|
|
REMOVING CONC (RIPRAP)
|
SY
|
6.000
|
$40.000
|
$26.600
|
$265.000
|
$60.000
|
$250.260
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
87.000
|
$40.000
|
$45.860
|
$75.000
|
$60.000
|
$250.260
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
2,482.000
|
$20.000
|
$32.150
|
$75.000
|
$60.000
|
$98.990
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
418.000
|
$11.000
|
$15.270
|
$27.000
|
$60.000
|
$52.030
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
330.000
|
$11.000
|
$12.090
|
$27.000
|
$60.000
|
$52.030
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
288.000
|
$15.000
|
$27.710
|
$75.000
|
$60.000
|
$250.260
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
1,095.000
|
$15.000
|
$21.860
|
$35.000
|
$60.000
|
$54.740
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
50.000
|
$50.000
|
$79.800
|
$75.000
|
$150.000
|
$109.790
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
25.000
|
$75.000
|
$159.600
|
$145.000
|
$150.000
|
$227.130
|
|
|
BACKFILL (TY A)
|
STA
|
80.000
|
$250.000
|
$399.000
|
$535.000
|
$1,000.000
|
$550.720
|
|
|
BLADING
|
STA
|
4.000
|
$195.000
|
$1,995.000
|
$1,500.000
|
$1,000.000
|
$372.380
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
2,951.000
|
$9.000
|
$5.410
|
$25.000
|
$10.000
|
$22.380
|
|
|
BLOCK SODDING
|
SY
|
5,368.000
|
$9.000
|
$8.080
|
$11.000
|
$30.000
|
$10.200
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
AC
|
3.000
|
$600.000
|
$3,030.000
|
$900.000
|
$2,500.000
|
$2,400.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
14,520.000
|
$1.000
|
$0.610
|
$1.000
|
$0.600
|
$0.600
|
|
|
VEGETATIVE WATERING
|
MG
|
52.000
|
$50.000
|
$25.250
|
$70.000
|
$60.000
|
$240.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
472.000
|
$20.000
|
$10.100
|
$15.000
|
$10.000
|
$10.180
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
13,605.000
|
$28.000
|
$45.960
|
$50.000
|
$40.000
|
$60.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
405.000
|
$4.000
|
$12.120
|
$68.860
|
$5.000
|
$40.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
59,201.000
|
$1.500
|
$4.290
|
$4.650
|
$5.000
|
$8.000
|
|
|
CURB (TYPE II)
|
LF
|
308.000
|
$40.000
|
$45.900
|
$106.000
|
$150.000
|
$114.000
|
|
|
CUT & RESTORING PAV
|
SY
|
23.000
|
$200.000
|
$101.000
|
$155.000
|
$180.000
|
$626.550
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
898.000
|
$150.000
|
$85.850
|
$155.000
|
$180.000
|
$233.020
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
28.000
|
$450.000
|
$530.000
|
$585.000
|
$1,200.000
|
$630.000
|
|
|
CL A CONC (MISC)
|
CY
|
10.000
|
$700.000
|
$895.070
|
$1,220.000
|
$2,500.000
|
$3,000.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
21.000
|
$2,000.000
|
$2,323.000
|
$1,350.000
|
$2,000.000
|
$3,000.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
20.000
|
$700.000
|
$895.070
|
$665.000
|
$1,000.000
|
$717.600
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
35.000
|
$750.000
|
$895.070
|
$680.000
|
$1,000.000
|
$1,371.430
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
46.000
|
$15.000
|
$20.200
|
$56.000
|
$150.000
|
$300.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
40.000
|
$225.000
|
$252.500
|
$560.000
|
$275.000
|
$600.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
21.000
|
$3,000.000
|
$2,525.000
|
$4,325.000
|
$2,100.000
|
$4,800.000
|
|
|
GRATE & FRAME
|
EA
|
18.000
|
$2,600.000
|
$3,593.330
|
$5,730.000
|
$3,000.000
|
$6,000.000
|
|
|
ADJUSTING MANHOLES & INLETS
|
EA
|
16.000
|
$5,000.000
|
$1,496.250
|
$1,000.000
|
$1,600.000
|
$6,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
22.000
|
$100.000
|
$25.250
|
$300.000
|
$160.000
|
$120.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$810,000.000
|
$950,000.000
|
$1,002,000.000
|
$1,100,000.000
|
$1,397,018.100
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$27,500.000
|
$4,040.000
|
$50,000.000
|
$70,000.000
|
$139,701.810
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
600.000
|
$7.000
|
$5.050
|
$35.000
|
$15.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
600.000
|
$8.000
|
$20.200
|
$9.500
|
$15.000
|
$9.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
600.000
|
$1.000
|
$1.010
|
$4.000
|
$15.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
275.000
|
$8.000
|
$5.050
|
$11.000
|
$15.000
|
$16.800
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
600.000
|
$12.000
|
$7.070
|
$11.000
|
$15.000
|
$15.600
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
875.000
|
$3.000
|
$1.010
|
$8.000
|
$15.000
|
$8.400
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
1,127.000
|
$145.000
|
$185.000
|
$135.000
|
$175.000
|
$200.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
191.000
|
$300.000
|
$185.000
|
$175.000
|
$200.000
|
$600.000
|
|
|
CONC CURB (TY II)
|
LF
|
1,167.000
|
$30.000
|
$54.250
|
$27.000
|
$80.000
|
$40.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,021.000
|
$45.000
|
$54.250
|
$33.000
|
$85.000
|
$50.000
|
|
|
CONCRETE CURB (SPECIAL)
|
LF
|
72.000
|
$100.000
|
$200.000
|
$130.000
|
$170.000
|
$150.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
3,785.000
|
$120.000
|
$145.000
|
$125.000
|
$160.000
|
$150.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
5,632.000
|
$95.000
|
$145.000
|
$90.000
|
$125.000
|
$85.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
100.000
|
$100.000
|
$145.000
|
$95.000
|
$135.000
|
$100.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
170.000
|
$175.000
|
$145.000
|
$175.000
|
$210.000
|
$300.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
59.000
|
$175.000
|
$160.000
|
$180.000
|
$210.000
|
$300.000
|
|
|
CURB RAMPS (TY 3)
|
SY
|
13.000
|
$175.000
|
$160.000
|
$180.000
|
$210.000
|
$300.000
|
|
|
CURB RAMPS (TY 5)
|
SY
|
54.000
|
$220.000
|
$160.000
|
$185.000
|
$220.000
|
$300.000
|
|
|
CURB RAMPS (TY 6)
|
SY
|
178.000
|
$175.000
|
$160.000
|
$175.000
|
$210.000
|
$300.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
457.000
|
$245.000
|
$160.000
|
$170.000
|
$200.000
|
$300.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
118.000
|
$175.000
|
$160.000
|
$170.000
|
$200.000
|
$300.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
300.000
|
$37.000
|
$40.400
|
$40.000
|
$45.000
|
$43.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$3,000.000
|
$3,232.000
|
$3,540.000
|
$3,300.000
|
$4,676.520
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$2,000.000
|
$1,868.500
|
$1,950.000
|
$1,700.000
|
$2,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
275.000
|
$4.000
|
$10.100
|
$4.450
|
$5.000
|
$4.800
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$350.000
|
$505.000
|
$450.000
|
$500.000
|
$480.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$5.000
|
$555.000
|
$450.000
|
$500.000
|
$480.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$3,500.000
|
$3,535.000
|
$4,050.000
|
$3,350.000
|
$4,362.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$350.000
|
$656.500
|
$450.000
|
$500.000
|
$480.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
140.000
|
$20.000
|
$20.000
|
$21.150
|
$15.000
|
$22.800
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
430.000
|
$30.000
|
$30.000
|
$32.300
|
$52.000
|
$34.800
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
100.000
|
$2.000
|
$2.000
|
$2.100
|
$1.500
|
$2.220
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
470.000
|
$2.500
|
$2.500
|
$2.500
|
$1.750
|
$2.700
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
720.000
|
$2.600
|
$3.000
|
$3.350
|
$8.000
|
$3.600
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
4.000
|
$2,100.000
|
$2,250.000
|
$2,500.000
|
$5,500.000
|
$2,700.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
|
EA
|
1.000
|
$9,000.000
|
$8,100.000
|
$8,700.000
|
$20,000.000
|
$9,390.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
41.000
|
$900.000
|
$794.870
|
$1,115.000
|
$800.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
67.000
|
$1,200.000
|
$947.380
|
$1,225.000
|
$950.000
|
$1,320.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$1,400.000
|
$1,184.730
|
$1,355.000
|
$1,200.000
|
$1,458.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
2.000
|
$1,200.000
|
$1,134.230
|
$1,365.000
|
$1,150.000
|
$1,470.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,500.000
|
$1,217.050
|
$1,140.000
|
$1,250.000
|
$1,230.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,600.000
|
$1,324.110
|
$1,560.000
|
$1,350.000
|
$1,680.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
2.000
|
$1,400.000
|
$2,003.840
|
$1,780.000
|
$2,000.000
|
$1,920.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
8.000
|
$2,400.000
|
$1,989.700
|
$2,225.000
|
$2,000.000
|
$2,400.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
4.000
|
$2,600.000
|
$3,169.380
|
$1,335.000
|
$3,500.000
|
$1,440.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
101.000
|
$150.000
|
$101.000
|
$280.000
|
$150.000
|
$150.000
|
|
|
REMOVE LRSA
|
EA
|
8.000
|
$2,200.000
|
$1,111.000
|
$1,670.000
|
$1,100.000
|
$1,800.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
35.000
|
$45.000
|
$101.000
|
$17.000
|
$15.000
|
$18.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
13.000
|
$70.000
|
$101.000
|
$45.000
|
$55.000
|
$48.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
22.000
|
$120.000
|
$122.210
|
$117.000
|
$125.000
|
$126.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,445.000
|
$1.000
|
$1.670
|
$1.950
|
$1.500
|
$2.380
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,110.000
|
$1.000
|
$1.670
|
$2.000
|
$1.500
|
$2.380
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,930.000
|
$2.000
|
$1.200
|
$1.450
|
$1.300
|
$1.560
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,626.000
|
$12.000
|
$6.820
|
$11.150
|
$10.000
|
$12.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
2,626.000
|
$4.000
|
$1.010
|
$2.800
|
$2.500
|
$3.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
4,148.000
|
$20.000
|
$13.030
|
$18.400
|
$16.500
|
$19.800
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
27.000
|
$275.000
|
$250.480
|
$306.000
|
$275.000
|
$330.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
8.000
|
$500.000
|
$353.500
|
$418.000
|
$375.000
|
$450.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
1,852.000
|
$6.000
|
$2.020
|
$6.150
|
$5.500
|
$6.600
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
737.000
|
$10.000
|
$3.030
|
$11.150
|
$10.000
|
$12.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
135.000
|
$1.000
|
$1.010
|
$11.150
|
$10.000
|
$12.000
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
4.000
|
$1,500.000
|
$5,000.000
|
$5,300.000
|
$20,000.000
|
$5,700.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$450.000
|
$400.000
|
$418.000
|
$1,000.000
|
$450.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
8.000
|
$450.000
|
$440.000
|
$445.000
|
$1,000.000
|
$480.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
32.000
|
$1,000.000
|
$525.000
|
$560.000
|
$1,150.000
|
$600.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
64.000
|
$800.000
|
$575.000
|
$615.000
|
$700.000
|
$660.000
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
4.000
|
$850.000
|
$630.000
|
$670.000
|
$750.000
|
$720.000
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
8.000
|
$900.000
|
$700.000
|
$750.000
|
$750.000
|
$810.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
4.000
|
$800.000
|
$550.000
|
$585.000
|
$550.000
|
$630.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
6,264.000
|
$5.000
|
$3.300
|
$3.650
|
$5.000
|
$3.900
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
6,280.000
|
$6.000
|
$5.000
|
$5.300
|
$6.000
|
$5.700
|
|
|
TRF SIG CBL (TY A)(14 AWG)(12 CONDR)
|
LF
|
280.000
|
$8.000
|
$6.500
|
$7.000
|
$12.000
|
$7.500
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
4.000
|
$1,200.000
|
$1,050.000
|
$1,115.000
|
$3,500.000
|
$1,200.000
|
|
|
INS TRF SIG PL AM (S)STR(TY A)
|
EA
|
4.000
|
$1,200.000
|
$8,000.000
|
$8,350.000
|
$20,000.000
|
$9,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')
|
EA
|
2.000
|
$11,000.000
|
$13,499.760
|
$15,000.000
|
$25,000.000
|
$19,972.400
|
|
|
PED POLE ASSEMBLY
|
EA
|
1.000
|
$4,000.000
|
$4,100.000
|
$4,455.000
|
$10,000.000
|
$5,636.160
|
|
|
RELOCATE PED POLE ASSEMBLY
|
EA
|
2.000
|
$2,000.000
|
$3,750.000
|
$4,200.000
|
$6,500.000
|
$4,500.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
32.000
|
$900.000
|
$1,000.000
|
$1,085.000
|
$2,500.000
|
$1,170.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
5.000
|
$4,000.000
|
$4,520.000
|
$5,035.000
|
$6,000.000
|
$5,424.000
|
|
|
REPLACE OF GROUND BOXES
|
EA
|
19.000
|
$2,100.000
|
$2,500.000
|
$2,755.000
|
$3,000.000
|
$2,970.000
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
28.000
|
$200.000
|
$300.000
|
$310.000
|
$650.000
|
$336.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
28.000
|
$200.000
|
$250.000
|
$250.000
|
$175.000
|
$270.000
|
|
|
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
|
SY
|
137,038.000
|
$6.200
|
$7.070
|
$6.450
|
$9.000
|
$10.000
|
|
|
ASPH FOR REINF FAB (PG70-28)
|
GAL
|
30,220.000
|
$4.700
|
$4.040
|
$6.200
|
$3.500
|
$10.000
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
30.000
|
$300.000
|
$580.750
|
$480.000
|
$170.000
|
$400.000
|
|
|
TACK COAT
|
GAL
|
5.000
|
$50.000
|
$34.850
|
$27.000
|
$10.000
|
$210.000
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
15,606.000
|
$140.000
|
$196.950
|
$194.000
|
$170.000
|
$223.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
14,255.000
|
$6.000
|
$6.060
|
$7.000
|
$6.000
|
$13.500
|
|
|
MOVE AND RESET PRECAST CONC WHEEL STOPS
|
EA
|
59.000
|
$100.000
|
$252.500
|
$180.000
|
$56.780
|
$100.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$2,525.000
|
$10,200.000
|
$20,000.000
|
$25,000.000
|
|
|
HPPM W/RET REQ TY I(W)6"(BRK)(090MIL)
|
LF
|
7,677.000
|
$0.750
|
$0.750
|
$0.900
|
$0.800
|
$0.960
|
|
|
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
|
LF
|
19,576.000
|
$0.700
|
$0.710
|
$0.900
|
$0.800
|
$0.960
|
|
|
HPPM W/RET REQ TY I(Y)6"(BRK)(090MIL)
|
LF
|
3,044.000
|
$0.750
|
$0.710
|
$0.900
|
$0.800
|
$0.960
|
|
|
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
|
LF
|
44,304.000
|
$0.750
|
$0.710
|
$0.900
|
$0.800
|
$0.960
|
|
|
TMA (STATIONARY)
|
DAY
|
130.000
|
$330.000
|
$101.000
|
$585.000
|
$850.000
|
$600.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
120.000
|
$150.000
|
$101.000
|
$105.000
|
$95.000
|
$150.000
|
|
|
PEDESTRIAN HYBRID BEACONS
|
EA
|
1.000
|
$25,000.000
|
$35,000.000
|
$35,500.000
|
$65,000.000
|
$40,000.000
|
|
|
REC REFL PAV MRKR TY I-C
|
EA
|
65.000
|
$45.000
|
$40.400
|
$190.000
|
$170.000
|
$204.000
|
|
|
CLEANING SUBSTRUCTURE (ABUT)
|
EA
|
2.000
|
$1.000
|
$1,010.000
|
$2,785.000
|
$3,350.000
|
$10,000.000
|
|
Totals: |
$8,011,274.050
|
$9,542,615.340
|
$10,257,567.050
|
$11,240,331.820
|
$13,970,181.050
|