636.17
TORO BRAVO CONSTRUCTION, LLC 0.00% $0.00
ROYAL REBAR INC 0.00% $0.00
Total: 30.97% $2,393,036.24

Bid Items & Bid Tabulations

62 Total 0 of 62
REFUGIO  |  SH 202  |  CORPUS CHRISTI  |  0447-04-018  |  05/03/2024  |  $6,531,817.77  |  F 2B24(083)  |  BRIDGE REPL  |  297 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
E-Z BEL CONSTRUCTION, LLC
PREPARING ROW
STA 14.250 $2,000.000 $7,350.000
EXCAVATION (ROADWAY)
CY 983.000 $15.000 $22.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 6,212.000 $25.000 $28.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 6,629.000 $0.250 $1.000
VEGETATIVE WATERING
MG 75.000 $50.000 $77.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 1,620.000 $115.000 $125.000
LIME (HYDRATED LIME (SLURRY))
TON 97.000 $320.000 $449.000
LIME TRT (SUBGRADE)(8")
SY 4,165.000 $18.000 $7.000
PRIME COAT (MC-30)
GAL 770.000 $6.000 $11.000
ASPH (MULTI OPTION)
GAL 1,500.000 $4.000 $7.000
AGGR(TY-PB GR-3 SAC-B)
CY 46.000 $250.000 $561.000
AGGR(TY-PB GR-4 SAC-B)
CY 34.000 $200.000 $705.000
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 1,230.000 $4.000 $8.000
CEM STABIL BKFL
CY 153.000 $215.000 $353.000
TEMPORARY SPL SHORING
SF 961.000 $30.000 $108.750
DRILL SHAFT (36 IN)
LF 4,020.000 $300.000 $260.000
CL C CONC (ABUT)
CY 63.800 $1,250.000 $2,170.000
CL C CONC (CAP)
CY 199.700 $1,700.000 $2,227.000
CL C CONC (COLUMN)
CY 216.800 $1,400.000 $1,138.000
REINF CONC SLAB
SF 42,050.000 $25.000 $28.000
APPROACH SLAB
CY 89.900 $850.000 $1,266.000
PRESTR CONC GIRDER (TX28)
LF 3,127.680 $190.000 $260.000
PRESTR CONC GIRDER (TX54)
LF 3,361.500 $190.000 $300.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 785.000 $200.000 $350.000
RIPRAP (MOW STRIP)(4 IN)
CY 16.000 $575.000 $1,110.000
RAIL (TY T223)
LF 1,498.000 $160.000 $134.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 230.000 $160.000 $313.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $250,000.000 $281,000.000
MOBILIZATION
LS 1.000 $593,801.620 $530,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,500.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 172.000 $50.000 $49.000
ROCK FILTER DAMS (REMOVE)
LF 172.000 $25.000 $14.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,644.000 $5.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,644.000 $1.500 $2.000
CONSTRUCTING DETOURS
SY 625.000 $90.000 $45.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,090.000 $55.000 $80.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 970.000 $15.000 $13.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,090.000 $19.000 $18.000
MTL W-BEAM GD FEN (TIM POST)
LF 175.000 $30.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $1,330.000
REMOVE METAL BEAM GUARD FENCE
LF 952.000 $5.000 $4.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $2,379.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $250.000 $116.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,300.000 $751.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,250.000 $452.000
CRASH CUSH ATTEN (INSTL) (S) (TL3)
EA 2.000 $2,000.000 $7,891.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $1,000.000 $900.000
REMOVE SM RD SN SUP&AM
EA 4.000 $95.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 18.000 $25.000 $45.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 4.000 $30.000 $18.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 4.000 $70.000 $45.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 970.000 $1.000 $1.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $10.000 $1.000
PAVEMENT SEALER 6"
LF 2,900.000 $0.500 $1.000
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 2,848.000 $1.250 $2.000
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 2,848.000 $1.000 $2.000
REFL PAV MRKR TY II-A-A
EA 36.000 $6.000 $10.000
PAV SURF PREP FOR MRK (6")
LF 5,697.000 $0.100 $0.040
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,500.000 $17,064.000
PORTABLE TRAFFIC SIGNAL
MO 6.000 $5,500.000 $6,162.000
TMA (STATIONARY)
DAY 2.000 $9,000.000 $450.000
TMA (MOBILE OPERATION)
HR 32.000 $75.000 $71.000
Totals: $6,531,817.770 $7,586,856.630