REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
3,669.000
|
$4.500
|
$10.790
|
$1.890
|
$6.730
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
932.000
|
$10.000
|
$23.800
|
$34.040
|
$17.950
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY A)
|
CY
|
668.000
|
$35.000
|
$85.180
|
$31.760
|
$65.880
|
|
|
BACKFILL (TY A OR B)
|
STA
|
580.000
|
$160.000
|
$273.390
|
$232.140
|
$431.900
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
15.900
|
$980.000
|
$982.230
|
$1,012.630
|
$1,210.060
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
4.000
|
$513.000
|
$853.510
|
$879.930
|
$921.650
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
5.300
|
$423.000
|
$853.510
|
$879.930
|
$921.650
|
|
|
PRIME COAT (MC-30)
|
GAL
|
12,887.000
|
$5.000
|
$4.360
|
$4.660
|
$3.910
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
30,315.000
|
$3.220
|
$4.870
|
$4.160
|
$3.530
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
122,310.000
|
$4.250
|
$3.470
|
$3.890
|
$3.840
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
3,178.000
|
$100.000
|
$151.270
|
$100.720
|
$156.630
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
|
TON
|
39,490.000
|
$100.000
|
$99.230
|
$103.300
|
$108.320
|
|
|
SUPERPAVE MIXTURES SP-B SAC-B PG64-22
|
TON
|
64,888.000
|
$100.000
|
$94.060
|
$95.630
|
$114.470
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
64,435.000
|
$1.610
|
$1.310
|
$2.170
|
$1.810
|
|
|
CONC PVMT (CONT REINF-CRCP) (HES)(12")
|
SY
|
2,096.000
|
$125.000
|
$245.030
|
$252.610
|
$286.170
|
|
|
CL A CONC (COLLAR)
|
EA
|
4.000
|
$1,250.000
|
$1,650.000
|
$567.020
|
$1,187.810
|
|
|
CL C CONC (RAC-R)
|
CY
|
46.000
|
$1,487.500
|
$1,320.000
|
$2,398.030
|
$1,781.720
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
43.200
|
$470.000
|
$715.000
|
$737.130
|
$772.080
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
11.120
|
$700.000
|
$880.000
|
$737.130
|
$950.250
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
326.500
|
$185.000
|
$165.000
|
$180.670
|
$510.760
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
6.000
|
$126.000
|
$550.000
|
$567.020
|
$593.910
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
8.000
|
$105.000
|
$550.000
|
$567.020
|
$593.910
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
4.000
|
$6,352.500
|
$8,250.000
|
$8,505.340
|
$8,908.590
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
10.000
|
$6,352.500
|
$9,900.000
|
$10,206.410
|
$10,690.300
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$7,250.000
|
$12,100.000
|
$12,474.500
|
$13,065.930
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
4.000
|
$7,500.000
|
$13,750.000
|
$14,175.570
|
$14,847.640
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$6,250.000
|
$15,950.000
|
$16,443.660
|
$17,223.270
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
6.000
|
$9,850.000
|
$17,600.000
|
$18,144.720
|
$19,004.980
|
|
|
SET (TY II) (36 IN) (CMP) (3: 1) (C)
|
EA
|
2.000
|
$2,350.000
|
$4,950.000
|
$5,103.210
|
$5,345.150
|
|
|
SET (TY II) (DES 3) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$1,850.000
|
$3,300.000
|
$3,402.140
|
$3,563.430
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
18.000
|
$2,600.000
|
$3,300.000
|
$3,402.140
|
$3,563.430
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$987,000.000
|
$707,304.520
|
$1,384,168.680
|
$1,984,922.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$25,000.000
|
$30,873.310
|
$8,216.580
|
$40,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
223.000
|
$25.000
|
$25.710
|
$65.020
|
$60.930
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
223.000
|
$10.000
|
$19.740
|
$19.480
|
$15.260
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
504.000
|
$10.000
|
$7.440
|
$5.000
|
$5.240
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
504.000
|
$3.000
|
$1.810
|
$0.700
|
$0.740
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,255.000
|
$14.000
|
$19.170
|
$25.990
|
$37.640
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
2.000
|
$5,000.000
|
$7,215.950
|
$9,869.940
|
$11,224.870
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
100.000
|
$200.000
|
$116.600
|
$120.210
|
$125.910
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
400.000
|
$25.000
|
$19.250
|
$19.850
|
$20.790
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
100.000
|
$12.500
|
$27.500
|
$28.350
|
$29.700
|
|
|
DRIVEWAYS (CONC)
|
SY
|
177.000
|
$85.000
|
$181.500
|
$187.120
|
$213.870
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
4,831.000
|
$40.000
|
$43.040
|
$33.270
|
$15.010
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
116,098.000
|
$0.160
|
$0.150
|
$0.180
|
$0.210
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
58,049.000
|
$0.220
|
$0.220
|
$0.260
|
$0.360
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
7,200.000
|
$24.000
|
$31.350
|
$32.320
|
$34.270
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
16.000
|
$2,000.000
|
$2,398.000
|
$2,472.220
|
$2,589.430
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
6.000
|
$1,150.000
|
$1,402.500
|
$1,445.910
|
$1,514.460
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
38.000
|
$3,575.000
|
$3,300.000
|
$3,402.140
|
$3,563.430
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
14.000
|
$1,750.000
|
$2,750.000
|
$2,835.110
|
$2,969.530
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$1,100.000
|
$1,134.050
|
$1,187.810
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$11,000.000
|
$11,340.450
|
$13,362.880
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
19.000
|
$645.000
|
$643.500
|
$663.420
|
$757.380
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
21.000
|
$695.000
|
$797.500
|
$822.180
|
$974.290
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$825.000
|
$803.000
|
$827.850
|
$867.100
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$825.000
|
$1,017.500
|
$1,048.990
|
$1,098.730
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,050.000
|
$1,061.500
|
$1,094.350
|
$1,146.240
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$600.000
|
$654.500
|
$674.760
|
$706.750
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
2.000
|
$700.000
|
$761.200
|
$784.760
|
$821.970
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
46.000
|
$120.000
|
$55.000
|
$73.130
|
$148.510
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
81.000
|
$96.000
|
$60.500
|
$62.370
|
$80.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
24.000
|
$25.000
|
$22.000
|
$22.680
|
$23.760
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
19.000
|
$105.000
|
$62.700
|
$64.640
|
$67.710
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
136.000
|
$50.000
|
$38.500
|
$39.690
|
$41.570
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
258,440.000
|
$0.250
|
$0.240
|
$0.250
|
$0.260
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
27,760.000
|
$0.250
|
$0.240
|
$0.250
|
$0.260
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
90,460.000
|
$0.250
|
$0.240
|
$0.250
|
$0.260
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
408.000
|
$3.850
|
$4.510
|
$4.650
|
$4.870
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
1,725.000
|
$1.000
|
$0.940
|
$0.960
|
$1.010
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
48.000
|
$8.750
|
$13.750
|
$14.180
|
$14.850
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
16,879.000
|
$1.000
|
$0.940
|
$0.960
|
$1.010
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
25,704.000
|
$1.500
|
$2.260
|
$1.860
|
$2.380
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
108.000
|
$11.000
|
$24.230
|
$24.980
|
$26.170
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
129,220.000
|
$0.310
|
$0.440
|
$0.450
|
$0.480
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
13,880.000
|
$0.340
|
$0.440
|
$0.450
|
$0.480
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
45,230.000
|
$0.350
|
$0.440
|
$0.450
|
$0.480
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$275.000
|
$385.000
|
$396.920
|
$415.730
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
1.000
|
$385.000
|
$715.000
|
$737.130
|
$772.080
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$310.000
|
$550.000
|
$567.030
|
$593.910
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
2.000
|
$750.000
|
$1,045.000
|
$1,077.350
|
$1,128.420
|
|
REFL PAV MRKR TY I-C
|
EA
|
17.000
|
$5.000
|
$3.300
|
$3.400
|
$3.560
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,353.000
|
$5.000
|
$3.300
|
$3.400
|
$3.560
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,770.000
|
$0.950
|
$1.010
|
$1.040
|
$1.090
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$7,000.000
|
$11,489.430
|
$7,620.790
|
$16,101.470
|
|
|
LITTER REMOVAL
|
CYC
|
2.000
|
$5,400.000
|
$17,623.770
|
$6,651.180
|
$12,130.360
|
|
|
CEMENT
|
TON
|
946.000
|
$152.500
|
$241.670
|
$220.070
|
$174.980
|
|
|
ASPHALT BINDER (PG64-22)
|
TON
|
2,267.000
|
$425.000
|
$631.440
|
$656.190
|
$652.360
|
|
|
FOAMED ASPHALT TREAT (7") (DC)
|
SY
|
285,015.000
|
$3.000
|
$3.830
|
$3.910
|
$2.160
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
792.000
|
$125.000
|
$94.040
|
$59.780
|
$29.460
|
|
|
TMA (STATIONARY)
|
DAY
|
374.000
|
$250.000
|
$374.990
|
$220.250
|
$243.670
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$200.000
|
$484.710
|
$806.820
|
$75.200
|
|
Totals: |
$16,879,597.710
|
$17,898,104.160
|
$18,448,993.043
|
$20,771,066.435
|