RANDALL US 87 (0067-01-087)

Items: 135

County: RANDALL
Length: N/A
Highway: US 87
District: AMARILLO
Control Number: 0067-01-087
DBE Goal: 500.0%
Project: F 2024(460)
Guaranty: N/A
Time: 167 WORKING DAYS
Engineer's Estimate: $8,011,274.05
Date: 12/05/2023 (2 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
JOE CHAPPELL
CC SYSOMBATH
KENNETH PETR
LADENIA JEWITT
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$8,011,274.05
$9,542,615.34
Over/Under Est: 19.11% $1,531,341.29
$10,257,567.05
Over/Under Est: 28.04% $2,246,293.00
Amt Left: 7.49% $714,951.71
$11,240,331.82
Over/Under Est: 40.31% $3,229,057.77
Amt Left: 17.79% $1,697,716.48
Delta: -9.58% -$982,764.77
$13,970,181.05
Over/Under Est: 74.38% $5,958,907.00
Amt Left: 46.4% $4,427,565.71
Delta: -24.29% -$2,729,849.23
Subcontractor Percentage Amount
DUININCK, INC. 58.55% $5,587,201.28
INDUSTRIAL FABRICS, INC. 8.29% $791,082.81
APOLLO CONSTRUCTORS, INC. 4.25% $405,561.15
LINEAR TRAFFIC MARKINGS LLC 1.52% $145,047.75
DUSTROL, INC. 0.67% $63,935.52
H & F TRUCKING 0.47% $44,850.29
BARRICADES UNLIMITED 0.33% $31,490.63
Total: 74.08% $7,069,169.43

Bid Items & Bid Tabulations

135 Total 0 of 135
RANDALL  |  US 87  |  AMARILLO  |  0067-01-087  |  12/05/2023  |  $8,011,274.05  |  F 2024(460)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  167 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, INC.
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
RK HALL, LLC
REMOVING CONC (RIPRAP)
SY 6.000 $40.000 $26.600 $265.000 $60.000 $250.260
REMOVING CONC (SIDEWALKS)
SY 87.000 $40.000 $45.860 $75.000 $60.000 $250.260
REMOVING CONC (DRIVEWAYS)
SY 2,482.000 $20.000 $32.150 $75.000 $60.000 $98.990
REMOVING CONC (CURB AND GUTTER)
LF 418.000 $11.000 $15.270 $27.000 $60.000 $52.030
REMOVING CONC (CURB OR CURB & GUTTER)
LF 330.000 $11.000 $12.090 $27.000 $60.000 $52.030
REMOVING CONC (SIDEWALK OR RAMP)
SY 288.000 $15.000 $27.710 $75.000 $60.000 $250.260
REMOVING STAB BASE & ASPH PAV (0-6")
SY 1,095.000 $15.000 $21.860 $35.000 $60.000 $54.740
EXCAVATION (SPECIAL)
CY 50.000 $50.000 $79.800 $75.000 $150.000 $109.790
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 25.000 $75.000 $159.600 $145.000 $150.000 $227.130
BACKFILL (TY A)
STA 80.000 $250.000 $399.000 $535.000 $1,000.000 $550.720
BLADING
STA 4.000 $195.000 $1,995.000 $1,500.000 $1,000.000 $372.380
FURNISHING AND PLACING TOPSOIL (4")
SY 2,951.000 $9.000 $5.410 $25.000 $10.000 $22.380
BLOCK SODDING
SY 5,368.000 $9.000 $8.080 $11.000 $30.000 $10.200
BROADCAST SEED (TEMP) (WARM)
AC 3.000 $600.000 $3,030.000 $900.000 $2,500.000 $2,400.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 14,520.000 $1.000 $0.610 $1.000 $0.600 $0.600
VEGETATIVE WATERING
MG 52.000 $50.000 $25.250 $70.000 $60.000 $240.000
FOG SEAL (CSS-1H)
GAL 472.000 $20.000 $10.100 $15.000 $10.000 $10.180
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 13,605.000 $28.000 $45.960 $50.000 $40.000 $60.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 405.000 $4.000 $12.120 $68.860 $5.000 $40.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 59,201.000 $1.500 $4.290 $4.650 $5.000 $8.000
CURB (TYPE II)
LF 308.000 $40.000 $45.900 $106.000 $150.000 $114.000
CUT & RESTORING PAV
SY 23.000 $200.000 $101.000 $155.000 $180.000 $626.550
CUT & RESTORE ASPH PAVING
SY 898.000 $150.000 $85.850 $155.000 $180.000 $233.020
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 28.000 $450.000 $530.000 $585.000 $1,200.000 $630.000
CL A CONC (MISC)
CY 10.000 $700.000 $895.070 $1,220.000 $2,500.000 $3,000.000
CL A CONC (COLLAR)
EA 21.000 $2,000.000 $2,323.000 $1,350.000 $2,000.000 $3,000.000
RIPRAP (CONC)(4 IN)
CY 20.000 $700.000 $895.070 $665.000 $1,000.000 $717.600
RIPRAP (MOW STRIP)(4 IN)
CY 35.000 $750.000 $895.070 $680.000 $1,000.000 $1,371.430
CLEANING EXISTING JOINTS
LF 46.000 $15.000 $20.200 $56.000 $150.000 $300.000
RC PIPE (CL III)(24 IN)
LF 40.000 $225.000 $252.500 $560.000 $275.000 $600.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 21.000 $3,000.000 $2,525.000 $4,325.000 $2,100.000 $4,800.000
GRATE & FRAME
EA 18.000 $2,600.000 $3,593.330 $5,730.000 $3,000.000 $6,000.000
ADJUSTING MANHOLES & INLETS
EA 16.000 $5,000.000 $1,496.250 $1,000.000 $1,600.000 $6,000.000
REMOV STR (PIPE)
LF 22.000 $100.000 $25.250 $300.000 $160.000 $120.000
MOBILIZATION
LS 1.000 $810,000.000 $950,000.000 $1,002,000.000 $1,100,000.000 $1,397,018.100
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $27,500.000 $4,040.000 $50,000.000 $70,000.000 $139,701.810
SANDBAGS FOR EROSION CONTROL
EA 600.000 $7.000 $5.050 $35.000 $15.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 600.000 $8.000 $20.200 $9.500 $15.000 $9.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 600.000 $1.000 $1.010 $4.000 $15.000 $6.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 275.000 $8.000 $5.050 $11.000 $15.000 $16.800
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 600.000 $12.000 $7.070 $11.000 $15.000 $15.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 875.000 $3.000 $1.010 $8.000 $15.000 $8.400
COLORED TEXTURED CONC (4")
SY 1,127.000 $145.000 $185.000 $135.000 $175.000 $200.000
REMOVE AND RELAY PAVERS
SY 191.000 $300.000 $185.000 $175.000 $200.000 $600.000
CONC CURB (TY II)
LF 1,167.000 $30.000 $54.250 $27.000 $80.000 $40.000
CONC CURB & GUTTER (TY II)
LF 1,021.000 $45.000 $54.250 $33.000 $85.000 $50.000
CONCRETE CURB (SPECIAL)
LF 72.000 $100.000 $200.000 $130.000 $170.000 $150.000
DRIVEWAYS (CONC)
SY 3,785.000 $120.000 $145.000 $125.000 $160.000 $150.000
CONC SIDEWALKS (4")
SY 5,632.000 $95.000 $145.000 $90.000 $125.000 $85.000
CONC SIDEWALKS (5")
SY 100.000 $100.000 $145.000 $95.000 $135.000 $100.000
CURB RAMPS (TY 1)
SY 170.000 $175.000 $145.000 $175.000 $210.000 $300.000
CURB RAMPS (TY 2)
SY 59.000 $175.000 $160.000 $180.000 $210.000 $300.000
CURB RAMPS (TY 3)
SY 13.000 $175.000 $160.000 $180.000 $210.000 $300.000
CURB RAMPS (TY 5)
SY 54.000 $220.000 $160.000 $185.000 $220.000 $300.000
CURB RAMPS (TY 6)
SY 178.000 $175.000 $160.000 $175.000 $210.000 $300.000
CURB RAMPS (TY 7)
SY 457.000 $245.000 $160.000 $170.000 $200.000 $300.000
CURB RAMPS (TY 10)
SY 118.000 $175.000 $160.000 $170.000 $200.000 $300.000
MTL W-BEAM GD FEN (STEEL POST)
LF 300.000 $37.000 $40.400 $40.000 $45.000 $43.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $3,000.000 $3,232.000 $3,540.000 $3,300.000 $4,676.520
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $2,000.000 $1,868.500 $1,950.000 $1,700.000 $2,100.000
REMOVE METAL BEAM GUARD FENCE
LF 275.000 $4.000 $10.100 $4.450 $5.000 $4.800
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $350.000 $505.000 $450.000 $500.000 $480.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $5.000 $555.000 $450.000 $500.000 $480.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,500.000 $3,535.000 $4,050.000 $3,350.000 $4,362.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $350.000 $656.500 $450.000 $500.000 $480.000
CONDT (PVC) (SCH 40) (2")
LF 140.000 $20.000 $20.000 $21.150 $15.000 $22.800
CONDT (PVC) (SCH 40) (2") (BORE)
LF 430.000 $30.000 $30.000 $32.300 $52.000 $34.800
ELEC CONDR (NO.8) BARE
LF 100.000 $2.000 $2.000 $2.100 $1.500 $2.220
ELEC CONDR (NO.6) BARE
LF 470.000 $2.500 $2.500 $2.500 $1.750 $2.700
ELEC CONDR (NO.6) INSULATED
LF 720.000 $2.600 $3.000 $3.350 $8.000 $3.600
GROUND BOX TY D (162922)W/APRON
EA 4.000 $2,100.000 $2,250.000 $2,500.000 $5,500.000 $2,700.000
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 1.000 $9,000.000 $8,100.000 $8,700.000 $20,000.000 $9,390.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 41.000 $900.000 $794.870 $1,115.000 $800.000 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 67.000 $1,200.000 $947.380 $1,225.000 $950.000 $1,320.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $1,400.000 $1,184.730 $1,355.000 $1,200.000 $1,458.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $1,200.000 $1,134.230 $1,365.000 $1,150.000 $1,470.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,500.000 $1,217.050 $1,140.000 $1,250.000 $1,230.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,600.000 $1,324.110 $1,560.000 $1,350.000 $1,680.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $1,400.000 $2,003.840 $1,780.000 $2,000.000 $1,920.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 8.000 $2,400.000 $1,989.700 $2,225.000 $2,000.000 $2,400.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $2,600.000 $3,169.380 $1,335.000 $3,500.000 $1,440.000
REMOVE SM RD SN SUP&AM
EA 101.000 $150.000 $101.000 $280.000 $150.000 $150.000
REMOVE LRSA
EA 8.000 $2,200.000 $1,111.000 $1,670.000 $1,100.000 $1,800.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 35.000 $45.000 $101.000 $17.000 $15.000 $18.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 13.000 $70.000 $101.000 $45.000 $55.000 $48.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 22.000 $120.000 $122.210 $117.000 $125.000 $126.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,445.000 $1.000 $1.670 $1.950 $1.500 $2.380
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,110.000 $1.000 $1.670 $2.000 $1.500 $2.380
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,930.000 $2.000 $1.200 $1.450 $1.300 $1.560
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,626.000 $12.000 $6.820 $11.150 $10.000 $12.000
PAVEMENT SEALER 24"
LF 2,626.000 $4.000 $1.010 $2.800 $2.500 $3.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 4,148.000 $20.000 $13.030 $18.400 $16.500 $19.800
PREFAB PAV MRK TY C (W) (ARROW)
EA 27.000 $275.000 $250.480 $306.000 $275.000 $330.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $500.000 $353.500 $418.000 $375.000 $450.000
ELIM EXT PAV MRK & MRKS (12")
LF 1,852.000 $6.000 $2.020 $6.150 $5.500 $6.600
ELIM EXT PAV MRK & MRKS (24")
LF 737.000 $10.000 $3.030 $11.150 $10.000 $12.000
PAV SURF PREP FOR MRK (24")
LF 135.000 $1.000 $1.010 $11.150 $10.000 $12.000
INSTALL HWY TRF SIG (UPGRADE)
EA 4.000 $1,500.000 $5,000.000 $5,300.000 $20,000.000 $5,700.000
VEH SIG SEC (12")LED(YEL)
EA 4.000 $450.000 $400.000 $418.000 $1,000.000 $450.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $450.000 $440.000 $445.000 $1,000.000 $480.000
PED SIG SEC (LED)(COUNTDOWN)
EA 32.000 $1,000.000 $525.000 $560.000 $1,150.000 $600.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 64.000 $800.000 $575.000 $615.000 $700.000 $660.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 4.000 $850.000 $630.000 $670.000 $750.000 $720.000
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 8.000 $900.000 $700.000 $750.000 $750.000 $810.000
BACKPLATE W/REFL BRDR(3 SEC)
EA 4.000 $800.000 $550.000 $585.000 $550.000 $630.000
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 6,264.000 $5.000 $3.300 $3.650 $5.000 $3.900
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 6,280.000 $6.000 $5.000 $5.300 $6.000 $5.700
TRF SIG CBL (TY A)(14 AWG)(12 CONDR)
LF 280.000 $8.000 $6.500 $7.000 $12.000 $7.500
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 4.000 $1,200.000 $1,050.000 $1,115.000 $3,500.000 $1,200.000
INS TRF SIG PL AM (S)STR(TY A)
EA 4.000 $1,200.000 $8,000.000 $8,350.000 $20,000.000 $9,000.000
INS TRF SIG PL AM(S)1 ARM(32')
EA 2.000 $11,000.000 $13,499.760 $15,000.000 $25,000.000 $19,972.400
PED POLE ASSEMBLY
EA 1.000 $4,000.000 $4,100.000 $4,455.000 $10,000.000 $5,636.160
RELOCATE PED POLE ASSEMBLY
EA 2.000 $2,000.000 $3,750.000 $4,200.000 $6,500.000 $4,500.000
PED DETECT PUSH BUTTON (APS)
EA 32.000 $900.000 $1,000.000 $1,085.000 $2,500.000 $1,170.000
PED DETECTOR CONTROLLER UNIT
EA 5.000 $4,000.000 $4,520.000 $5,035.000 $6,000.000 $5,424.000
REPLACE OF GROUND BOXES
EA 19.000 $2,100.000 $2,500.000 $2,755.000 $3,000.000 $2,970.000
REMOVAL OF SIGNAL HEAD ASSM
EA 28.000 $200.000 $300.000 $310.000 $650.000 $336.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 28.000 $200.000 $250.000 $250.000 $175.000 $270.000
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 137,038.000 $6.200 $7.070 $6.450 $9.000 $10.000
ASPH FOR REINF FAB (PG70-28)
GAL 30,220.000 $4.700 $4.040 $6.200 $3.500 $10.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 30.000 $300.000 $580.750 $480.000 $170.000 $400.000
TACK COAT
GAL 5.000 $50.000 $34.850 $27.000 $10.000 $210.000
SP MIXES SP-D SAC-A PG70-28
TON 15,606.000 $140.000 $196.950 $194.000 $170.000 $223.000
UNDERSEAL COURSE
GAL 14,255.000 $6.000 $6.060 $7.000 $6.000 $13.500
MOVE AND RESET PRECAST CONC WHEEL STOPS
EA 59.000 $100.000 $252.500 $180.000 $56.780 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $2,525.000 $10,200.000 $20,000.000 $25,000.000
HPPM W/RET REQ TY I(W)6"(BRK)(090MIL)
LF 7,677.000 $0.750 $0.750 $0.900 $0.800 $0.960
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
LF 19,576.000 $0.700 $0.710 $0.900 $0.800 $0.960
HPPM W/RET REQ TY I(Y)6"(BRK)(090MIL)
LF 3,044.000 $0.750 $0.710 $0.900 $0.800 $0.960
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
LF 44,304.000 $0.750 $0.710 $0.900 $0.800 $0.960
TMA (STATIONARY)
DAY 130.000 $330.000 $101.000 $585.000 $850.000 $600.000
TMA (MOBILE OPERATION)
HR 120.000 $150.000 $101.000 $105.000 $95.000 $150.000
PEDESTRIAN HYBRID BEACONS
EA 1.000 $25,000.000 $35,000.000 $35,500.000 $65,000.000 $40,000.000
REC REFL PAV MRKR TY I-C
EA 65.000 $45.000 $40.400 $190.000 $170.000 $204.000
CLEANING SUBSTRUCTURE (ABUT)
EA 2.000 $1.000 $1,010.000 $2,785.000 $3,350.000 $10,000.000
Totals: $8,011,274.050 $9,542,615.340 $10,257,567.050 $11,240,331.820 $13,970,181.050