|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
66.000
|
$50.000
|
$45.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
4,915.000
|
$55.000
|
$16.500
|
|
|
BACKFILL (TY A OR B)
|
STA
|
743.000
|
$250.000
|
$200.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
10,041.000
|
$100.000
|
$85.000
|
|
|
PLANE ASPH CONC PAV(0" TO 1")
|
SY
|
245.000
|
$2.500
|
$21.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
278.000
|
$6.000
|
$18.000
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
371,065.000
|
$1.500
|
$1.100
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
7,950.000
|
$2.600
|
$2.500
|
|
|
PLANE ASPH CONC PAV(1" TO 2")
|
SY
|
25,422.000
|
$1.500
|
$2.500
|
|
|
PLANE ASPH CONC PAV (1" TO 4")
|
SY
|
4,980.000
|
$8.750
|
$3.750
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
256.000
|
$60.000
|
$50.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
568.000
|
$55.000
|
$50.000
|
|
|
RAIL (TY SSTR)(MOD)
|
LF
|
1,156.000
|
$333.000
|
$350.000
|
|
|
RETROFIT RAIL (ADD HSS)
|
LF
|
400.000
|
$163.000
|
$62.500
|
|
|
REMOVE STR (RAIL)
|
LF
|
1,156.000
|
$38.000
|
$40.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,187,605.860
|
$355,500.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$20,000.000
|
$6,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,350.000
|
$7.000
|
$4.300
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,350.000
|
$2.500
|
$1.750
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
720.000
|
$200.000
|
$100.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
1,620.000
|
$11.500
|
$10.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
4,860.000
|
$5.500
|
$4.750
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
1,620.000
|
$20.000
|
$11.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
8.000
|
$1,200.000
|
$1,750.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
3.000
|
$1,750.000
|
$1,750.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
11.000
|
$1,750.000
|
$1,950.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
139,370.000
|
$0.700
|
$0.160
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
111,583.000
|
$0.250
|
$0.190
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
3,250.000
|
$40.000
|
$37.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
24.000
|
$3,000.000
|
$2,750.000
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
450.000
|
$40.000
|
$19.000
|
|
|
MTL THRIE-BEAM GD FEN ADJUSTMENT
|
LF
|
75.000
|
$205.000
|
$19.000
|
|
|
TERMINAL ANCHOR SECTION ADJUSTMENT
|
EA
|
4.000
|
$542.000
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,350.000
|
$5.000
|
$8.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
11.000
|
$260.000
|
$375.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$250.000
|
$375.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
40.000
|
$3,500.000
|
$3,400.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
13.000
|
$350.000
|
$375.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
32.000
|
$650.000
|
$715.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,100.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$12,250.000
|
$15,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
41.000
|
$1,250.000
|
$1,450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$1,375.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
25.000
|
$1,600.000
|
$1,750.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
12.000
|
$200.000
|
$200.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
106.000
|
$50.000
|
$20.250
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
56.000
|
$65.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
129.000
|
$50.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
159.000
|
$120.000
|
$62.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
88.000
|
$85.000
|
$66.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
12,717.000
|
$2.000
|
$2.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,769.000
|
$2.000
|
$2.250
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
2,860.000
|
$1.750
|
$1.550
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
74.000
|
$11.000
|
$8.300
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
5.000
|
$215.000
|
$115.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
12.000
|
$340.000
|
$245.000
|
|
REFL PAV MRK TY I (W)(BIKE ARW)(090MIL)
|
EA
|
18.000
|
$150.000
|
$115.000
|
|
REFL PAV MRK TY I(W)(BIKE SYML)(090MIL)
|
EA
|
18.000
|
$300.000
|
$195.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
10,482.000
|
$1.300
|
$0.900
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
148,662.000
|
$1.190
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
1,219.000
|
$0.790
|
$0.900
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
148,657.000
|
$1.200
|
$0.750
|
|
REFL PAV MRKR TY I-C
|
EA
|
528.000
|
$6.000
|
$4.650
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,921.000
|
$5.680
|
$4.650
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
81,932.000
|
$5.500
|
$5.250
|
|
|
D-GR HMA TY-C SAC-A PG70-22
|
TON
|
45,142.000
|
$155.000
|
$225.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$20,000.000
|
$12,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
175.000
|
$305.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
25.000
|
$650.000
|
$650.000
|
|
Totals: |
$13,040,977.680
|
$14,287,894.670
|