Show Job Controls
Bid Cobra

POTTER IRWIN RD (0904-02-051)

Items: 86

County: POTTER
Length: 0.0000 MILES
Highway: IRWIN RD
District: AMARILLO
Control Number: 0904-02-051
DBE Goal: 0.0%
Project: BR 2024(904)
Guaranty: $49,000.00
Time: 151 WORKING DAYS
Engineer's Estimate: $2,472,866.82
Date: 02/04/2026 (4 months ago)
Contract Number: 2263025
Type: BRIDGE REPLACEMENT
Project ID: A00188551
Contract Type: Federal
Project Description: REPLACE EXISTING OFF-SYSTEM BRIDGE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$2,472,866.82
Over/Under Est: -19.25% -$476,105.62
Over/Under Est: -12.87% -$318,347.65
Amt Left: 7.9% $157,757.97
$2,520,955.00
Over/Under Est: 1.94% $48,088.18
Amt Left: 26.25% $524,193.80
Delta: -17.01% -$366,435.83
Over/Under Est: 2.28% $56,408.18
Amt Left: 26.67% $532,513.80
Delta: -0.33% -$8,320.00
$2,769,350.40
Over/Under Est: 11.99% $296,483.58
Amt Left: 38.69% $772,589.20
Delta: -9.49% -$240,075.40
$3,077,685.64
Over/Under Est: 24.46% $604,818.82
Amt Left: 54.13% $1,080,924.44
Delta: -11.13% -$308,335.24
$3,171,289.08
Over/Under Est: 28.24% $698,422.26
Amt Left: 58.82% $1,174,527.88
Delta: -3.04% -$93,603.44
Subcontractor Percentage Amount
TRP CONSTRUCTION GROUP, LLC 0.67% $13,378.30
BARRICADES UNLIMITED 0.49% $9,784.13
EMERY SAPP & SON'S INC. 0.43% $8,586.07
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.34% $6,788.99
Total: 1.93% $38,537.49

Bid Items & Bid Tabulations

86 Total 0 of 86
POTTER  |  IRWIN RD  |  AMARILLO  |  0904-02-051  |  02/04/2026  |  $2,472,866.82  |  BR 2024(904)  |  BRIDGE REPL  |  151 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
L A FULLER & SONS CONSTRUCTION, LTD.
TEXAS STEEL INDUSTRIAL PLACING, LLC
EARTH BUILDERS, L.P.
COPPELL CONSTRUCTION CO., INC.
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
C. E. BARKER, LTD.
PREP ROW (TREE REMOVE) (0"-12" DIA)
EA 10.000 $862.000 $596.950 $1,800.000 $800.000 $1,300.000 $450.000 $2,000.000 $3,266.550
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 6.000 $1,500.000 $866.450 $1,800.000 $5,000.000 $1,400.000 $3,400.000 $2,000.000 $4,355.400
PREP ROW (HAND CLEARING)
AC 0.050 $40,000.000 $82,825.000 $40,000.000 $200,000.000 $140,000.000 $26,500.000 $500,000.000 $32,665.500
REMOV CONC (PAV)
SY 55.000 $30.000 $34.400 $50.000 $20.000 $60.000 $68.000 $50.000 $76.530
REMOV CONC (RIPRAP)
SY 122.000 $408.000 $65.200 $30.000 $20.000 $60.000 $77.500 $50.000 $70.590
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 61.000 $50.000 $31.800 $25.000 $25.000 $60.000 $60.250 $50.000 $65.640
REMOV CONC (CURB & GUTTER)
LF 457.000 $25.000 $9.350 $13.000 $20.000 $15.000 $13.750 $25.000 $46.040
RMV (4"-8") TRT/UNTRT BASE & ASPH PAV
SY 621.000 $30.000 $13.900 $15.000 $30.000 $35.000 $17.000 $50.000 $76.530
RMV (12"-16") TRT/UNTRT BASE & ASPH PAV
SY 986.000 $30.000 $9.750 $30.000 $35.000 $37.000 $14.250 $50.000 $83.790
EXCAV (ROADWAY)
CY 566.000 $65.000 $29.500 $20.000 $25.000 $16.000 $64.000 $100.000 $74.490
EMBANK (FNL)(DC)(TY B)
CY 533.000 $55.000 $29.300 $35.000 $25.000 $41.000 $46.250 $100.000 $77.460
HYDRO MULCH SEED (PERM_RURAL_SANDY)
SY 678.000 $4.000 $5.150 $4.000 $5.000 $4.000 $4.850 $5.000 $12.120
HYDRO MULCH SEED (TEMP_COOL)
SY 678.000 $5.000 $5.150 $4.000 $5.000 $4.000 $4.850 $5.000 $12.120
VEGETATIVE WATERING
TGL 36.000 $6.000 $117.650 $50.000 $50.000 $50.000 $37.500 $360.000 $435.540
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 331.000 $5.500 $5.150 $4.000 $8.000 $4.000 $4.850 $5.000 $25.960
FL BS (CMP IN PLC)(TY A GR 4) (12")
SY 2,027.000 $50.000 $31.600 $60.000 $40.000 $58.000 $44.500 $100.000 $64.710
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12")
SY 153.000 $52.000 $34.950 $60.000 $50.000 $90.000 $79.250 $100.000 $65.950
GEOGRID BASE REINFORCEMENT (TYPE 2)
SY 147.000 $22.000 $13.550 $20.000 $8.000 $100.000 $36.200 $60.000 $44.440
PRIME COAT (MC-30)
GAL 450.000 $8.000 $8.450 $15.000 $25.000 $20.000 $9.000 $20.000 $12.440
D-GR HMA TY-D SAC-A PG70-28
TON 350.000 $200.000 $234.600 $190.000 $350.000 $360.000 $230.000 $250.000 $727.080
TACK COAT
GAL 208.000 $20.000 $10.950 $15.000 $25.000 $12.000 $7.000 $10.000 $12.440
CEM STABIL BKFL
CY 36.000 $700.000 $288.250 $250.000 $400.000 $550.000 $465.000 $750.000 $358.280
TRENCH EXCAVATION PROTECTION
LF 65.000 $30.000 $644.550 $30.000 $25.000 $20.000 $150.000 $300.000 $12.440
DRILL SHAFT (18 IN)
LF 25.000 $1,000.000 $464.250 $265.440 $380.000 $520.000 $900.000 $750.000 $295.470
DRILL SHAFT (24 IN)
LF 444.000 $400.000 $319.800 $288.020 $400.000 $350.000 $326.000 $265.000 $536.820
CL C CONC (ABUT)
CY 43.800 $1,500.000 $2,020.850 $2,500.000 $2,500.000 $1,800.000 $2,285.000 $2,000.000 $2,485.510
CL C CONC (CAP)
CY 0.500 $4,250.000 $4,709.500 $6,000.000 $5,000.000 $6,000.000 $3,300.000 $10,000.000 $2,613.240
CL C CONC (COLUMN)
CY 0.700 $4,250.000 $5,851.000 $6,000.000 $5,000.000 $3,500.000 $5,200.000 $10,000.000 $2,302.140
CL C CONC (MISC)
CY 1.500 $1,700.000 $4,508.300 $1,500.000 $2,000.000 $3,500.000 $5,200.000 $10,000.000 $2,068.820
REINF CONC SLAB (SLAB BEAM)
SF 1,680.000 $45.000 $51.350 $34.000 $50.000 $47.000 $43.500 $70.000 $35.590
BRIDGE SIDEWALK
SF 1,120.000 $30.000 $12.700 $15.000 $35.000 $13.000 $28.650 $25.000 $22.130
APPROACH SLAB
CY 67.400 $680.000 $959.100 $850.000 $1,500.000 $1,300.000 $645.000 $2,000.000 $935.150
PRESTR CONC SLAB BEAM (4SB12)
LF 395.000 $350.000 $299.900 $299.330 $300.000 $400.000 $290.000 $300.000 $303.850
RIPRAP (STONE PROTECTION)(12 IN)
CY 326.000 $330.000 $221.950 $200.000 $250.000 $300.000 $450.000 $500.000 $405.990
RIPRAP (STONE PROTECTION)(24 IN)
CY 145.000 $206.000 $238.350 $200.000 $250.000 $325.000 $465.000 $500.000 $437.100
STR STEEL (MISC NON-BRIDGE)
LB 459.000 $16.000 $16.820 $20.000 $20.000 $33.000 $38.000 $30.000 $81.630
RAIL (TY PR11)
LF 165.000 $135.000 $164.350 $190.000 $160.000 $215.000 $190.000 $200.000 $554.340
RAIL (TY PR22)
LF 104.000 $150.000 $1,022.700 $200.000 $155.000 $325.000 $345.000 $200.000 $549.290
RAIL (HANDRAIL)(TY B)
LF 120.000 $117.000 $132.500 $140.000 $125.000 $160.000 $155.000 $150.000 $522.650
TYPE A JOINT
LF 84.000 $55.000 $22.300 $250.000 $50.000 $185.000 $42.500 $20.000 $326.660
CONC BOX CULV (10 FT X 8 FT)
LF 130.000 $1,700.000 $1,773.000 $1,800.000 $2,500.000 $2,500.000 $1,668.000 $3,800.000 $2,206.940
RC PIPE (CL III)(24 IN)
LF 45.000 $175.000 $122.350 $165.000 $180.000 $200.000 $225.000 $200.000 $412.520
WINGWALL (PW - 1) (HW=10 FT)
EA 2.000 $90,000.000 $55,924.600 $45,000.000 $125,000.000 $40,000.000 $67,000.000 $90,000.000 $20,688.150
SET (TY I) (24 IN) (6: 1) (C)
EA 1.000 $2,000.000 $2,403.450 $3,500.000 $3,500.000 $15,000.000 $5,550.000 $6,600.000 $5,007.470
REMOV STR (WINGWALL)
EA 7.000 $2,500.000 $2,272.050 $1,500.000 $15,000.000 $2,500.000 $1,240.000 $4,500.000 $5,755.350
REMOV STR (HEADWALL)
EA 3.000 $1,560.000 $5,140.900 $3,500.000 $10,000.000 $2,500.000 $5,900.000 $4,500.000 $6,999.750
REMOV STR (PIPE)
LF 261.000 $75.000 $34.150 $150.000 $25.000 $30.000 $100.000 $50.000 $130.660
REMOVE STR (PILING)
LF 30.000 $300.000 $252.250 $500.000 $150.000 $400.000 $215.000 $50.000 $665.750
MOBILIZATION
LS 1.000 $184,000.000 $195,049.550 $215,257.940 $275,000.000 $250,000.000 $276,000.000 $300,000.000 $287,550.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $35,000.000 $1,080.250 $2,500.000 $3,000.000 $25,000.000 $20,000.000 $15,000.000 $6,222.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $14,000.000 $18,874.450 $30,000.000 $25,000.000 $12,000.000 $12,000.000 $18,500.000 $16,799.400
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 135.000 $38.000 $48.600 $40.000 $80.000 $23.000 $45.000 $30.000 $60.840
CONSTRUCTION EXITS (REMOVE)
SY 135.000 $10.000 $34.150 $20.000 $15.000 $17.000 $13.000 $10.000 $34.220
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,104.000 $6.000 $5.150 $5.000 $7.000 $4.000 $7.250 $4.000 $9.650
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,104.000 $2.000 $1.300 $1.000 $2.000 $1.000 $3.750 $1.000 $5.920
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 190.000 $12.000 $5.800 $4.500 $12.000 $5.000 $10.000 $4.500 $10.270
BIODEG EROSN CONT LOGS (REMOVE)
LF 190.000 $3.000 $2.550 $2.000 $2.000 $2.000 $5.000 $2.000 $6.530
CONC CURB & GUTTER (TY II)
LF 1,058.000 $68.000 $34.400 $45.000 $35.000 $35.000 $30.000 $36.080 $65.330
CONCRETE C&G (VALLEY GUTTER)
LF 40.000 $80.000 $192.900 $60.000 $65.000 $50.000 $145.000 $160.000 $206.880
DRIVEWAYS (ACP) (TY 2)
SY 84.000 $160.000 $102.950 $80.000 $80.000 $150.000 $110.000 $100.000 $292.430
CONC SIDEWALKS (4")
SY 160.000 $117.000 $118.800 $120.000 $125.000 $97.000 $120.000 $110.000 $174.220
CURB RAMPS (TY 5)
EA 1.000 $2,000.000 $5,507.650 $3,500.000 $2,500.000 $3,000.000 $7,350.000 $2,800.000 $6,968.640
CONCRETE SIDEWALK (RETAINING WALL)
CY 17.000 $500.000 $1,039.450 $1,250.000 $1,000.000 $1,300.000 $2,200.000 $1,450.000 $3,702.090
REMOVE METAL BEAM GUARD FENCE
LF 127.000 $6.000 $58.700 $4.000 $8.000 $3.000 $3.650 $3.000 $102.880
RELOCATE EXISTING MAILBOX
EA 1.000 $430.000 $321.050 $440.000 $350.000 $450.000 $480.000 $400.000 $3,266.550
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 1.000 $1,000.000 $1,926.300 $1,100.000 $2,000.000 $1,000.000 $1,200.000 $1,000.000 $946.990
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 1.000 $335.000 $963.150 $500.000 $1,100.000 $460.000 $555.000 $460.000 $701.840
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $650.000 $963.150 $600.000 $750.000 $560.000 $675.000 $560.000 $806.370
REMOVE SM RD SN SUP&AM
EA 3.000 $140.000 $192.650 $110.000 $200.000 $100.000 $120.000 $100.000 $1,209.560
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 4.000 $165.000 $96.300 $200.000 $150.000 $180.000 $215.000 $180.000 $967.210
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 24.000 $75.000 $96.300 $110.000 $75.000 $100.000 $120.000 $100.000 $93.330
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 6.000 $35.000 $96.300 $45.000 $35.000 $40.000 $48.000 $40.000 $32.350
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $40.000 $96.300 $45.000 $75.000 $40.000 $48.000 $40.000 $28.620
INSTL OM SM RD SIGN (1-OM-PW)R
EA 1.000 $5.000 $96.300 $13.000 $150.000 $12.000 $15.000 $12.000 $26.130
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 10.000 $10.600 $28.750 $25.000 $30.000 $25.000 $30.000 $25.000 $9.960
RE PM TY II (Y) 6" (SLD)
LF 240.000 $0.500 $2.900 $2.500 $3.000 $3.000 $3.000 $2.500 $0.250
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 1,244.000 $1.200 $7.500 $6.500 $7.000 $7.000 $8.000 $6.500 $1.240
PAV SURF PREP FOR MRK (6")
LF 1,244.000 $0.550 $4.000 $3.500 $4.000 $4.000 $4.250 $3.500 $6.220
PAV SURF PREP FOR MRK (24")
LF 10.000 $2.000 $11.500 $10.000 $10.000 $12.000 $12.000 $10.000 $9.960
REMOVE EXIST SAN SWR PIPE (6 IN)
LF 95.000 $30.000 $167.100 $82.000 $25.000 $120.000 $64.000 $65.000 $68.770
SAN SWR CONNECTION TO EXIST MANHOLE
EA 1.000 $10,000.000 $6,223.350 $15,000.000 $2,500.000 $8,000.000 $2,865.000 $12,500.000 $6,533.100
BYPASS PUMPING
LS 1.000 $40,000.000 $32,054.450 $150,000.000 $6,500.000 $8,000.000 $378,000.000 $14,150.000 $37,643.100
MANHOLE (SAN SWR)(5FT DIA)
EA 1.000 $18,000.000 $13,001.300 $20,000.000 $12,000.000 $20,000.000 $23,200.000 $9,500.000 $7,528.620
SAN SEWER (6 IN)(DI)(RESTRAINED JT)
LF 95.000 $300.000 $121.350 $300.000 $200.000 $350.000 $315.000 $125.000 $379.540
CASTING (STEEL)(SAN SEWER)(14 IN)
LF 95.000 $400.000 $165.250 $300.000 $225.000 $350.000 $355.000 $225.000 $752.860
CONNECT TO EXISING SEWER LINER
EA 1.000 $6,000.320 $3,906.050 $20,000.000 $1,500.000 $3,500.000 $3,000.000 $14,150.000 $12,755.100
Totals: $2,472,866.820 $1,996,761.200 $2,154,519.170 $2,520,955.000 $2,529,275.000 $2,769,350.400 $3,077,685.640 $3,171,289.071
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,000.00
Total: $3,500.00