Show Job Controls
Bid Cobra

PECOS US 285 (0139-08-040)

Items: 139

County: PECOS
Length: 9.7330 MILES
Highway: US 285
District: ODESSA
Control Number: 0139-08-040
DBE Goal: 0.0%
Project: C 139-8-40
Guaranty: $100,000.00
Time: 349 WORKING DAYS
Engineer's Estimate: $39,964,810.20
Date: 04/03/2025 (1 year ago)
Contract Number: 4253002
Type: ROADWAY WIDENING TO A SUPER 2
Project ID: A00122761
Project Description: ROADWAY WIDENING TO A SUPER 2
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ODA-PRELETTINGQUESTIONS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$39,964,810.20
Over/Under Est: -32.79% -$13,106,310.88
$28,265,792.58
Over/Under Est: -29.27% -$11,699,017.62
Amt Left: 5.24% $1,407,293.26
$34,382,889.44
Over/Under Est: -13.97% -$5,581,920.76
Amt Left: 28.01% $7,524,390.12
Delta: -21.64% -$6,117,096.86
$34,480,274.98
Over/Under Est: -13.72% -$5,484,535.22
Amt Left: 28.38% $7,621,775.66
Delta: -0.28% -$97,385.54
$37,066,726.90
Over/Under Est: -7.25% -$2,898,083.30
Amt Left: 38.01% $10,208,227.58
Delta: -7.50% -$2,586,451.92
Over/Under Est: -3.43% -$1,371,460.28
Amt Left: 43.69% $11,734,850.60
Delta: -4.12% -$1,526,623.02
Subcontractor Percentage Amount
RELMCO, INC. 24.03% $6,454,097.39
DOUBLE A CONTRACTING, L.P. 4.14% $1,111,941.87
TEXOP CONSTRUCTION 0.97% $260,527.44
CONTRACTORS SERVICE, LTD. 0.73% $196,067.05
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.67% $179,951.95
HJC FARMS, INC. 0.61% $163,836.85
WILLIS ELECTRIC CO., LP 0.43% $115,491.55
DK CONTRACTING, LLC 0.41% $110,119.85
LONG LEGACY ENTERPRISES, LLC 0.39% $104,748.15
R.E.B.D. TRUCKING LLC 0.00% $0.00
Total: 32.38% $8,696,782.10

Bid Items & Bid Tabulations

139 Total 0 of 139
PECOS  |  US 285  |  ODESSA  |  0139-08-040  |  04/03/2025  |  $39,964,810.20  |  C 139-8-40  |  ROADWAY WIDENING TO A SUPER 2  |  349 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
REECE ALBERT, INC.
A. L. HELMCAMP, INC.
CK NEWBERRY, LLC
FNF CONSTRUCTION, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
REMOV CONC (RIPRAP)
SY 300.000 $30.000 $45.000 $21.460 $24.000 $50.000 $30.000 $84.440
REMOV CONC (CURB)
LF 334.000 $20.000 $16.000 $4.810 $25.000 $15.000 $10.000 $16.590
REMOV CONC (FLUME)
SY 35.000 $50.000 $47.000 $22.430 $35.000 $50.000 $85.000 $144.460
RMV (0"-7") TRT/UNTRT BASE & ASPH PAV
SY 2,764.000 $8.000 $5.650 $12.310 $18.000 $10.000 $6.000 $11.890
RMV (8"-19") TRT/UNTRT BASE & ASPH PAV
SY 5,009.000 $20.000 $7.550 $5.920 $15.000 $15.000 $18.000 $11.410
EXCAV (ROADWAY)
CY 79,600.000 $13.000 $14.000 $10.350 $16.000 $16.000 $31.500 $18.060
EMBANK (FNL)(DC)(TY B)
CY 14,019.000 $18.000 $11.900 $6.150 $8.000 $16.000 $50.000 $27.060
BLADING
HR 127.000 $275.000 $375.000 $529.180 $200.000 $150.000 $270.000 $450.000
DRILL SEED (PERM_RURAL_SAND)
SY 368,824.000 $0.300 $0.130 $0.130 $0.220 $0.120 $0.150 $0.380
PROOF ROLLING
HR 252.000 $125.000 $150.000 $172.140 $200.000 $75.000 $100.000 $237.220
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 5,162.000 $30.000 $19.500 $18.030 $12.000 $15.000 $16.000 $22.740
FL BS (CMP IN PLC)(TY A GR 4)(5")
SY 179,731.000 $15.000 $6.420 $8.810 $10.000 $10.000 $7.750 $9.620
PRIME COAT (AE-P)
GAL 65,090.000 $5.000 $4.700 $0.340 $4.750 $5.000 $7.000 $6.770
ASPH (AC-20-5TR)
GAL 59,244.000 $5.000 $3.870 $3.790 $4.750 $3.750 $3.450 $3.620
ASPH (CRS-2P)
GAL 59,244.000 $5.000 $4.900 $3.990 $4.750 $3.750 $3.600 $3.790
AGGR (TY-PB, GR-4)(SAC-B)
CY 2,855.000 $150.000 $124.000 $133.640 $200.000 $140.000 $160.000 $123.950
D-GR HMA TY-C SAC-B PG70-22
TON 1,120.000 $220.000 $150.000 $178.280 $215.000 $150.000 $180.000 $349.960
TACK COAT
GAL 502.000 $15.000 $8.760 $2.390 $4.750 $4.000 $13.000 $3.920
SP MIXES SP-B SAC-B PG70-22
TON 86,840.000 $105.000 $85.390 $112.650 $112.000 $115.000 $107.000 $104.940
TACK COAT
GAL 30,984.000 $5.000 $4.290 $2.390 $4.750 $4.000 $7.000 $3.920
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 28,131.000 $55.000 $41.500 $42.430 $60.000 $50.000 $30.000 $64.530
PLAN & TEXT CONC PAV(0" TO 1.5")
SY 137,871.000 $3.000 $1.050 $0.670 $2.850 $2.000 $1.500 $1.820
CUT & RESTORING PAV
SY 874.000 $100.000 $190.000 $78.740 $47.000 $100.000 $175.000 $184.310
CEM STABIL BKFL
CY 539.000 $415.000 $210.000 $341.910 $200.000 $225.000 $375.000 $256.360
TEMPORARY SPL SHORING
SF 10,554.000 $35.000 $26.250 $0.120 $22.000 $20.000 $30.000 $25.640
DRILL SHAFT (SIGN MTS) (24 IN)
LF 32.000 $540.000 $336.000 $353.230 $315.000 $325.000 $375.000 $358.900
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 56.000 $450.000 $525.000 $551.920 $584.000 $500.000 $600.000 $640.890
CL B CONC (FLUME)
CY 5.000 $1,800.000 $945.000 $755.830 $735.000 $1,000.000 $1,850.000 $897.250
CLASS S CONC UTILITY PROTECTION PAD
CY 243.000 $1,000.000 $630.000 $917.280 $668.000 $875.000 $1,000.000 $1,466.100
RIPRAP (CONC)(5 IN)
CY 1,083.800 $1,500.000 $603.750 $725.060 $656.000 $600.000 $715.000 $822.370
RIPRAP (MOW STRIP)(4 IN)
CY 52.000 $1,000.000 $603.750 $938.270 $735.000 $750.000 $1,250.000 $1,089.510
CONC BOX CULV (3 FT X 2 FT)
LF 136.000 $430.000 $417.170 $361.840 $430.500 $400.000 $1,050.000 $528.930
CONC BOX CULV (5 FT X 3 FT)
LF 350.000 $700.000 $610.520 $468.710 $700.000 $600.000 $1,000.000 $856.870
CONC BOX CULV (6 FT X 3 FT)
LF 138.000 $800.000 $636.410 $605.070 $924.000 $800.000 $1,175.000 $1,133.220
CONC BOX CULV (7 FT X 3 FT)
LF 645.000 $900.000 $951.560 $733.480 $1,050.000 $1,000.000 $1,355.000 $1,287.630
CONC BOX CULV (10 FT X 6 FT)
LF 142.000 $2,000.000 $1,909.220 $1,257.720 $2,100.000 $1,700.000 $2,135.000 $2,314.850
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 200.000 $1,500.000 $992.670 $1,365.530 $945.000 $850.000 $1,550.000 $1,207.120
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 494.000 $1,600.000 $918.070 $788.480 $998.000 $950.000 $1,530.000 $1,241.350
CONC BOX CULV (10 FT X 6 FT)(EXTEND)
LF 100.000 $2,400.000 $1,196.690 $1,308.500 $1,470.000 $1,500.000 $2,300.000 $1,858.880
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $60,000.000 $53,432.140 $36,365.370 $73,500.000 $75,000.000 $50,000.000 $89,724.760
SET (TY I)(S= 3 FT)(HW= 3 FT)(4:1)(C)
EA 4.000 $10,000.000 $5,930.140 $11,580.510 $6,825.000 $6,500.000 $8,000.000 $9,613.370
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1)(C)
EA 7.000 $12,000.000 $8,856.380 $14,508.210 $6,983.000 $8,500.000 $12,000.000 $9,613.370
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1)(C)
EA 3.000 $14,000.000 $9,386.210 $17,885.180 $12,075.000 $9,000.000 $13,000.000 $14,740.500
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1)(C)
EA 8.000 $13,000.000 $7,614.020 $7,197.120 $6,825.000 $6,500.000 $8,000.000 $10,061.990
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1)(C)
EA 28.000 $13,500.000 $8,929.460 $8,902.820 $9,240.000 $7,500.000 $8,100.000 $11,279.680
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1)(C)
EA 12.000 $28,000.000 $11,073.140 $8,412.490 $11,550.000 $11,000.000 $16,000.000 $14,099.600
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1)(C)
EA 56.000 $18,700.000 $9,938.880 $6,079.880 $7,875.000 $7,000.000 $10,000.000 $9,613.370
SET (TY I)(S= 7 FT)(HW= 6 FT)(3:1)(C)
EA 36.000 $40,000.000 $10,056.110 $6,660.540 $13,125.000 $10,000.000 $12,000.000 $16,022.280
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000 $2,000.000 $2,169.560 $1,906.190 $1,260.000 $3,000.000 $2,000.000 $1,538.140
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 48.000 $3,500.000 $2,659.810 $2,157.040 $1,680.000 $3,250.000 $2,100.000 $2,050.850
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 4.000 $5,000.000 $7,380.330 $4,530.100 $4,935.000 $5,500.000 $5,500.000 $6,024.380
CLEAN EXIST CULVERTS
EA 31.000 $3,500.000 $2,625.000 $164.470 $3,675.000 $3,000.000 $1,645.000 $8,972.480
REMOV STR (WINGWALL)
EA 28.000 $1,500.000 $1,260.000 $1,486.610 $1,050.000 $5,000.000 $4,000.000 $4,445.490
REMOV STR (HEADWALL)
EA 6.000 $1,500.000 $1,260.000 $1,486.610 $525.000 $5,000.000 $3,500.000 $5,839.800
REMOV STR (PIPE)
LF 408.000 $200.000 $21.000 $29.150 $16.000 $50.000 $60.000 $31.060
MOBILIZATION
LS 1.000 $4,010,000.000 $1,500,000.000 $2,712,058.340 $3,000,000.000 $3,400,000.000 $3,706,000.000 $4,494,031.140
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $30,000.000 $15,000.000 $5,705.530 $25,000.000 $30,000.000 $80,000.000 $50,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $8,250.000 $4,842.530 $15,000.000 $17,000.000 $14,560.000 $23,449.240
TMA (STATIONARY)
DAY 400.000 $200.000 $50.000 $40.790 $170.000 $325.000 $240.000 $570.170
TMA (MOBILE OPERATION)
DAY 50.000 $470.000 $935.000 $575.240 $704.000 $325.000 $670.000 $1,101.110
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,600.000 $15.000 $5.550 $0.380 $47.000 $10.000 $45.000 $30.120
CONSTRUCTION EXITS (REMOVE)
SY 1,600.000 $10.000 $3.260 $0.380 $15.000 $5.000 $12.000 $10.820
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,300.000 $10.000 $7.650 $6.790 $6.000 $8.000 $8.000 $7.880
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,300.000 $2.000 $1.680 $1.160 $2.000 $2.000 $1.000 $1.350
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 8,400.000 $10.000 $13.350 $7.560 $10.000 $6.000 $9.000 $8.780
BIODEG EROSN CONT LOGS (REMOVE)
LF 8,400.000 $5.000 $2.100 $1.660 $2.000 $2.000 $1.500 $1.920
CONSTRUCTING DETOURS
SY 6,719.000 $70.000 $51.250 $36.110 $55.000 $50.000 $85.000 $63.640
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 8.000 $8,000.000 $4,410.000 $2,356.460 $5,000.000 $6,000.000 $11,000.000 $20,973.460
PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL)
LF 4,020.000 $30.000 $33.600 $0.450 $59.000 $40.000 $16.000 $39.620
PTB (MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 26,970.000 $15.000 $10.500 $0.250 $10.000 $20.000 $10.000 $10.810
PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 4,020.000 $25.000 $27.300 $0.510 $26.000 $25.000 $15.000 $7.140
CONC CURB (TY II)
LF 334.000 $75.000 $26.250 $58.360 $70.000 $15.000 $40.000 $102.540
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 97,384.000 $0.200 $0.190 $0.060 $0.280 $0.200 $0.150 $0.210
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 54,954.000 $0.200 $0.230 $0.060 $0.270 $0.200 $0.200 $0.210
MTL W-BEAM GD FEN (STEEL POST)
LF 2,175.000 $50.000 $35.180 $36.980 $40.000 $35.000 $40.000 $42.940
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,500.000 $3,202.500 $3,366.730 $3,600.000 $3,200.000 $3,600.000 $3,909.440
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 175.000 $100.000 $136.500 $143.500 $153.000 $140.000 $150.000 $166.630
REMOVE METAL BEAM GUARD FENCE
LF 3,311.000 $5.000 $5.250 $5.520 $6.000 $5.000 $6.000 $6.410
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $500.000 $525.000 $551.930 $587.000 $500.000 $600.000 $640.890
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,500.000 $3,412.500 $3,587.500 $3,818.000 $3,250.000 $3,750.000 $4,165.790
GUARDRAIL END TREATMENT (REMOVE)
EA 14.000 $500.000 $525.000 $551.920 $587.000 $500.000 $600.000 $640.890
CRASH CUSH ATTEN (MOVE & RESET)
EA 82.000 $4,000.000 $1,050.000 $103.950 $2,606.000 $1,800.000 $485.000 $1,012.770
CRASH CUSH ATTEN (REMOVE)
EA 10.000 $3,000.000 $840.000 $426.210 $3,052.000 $1,850.000 $370.000 $523.060
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 10.000 $5,500.000 $7,875.000 $639.310 $10,115.000 $8,500.000 $15,850.000 $8,862.740
REMOVE RD IL ASM (TRANS-BASE)
EA 6.000 $500.000 $577.500 $607.120 $642.000 $550.000 $625.000 $704.980
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 7.000 $10,000.000 $6,510.000 $6,843.840 $7,232.000 $6,500.000 $7,500.000 $7,947.050
CONDT (PVC) (SCH 40) (2")
LF 945.000 $20.000 $12.600 $13.250 $14.000 $13.000 $14.000 $15.380
CONDT (PVC) (SCH 40) (2") (BORE)
LF 220.000 $50.000 $36.750 $38.630 $41.000 $36.000 $40.000 $44.860
ELEC CONDR (NO.8) BARE
LF 1,215.000 $3.000 $1.840 $1.930 $2.000 $2.000 $2.000 $2.240
ELEC CONDR (NO.8) INSULATED
LF 2,430.000 $3.000 $2.100 $2.210 $2.300 $2.200 $2.500 $2.560
GROUND BOX TY A (122311)W/APRON
EA 4.000 $3,000.000 $1,837.500 $1,931.730 $2,042.000 $1,925.000 $2,000.000 $2,243.120
REMOVE GROUND BOX
EA 1.000 $1,000.000 $525.000 $551.920 $584.000 $500.000 $575.000 $640.890
ALUMINUM SIGNS (TY G)
SF 266.500 $30.000 $35.220 $37.020 $36.000 $34.000 $40.000 $41.020
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $1,000.000 $757.050 $795.870 $953.000 $750.000 $800.000 $1,089.510
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 47.000 $1,100.000 $904.050 $950.410 $1,066.000 $900.000 $950.000 $1,217.690
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 7.000 $1,500.000 $1,215.900 $1,278.250 $1,110.000 $1,200.000 $1,300.000 $1,268.960
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $1,800.000 $2,040.150 $2,144.770 $1,795.000 $1,950.000 $2,250.000 $2,050.850
REMOVE SM RD SN SUP&AM
EA 40.000 $200.000 $105.000 $88.370 $112.000 $100.000 $175.000 $128.180
INSTALL LRSS (STRUCT STEEL)
LB 1,858.800 $5.000 $7.770 $8.170 $10.000 $7.500 $9.000 $11.410
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 31.000 $45.000 $47.250 $49.670 $53.000 $45.000 $53.000 $57.680
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 27.000 $100.000 $84.000 $88.310 $95.000 $80.000 $90.000 $108.950
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 40.000 $110.000 $89.250 $93.830 $95.000 $85.000 $92.000 $108.950
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 12.000 $150.000 $89.250 $93.830 $95.000 $85.000 $92.000 $108.950
REMOVE DELIN & OBJECT MARKER ASSMS
EA 48.000 $30.000 $43.500 $29.460 $22.000 $20.000 $30.000 $25.640
WK ZN PAV MRK NON-REMOV (W)6"(LNDP)
LF 698.000 $0.500 $2.100 $2.210 $2.110 $0.500 $0.400 $0.420
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 19,480.000 $0.300 $0.300 $0.320 $0.310 $0.350 $0.200 $0.240
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,320.000 $10.000 $0.410 $0.430 $0.410 $0.500 $0.450 $0.510
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 261,050.000 $0.300 $0.200 $0.210 $0.200 $0.350 $0.200 $0.240
WK ZN PAV MRK REMOV (REFL) TY I-C
LF 132.000 $10.000 $7.350 $7.730 $7.390 $10.000 $4.000 $4.490
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 3,978.000 $7.000 $4.730 $4.970 $4.750 $5.000 $4.000 $4.490
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 8,924.000 $0.600 $0.140 $0.140 $0.140 $1.000 $0.250 $0.270
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 222,990.000 $0.600 $0.200 $0.210 $0.200 $0.600 $0.250 $0.240
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 192.000 $25.000 $15.750 $16.560 $15.850 $19.000 $18.000 $18.590
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,782.000 $2.000 $2.000 $1.630 $1.100 $1.000 $1.250 $2.560
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 47,928.000 $2.000 $2.000 $1.640 $1.100 $1.000 $1.250 $2.560
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 1,054.000 $1.000 $2.100 $2.210 $2.110 $1.000 $1.500 $1.670
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
LF 1,353.000 $1.000 $1.580 $1.660 $1.580 $1.000 $1.000 $1.030
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 937.000 $2.000 $1.260 $1.320 $1.270 $1.000 $1.750 $1.790
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 470.000 $10.000 $3.680 $3.860 $3.700 $5.000 $3.500 $3.850
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 556,592.000 $1.000 $0.760 $0.370 $0.760 $1.100 $0.900 $1.100
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 556,685.000 $1.000 $0.760 $0.370 $0.760 $1.100 $0.900 $1.100
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 8,576.000 $1.000 $0.680 $0.720 $0.690 $0.750 $0.750 $0.830
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 101,257.000 $1.000 $0.580 $0.610 $0.580 $0.700 $0.750 $0.810
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 111,447.000 $1.000 $0.580 $0.610 $0.580 $0.700 $0.750 $0.810
PREFAB PM TY B (W)(24")(SLD)
LF 75.000 $30.000 $14.700 $15.450 $15.000 $15.000 $25.000 $28.200
PREFAB PM TY B (W)(LN RDCT ARROW)
EA 8.000 $700.000 $630.000 $662.310 $634.000 $550.000 $650.000 $769.070
REFL PAV MRKR TY I-C
EA 536.000 $8.000 $4.730 $4.970 $4.750 $6.000 $6.000 $7.050
REFL PAV MRKR TY II-A-A
EA 1,931.000 $5.000 $3.940 $4.140 $3.960 $5.000 $6.000 $7.050
ELIM EXT PM & MRKS (4")
LF 50,010.000 $0.500 $0.490 $0.450 $0.720 $1.000 $0.250 $1.170
ELIM EXT PM & MRKS (6")
LF 470,802.000 $0.500 $0.490 $0.440 $0.690 $0.750 $0.250 $0.740
BONDING COURSE
GAL 61,661.000 $5.000 $2.550 $0.240 $4.860 $4.000 $5.500 $5.340
1
STONE-MTRX-ASPH SMAR-F SAC-A
TON 25,564.000 $150.000 $127.000 $147.000 $0.000 $0.000 $138.000 $0.000
1A
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 25,564.000 $150.000 $0.000 $0.000 $150.000 $150.000 $0.000 $156.650
2
RC PIPE (CL III)(18 IN)
LF 316.000 $90.000 $0.000 $73.120 $0.000 $0.000 $175.000 $0.000
2A
THERMOPLASTIC PIPE (PP) (18")
LF 316.000 $90.000 $77.730 $0.000 $157.670 $85.000 $0.000 $94.340
3
RC PIPE (CL III)(24 IN)
LF 1,524.000 $150.000 $0.000 $127.530 $0.000 $0.000 $225.000 $0.000
3A
THERMOPLASTIC PIPE (PP) (24")
LF 1,524.000 $150.000 $93.740 $0.000 $209.390 $95.000 $0.000 $121.290
4
RC PIPE (CL III)(36 IN)
LF 144.000 $230.000 $0.000 $164.960 $0.000 $0.000 $345.000 $0.000
4A
THERMOPLASTIC PIPE (PP) (36")
LF 144.000 $230.000 $146.310 $0.000 $371.040 $160.000 $0.000 $188.670
Totals: $44,089,570.200 $26,858,499.316 $28,265,792.574 $34,382,889.440 $34,480,274.980 $37,066,726.900 $38,593,349.914
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $20,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $50,000.00
Total: $70,000.00