REMOVING CONC (RIPRAP)
|
SY
|
131.000
|
$50.000
|
$13.690
|
$49.000
|
$25.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
2,101.000
|
$30.000
|
$33.170
|
$15.000
|
$20.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
3,725.000
|
$15.000
|
$22.930
|
$18.790
|
$14.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
12.000
|
$200.000
|
$192.120
|
$135.000
|
$185.000
|
|
|
BLOCK SODDING
|
SY
|
308.000
|
$3.500
|
$5.130
|
$6.000
|
$5.500
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
15,810.000
|
$0.150
|
$0.170
|
$0.130
|
$0.130
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
15,810.000
|
$0.150
|
$0.170
|
$0.130
|
$0.130
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
31,614.000
|
$0.350
|
$0.400
|
$0.360
|
$0.350
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
1,244.000
|
$0.500
|
$0.400
|
$0.360
|
$0.350
|
|
|
VEGETATIVE WATERING
|
MG
|
1,295.200
|
$15.000
|
$20.000
|
$5.000
|
$15.000
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
325.000
|
$135.000
|
$0.010
|
$0.010
|
$135.000
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
5,084.000
|
$135.000
|
$149.100
|
$143.790
|
$135.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
500.000
|
$90.000
|
$130.660
|
$100.000
|
$85.000
|
|
|
PLANE ASPH CONC PAV (1.75" TO 3.5")
|
SY
|
67,726.000
|
$2.250
|
$2.210
|
$2.230
|
$1.800
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
85.000
|
$110.000
|
$113.980
|
$110.000
|
$100.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
3.000
|
$700.000
|
$1,367.730
|
$1,100.000
|
$1,100.000
|
|
|
CL C CONC (RAIL FOUNDATION)(HPC)
|
CY
|
349.000
|
$500.000
|
$250.280
|
$575.000
|
$590.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
297.000
|
$400.000
|
$626.870
|
$578.000
|
$550.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
2,268.000
|
$20.000
|
$18.840
|
$36.850
|
$18.000
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
3,330.000
|
$40.000
|
$39.040
|
$37.690
|
$36.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
44.000
|
$90.000
|
$54.710
|
$55.000
|
$53.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
624.000
|
$50.000
|
$61.550
|
$61.000
|
$58.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
20.000
|
$85.000
|
$109.420
|
$83.000
|
$79.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
4.000
|
$100.000
|
$188.060
|
$165.000
|
$158.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
12.000
|
$125.000
|
$227.950
|
$200.000
|
$190.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
1.000
|
$8,000.000
|
$13,677.250
|
$10,000.000
|
$9,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 54 IN)
|
EA
|
1.000
|
$11,000.000
|
$15,956.790
|
$14,000.000
|
$13,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 72 IN)
|
EA
|
1.000
|
$15,000.000
|
$22,795.420
|
$17,500.000
|
$17,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
1.000
|
$9,250.000
|
$13,677.250
|
$11,500.000
|
$11,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 66 IN)
|
EA
|
1.000
|
$13,000.000
|
$20,515.880
|
$14,000.000
|
$14,000.000
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$700.000
|
$911.820
|
$705.000
|
$680.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,000.000
|
$968.810
|
$825.000
|
$800.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$800.000
|
$1,025.790
|
$825.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$1,500.000
|
$1,082.780
|
$1,050.000
|
$1,000.000
|
|
|
SHOT BLASTING
|
SY
|
3,330.000
|
$10.000
|
$4.560
|
$4.400
|
$4.500
|
|
|
REMOV STR (PIPE)
|
EA
|
14.000
|
$750.000
|
$968.810
|
$300.000
|
$320.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$550,000.000
|
$153,199.630
|
$665,000.000
|
$530,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$2,500.000
|
$2,000.000
|
$3,800.000
|
$18,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
236.000
|
$22.000
|
$28.490
|
$35.000
|
$34.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
236.000
|
$9.000
|
$13.680
|
$8.800
|
$8.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,625.000
|
$3.000
|
$2.850
|
$3.150
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,625.000
|
$1.000
|
$0.850
|
$0.820
|
$0.800
|
|
|
CONSTRUCTING DETOURS
|
SY
|
10,712.000
|
$95.000
|
$93.290
|
$57.140
|
$74.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
1,525.000
|
$55.000
|
$113.880
|
$175.000
|
$95.000
|
|
|
PERM CTB (SGL SLOPE) (MOD)
|
LF
|
1,572.000
|
$65.000
|
$109.210
|
$143.000
|
$160.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,090.000
|
$60.000
|
$34.360
|
$38.190
|
$45.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
27,607.000
|
$0.250
|
$0.110
|
$0.210
|
$0.300
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$21.000
|
$26.780
|
$26.400
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$1,400.000
|
$1,652.670
|
$1,680.000
|
$1,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
250.000
|
$2.250
|
$1.710
|
$2.750
|
$2.700
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$275.000
|
$142.470
|
$275.000
|
$270.000
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
4,035.000
|
$9.500
|
$11.400
|
$19.250
|
$9.500
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
6.000
|
$2,600.000
|
$3,419.310
|
$2,975.000
|
$3,500.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
3,676.500
|
$5.000
|
$17.090
|
$2.480
|
$5.000
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
6.000
|
$400.000
|
$1,139.770
|
$550.000
|
$500.000
|
|
|
INSTALL SALVAGE CABLE BARRIER
|
LF
|
3,676.500
|
$7.000
|
$3.420
|
$6.600
|
$6.000
|
|
|
INSTALL SALVAGE CABLE BAR TERM SECTION
|
EA
|
6.000
|
$2,000.000
|
$569.890
|
$1,100.000
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,600.000
|
$2,598.680
|
$2,700.000
|
$2,600.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$220.000
|
$136.770
|
$275.000
|
$260.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$600.000
|
$455.910
|
$1,000.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$25,000.000
|
$27,080.960
|
$26,950.000
|
$26,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(W)(TL3)
|
EA
|
2.000
|
$7,500.000
|
$10,257.940
|
$9,750.000
|
$10,000.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
5.000
|
$175.000
|
$148.170
|
$225.000
|
$220.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$650.000
|
$797.840
|
$810.000
|
$780.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
2.000
|
$950.000
|
$991.600
|
$1,028.000
|
$980.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
3.000
|
$325.000
|
$501.500
|
$430.000
|
$410.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
23.000
|
$375.000
|
$512.900
|
$480.000
|
$460.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
31.000
|
$20.000
|
$21.090
|
$16.500
|
$16.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
8.000
|
$30.000
|
$25.070
|
$30.000
|
$29.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
16.000
|
$85.000
|
$70.670
|
$105.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
19,350.000
|
$0.400
|
$0.280
|
$0.240
|
$0.230
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
76,905.000
|
$0.250
|
$0.280
|
$0.220
|
$0.210
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
10,475.000
|
$1.000
|
$0.570
|
$0.500
|
$0.470
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
76,905.000
|
$0.250
|
$0.280
|
$0.220
|
$0.210
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
346.000
|
$1.000
|
$1.030
|
$2.500
|
$1.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
8,830.000
|
$1.000
|
$0.640
|
$1.250
|
$0.700
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
209.000
|
$1.500
|
$1.140
|
$1.100
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,095.000
|
$0.900
|
$1.030
|
$0.850
|
$0.800
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
200.000
|
$0.350
|
$0.300
|
$1.650
|
$1.600
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
789.000
|
$0.150
|
$0.300
|
$1.650
|
$1.600
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
789.000
|
$0.150
|
$0.300
|
$1.650
|
$1.600
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
3,870.000
|
$0.500
|
$0.320
|
$0.350
|
$0.350
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
15,256.000
|
$0.500
|
$0.320
|
$0.360
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
14,145.000
|
$0.500
|
$0.320
|
$0.360
|
$0.350
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
14.000
|
$200.000
|
$262.150
|
$205.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
14.000
|
$275.000
|
$307.740
|
$305.000
|
$290.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
300.000
|
$4.500
|
$5.700
|
$5.500
|
$5.500
|
|
|
D-GR HMA TY-C PG64-22 (LEVEL-UP)
|
TON
|
24,231.400
|
$95.000
|
$93.070
|
$97.170
|
$110.000
|
|
|
TACK COAT
|
GAL
|
6,344.000
|
$1.100
|
$5.730
|
$4.000
|
$3.600
|
|
|
D-GR HMA TY-D SAC-A PG64-22(EXEMPT)
|
TON
|
40.000
|
$115.000
|
$185.570
|
$210.000
|
$250.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
13,429.000
|
$3.300
|
$4.390
|
$3.990
|
$3.600
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$10,000.000
|
$1,709.660
|
$10,000.000
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
153.000
|
$100.000
|
$275.370
|
$75.000
|
$226.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
12.000
|
$150.000
|
$28.490
|
$100.000
|
$600.000
|
|
Totals: |
$6,447,981.950
|
$6,239,710.183
|
$6,625,628.248
|
$7,014,613.000
|