Bid Cobra

POLK US 59 (0176-04-087)

Items: 94

County: POLK
Length: N/A
Highway: US 59
District: LUFKIN
Control Number: 0176-04-087
DBE Goal: N/A
Project: F 2021(561)
Guaranty: N/A
Time: 174 WORKING DAYS
Engineer's Estimate: $6,447,981.95
Date: 06/03/2021 (5 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$6,447,981.95
$6,239,710.17
Over/Under Est: -3.23% -$208,271.78
Over/Under Est: 2.76% $177,646.29
Amt Left: 6.18% $385,918.07
$7,014,613.00
Over/Under Est: 8.79% $566,631.05
Amt Left: 12.42% $774,902.83
Delta: -5.87% -$388,984.76

Bid Items & Bid Tabulations

94 Total 0 of 94
POLK  |  US 59  |  LUFKIN  |  0176-04-087  |  06/03/2021  |  $6,447,981.95  |  F 2021(561)  |  HWY IMPRV  |  174 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VULCAN CONSTRUCTION
MOORE BROTHERS CONSTRUCTION COMPANY
A. L. HELMCAMP, INC.
REMOVING CONC (RIPRAP)
SY 131.000 $50.000 $13.690 $49.000 $25.000
REMOVING CONC (CTB)
LF 2,101.000 $30.000 $33.170 $15.000 $20.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 3,725.000 $15.000 $22.930 $18.790 $14.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 12.000 $200.000 $192.120 $135.000 $185.000
BLOCK SODDING
SY 308.000 $3.500 $5.130 $6.000 $5.500
BROADCAST SEED (TEMP) (WARM)
SY 15,810.000 $0.150 $0.170 $0.130 $0.130
BROADCAST SEED (TEMP) (COOL)
SY 15,810.000 $0.150 $0.170 $0.130 $0.130
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 31,614.000 $0.350 $0.400 $0.360 $0.350
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 1,244.000 $0.500 $0.400 $0.360 $0.350
VEGETATIVE WATERING
MG 1,295.200 $15.000 $20.000 $5.000 $15.000
PFC (ASPHALT) PG76-22
TON 325.000 $135.000 $0.010 $0.010 $135.000
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 5,084.000 $135.000 $149.100 $143.790 $135.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 500.000 $90.000 $130.660 $100.000 $85.000
PLANE ASPH CONC PAV (1.75" TO 3.5")
SY 67,726.000 $2.250 $2.210 $2.230 $1.800
CUT & RESTORE ASPH PAVING
SY 85.000 $110.000 $113.980 $110.000 $100.000
CL C CONC (COLLAR)
EA 3.000 $700.000 $1,367.730 $1,100.000 $1,100.000
CL C CONC (RAIL FOUNDATION)(HPC)
CY 349.000 $500.000 $250.280 $575.000 $590.000
RIPRAP (MOW STRIP)(4 IN)
CY 297.000 $400.000 $626.870 $578.000 $550.000
CLEANING AND SEALING EXISTING JOINTS
LF 2,268.000 $20.000 $18.840 $36.850 $18.000
MULTI-LAYER POLYMER OVERLAY
SY 3,330.000 $40.000 $39.040 $37.690 $36.000
RC PIPE (CL III)(15 IN)
LF 44.000 $90.000 $54.710 $55.000 $53.000
RC PIPE (CL III)(18 IN)
LF 624.000 $50.000 $61.550 $61.000 $58.000
RC PIPE (CL III)(24 IN)
LF 20.000 $85.000 $109.420 $83.000 $79.000
RC PIPE (CL III)(30 IN)
LF 4.000 $100.000 $188.060 $165.000 $158.000
RC PIPE (CL III)(36 IN)
LF 12.000 $125.000 $227.950 $200.000 $190.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 1.000 $8,000.000 $13,677.250 $10,000.000 $9,500.000
HEADWALL (CH - PW - 0) (DIA= 54 IN)
EA 1.000 $11,000.000 $15,956.790 $14,000.000 $13,500.000
HEADWALL (CH - PW - 0) (DIA= 72 IN)
EA 1.000 $15,000.000 $22,795.420 $17,500.000 $17,000.000
HEADWALL (CH - PW - S) (DIA= 48 IN)
EA 1.000 $9,250.000 $13,677.250 $11,500.000 $11,000.000
HEADWALL (CH - PW - S) (DIA= 66 IN)
EA 1.000 $13,000.000 $20,515.880 $14,000.000 $14,000.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 2.000 $700.000 $911.820 $705.000 $680.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 2.000 $1,000.000 $968.810 $825.000 $800.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 26.000 $800.000 $1,025.790 $825.000 $800.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 3.000 $1,500.000 $1,082.780 $1,050.000 $1,000.000
SHOT BLASTING
SY 3,330.000 $10.000 $4.560 $4.400 $4.500
REMOV STR (PIPE)
EA 14.000 $750.000 $968.810 $300.000 $320.000
MOBILIZATION
LS 1.000 $550,000.000 $153,199.630 $665,000.000 $530,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $2,500.000 $2,000.000 $3,800.000 $18,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 236.000 $22.000 $28.490 $35.000 $34.000
CONSTRUCTION EXITS (REMOVE)
SY 236.000 $9.000 $13.680 $8.800 $8.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,625.000 $3.000 $2.850 $3.150 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,625.000 $1.000 $0.850 $0.820 $0.800
CONSTRUCTING DETOURS
SY 10,712.000 $95.000 $93.290 $57.140 $74.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 1,525.000 $55.000 $113.880 $175.000 $95.000
PERM CTB (SGL SLOPE) (MOD)
LF 1,572.000 $65.000 $109.210 $143.000 $160.000
DRIVEWAYS (ACP)
SY 2,090.000 $60.000 $34.360 $38.190 $45.000
RUMBLE STRIPS (SHOULDER)
LF 27,607.000 $0.250 $0.110 $0.210 $0.300
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $21.000 $26.780 $26.400 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,400.000 $1,652.670 $1,680.000 $1,600.000
REMOVE METAL BEAM GUARD FENCE
LF 250.000 $2.250 $1.710 $2.750 $2.700
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $275.000 $142.470 $275.000 $270.000
CABLE BARRIER SYSTEM (TL-4)
LF 4,035.000 $9.500 $11.400 $19.250 $9.500
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 6.000 $2,600.000 $3,419.310 $2,975.000 $3,500.000
REMOVE CABLE BARRIER
LF 3,676.500 $5.000 $17.090 $2.480 $5.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 6.000 $400.000 $1,139.770 $550.000 $500.000
INSTALL SALVAGE CABLE BARRIER
LF 3,676.500 $7.000 $3.420 $6.600 $6.000
INSTALL SALVAGE CABLE BAR TERM SECTION
EA 6.000 $2,000.000 $569.890 $1,100.000 $2,800.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,600.000 $2,598.680 $2,700.000 $2,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $220.000 $136.770 $275.000 $260.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $600.000 $455.910 $1,000.000 $750.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $25,000.000 $27,080.960 $26,950.000 $26,000.000
CRASH CUSH ATTEN (INSTL)(S)(W)(TL3)
EA 2.000 $7,500.000 $10,257.940 $9,750.000 $10,000.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 5.000 $175.000 $148.170 $225.000 $220.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $650.000 $797.840 $810.000 $780.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $950.000 $991.600 $1,028.000 $980.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 3.000 $325.000 $501.500 $430.000 $410.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 23.000 $375.000 $512.900 $480.000 $460.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 31.000 $20.000 $21.090 $16.500 $16.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 8.000 $30.000 $25.070 $30.000 $29.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 16.000 $85.000 $70.670 $105.000 $100.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 19,350.000 $0.400 $0.280 $0.240 $0.230
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 76,905.000 $0.250 $0.280 $0.220 $0.210
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 10,475.000 $1.000 $0.570 $0.500 $0.470
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 76,905.000 $0.250 $0.280 $0.220 $0.210
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 346.000 $1.000 $1.030 $2.500 $1.000
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 8,830.000 $1.000 $0.640 $1.250 $0.700
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 209.000 $1.500 $1.140 $1.100 $1.100
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,095.000 $0.900 $1.030 $0.850 $0.800
REFL PAV MRK TY II (W) 4" (BRK)
LF 200.000 $0.350 $0.300 $1.650 $1.600
REFL PAV MRK TY II (W) 4" (SLD)
LF 789.000 $0.150 $0.300 $1.650 $1.600
REFL PAV MRK TY II (Y) 4" (SLD)
LF 789.000 $0.150 $0.300 $1.650 $1.600
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 3,870.000 $0.500 $0.320 $0.350 $0.350
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 15,256.000 $0.500 $0.320 $0.360 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 14,145.000 $0.500 $0.320 $0.360 $0.350
PREFAB PAV MRK TY C (W) (ARROW)
EA 14.000 $200.000 $262.150 $205.000 $200.000
PREFAB PAV MRK TY C (W) (WORD)
EA 14.000 $275.000 $307.740 $305.000 $290.000
REFL PAV MRKR TY II-C-R
EA 300.000 $4.500 $5.700 $5.500 $5.500
D-GR HMA TY-C PG64-22 (LEVEL-UP)
TON 24,231.400 $95.000 $93.070 $97.170 $110.000
TACK COAT
GAL 6,344.000 $1.100 $5.730 $4.000 $3.600
D-GR HMA TY-D SAC-A PG64-22(EXEMPT)
TON 40.000 $115.000 $185.570 $210.000 $250.000
UNDERSEAL COURSE
GAL 13,429.000 $3.300 $4.390 $3.990 $3.600
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $10,000.000 $1,709.660 $10,000.000 $10,000.000
TMA (STATIONARY)
DAY 153.000 $100.000 $275.370 $75.000 $226.000
TMA (MOBILE OPERATION)
DAY 12.000 $150.000 $28.490 $100.000 $600.000
Totals: $6,447,981.950 $6,239,710.183 $6,625,628.248 $7,014,613.000