REEVES FM 3334 (2370-01-009)

Items: 83

County: REEVES
Length: 0.0000 MILES
Highway: FM 3334
District: ODESSA
Control Number: 2370-01-009
DBE Goal: 0.0%
Project: C 2370-1-9
Guaranty: $100,000.00
Time: 242 WORKING DAYS
Engineer's Estimate: $6,906,220.22
Date: 1:00 PM JULY 01, 2026 (in 21 days)
Contract Number: 7263041
Type: HIGHWAY IMPROVEMENT
Project ID: A00128943
Project Description: ROADWAY REHABILITATION
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ODA-PRELETTINGQUESTIONS
REEVES FM 3334 (2370-01-009)
Project Name: N/A
Project: C 2370-1-9
Length: 0.0000 MILES
Project Type: CONSTRUCTION
Limits From: FM 2903
Limits To: SH 17
Project Description: ROADWAY REHABILITATION
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

83 Total 0 of 83
REEVES  |  FM 3334  |  ODESSA  |  2370-01-009  |  1:00 PM JULY 01, 2026  |  $6,906,220.22  |  C 2370-1-9  |  HWY IMPRV  |  242 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
REMOV CONC (RIPRAP)
SY 92.000
REMOV CONC (DRIVEWAYS)
SY 130.000
REMOV CONC (FLUME)
SY 962.000
EXCAV (ROADWAY)
CY 9,126.000
SUBGR WIDEN (OC)
STA 404.600
EMBANK (FNL)(OC)(TY B)
CY 17,829.000
BLADING
HR 70.000
BROADCAST SEED (TEMP_WARM_COOL)
SY 86,671.000
PROOF ROLLING
HR 70.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 91,141.000
PRIME COAT (MC-30)
GAL 18,235.000
ASPH (AC-20-5TR)
GAL 69,266.000
AGGR (TY-PB, GR-4)(SAC-A)
CY 1,521.000
TACK COAT
GAL 15,957.000
TOM-C PG76-22 SAC-A
TON 11,572.000
CEM STABIL BKFL
CY 131.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 136.000
RIPRAP (CONC)(5 IN)
CY 7.000
CONC BOX CULV (6 FT X 2 FT)
LF 64.000
RC PIPE (CL III)(12 IN)
LF 40.000
SET (TY I)(S= 6 FT)(HW= 2 FT)(6:1)(C)
EA 2.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 2.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 3.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 7.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 12.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 15.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 6.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 8.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000
SET (TY II)(18 IN)(RCP)(3:1)(P)
EA 1.000
SET(TY II)(24 IN)(RCP)(3:1)(P)
EA 1.000
CLEAN EXIST CULVERTS
EA 9.000
REMOV STR (HEADWALL)
EA 33.000
REMOV STR (PIPE)
LF 41.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000
TMA (STATIONARY)
DAY 205.000
TMA (MOBILE OPERATION)
DAY 52.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 54.000
ROCK FILTER DAMS (REMOVE)
LF 54.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,413.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,413.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 2.000
INTERSECTIONS (ACP)
SY 623.000
DRIVEWAYS (ACP)
SY 3,158.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 80,731.000
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 24,257.000
IN RD IL (TY SA) 40T-12 (250W EQ) LED
EA 17.000
CONDT (PVC) (SCH 40) (2")
LF 3,390.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 393.000
ELEC CONDR (NO.8) BARE
LF 3,908.000
ELEC CONDR (NO.8) INSULATED
LF 7,816.000
GROUND BOX TY A (122311)W/APRON
EA 6.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 2.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 15.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 14.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000
REMOVE SM RD SN SUP&AM
EA 27.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 22.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 185,800.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 161,800.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 75.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,952.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 80,731.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 8,984.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 15,408.000
PREFAB PM TY C (W)(24")(SLD)
LF 24.000
PREFAB PM TY C (W)(ARROW)
EA 6.000
PREFAB PM TY C (W)(WORD)
EA 5.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 8.000
REFL PAV MRKR TY I-C
EA 104.000
REFL PAV MRKR TY II-A-A
EA 644.000
BONDING COURSE
GAL 39,885.000
1
RC PIPE (CL III)(18 IN)
LF 34.000
1A
THERMOPLASTIC PIPE (PP) (18")
LF 34.000
2
RC PIPE (CL III)(24 IN)
LF 672.000
2A
THERMOPLASTIC PIPE (PP) (24")
LF 672.000
3
RC PIPE (CL III)(30 IN)
LF 236.000
3A
THERMOPLASTIC PIPE (PP) (30")
LF 236.000
4
RC PIPE (CL III)(36 IN)
LF 20.000
4A
THERMOPLASTIC PIPE (PP) (36")
LF 20.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
Total: $75,000.00