PREPARING ROW
|
STA
|
179.000
|
$3,500.000
|
$50,280.000
|
$53,600.000
|
$55,000.000
|
$63,032.000
|
$75,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
57,938.000
|
$23.000
|
$9.000
|
$8.000
|
$10.000
|
$13.700
|
$18.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
602.000
|
$150.000
|
$75.000
|
$50.000
|
$11.000
|
$105.000
|
$108.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,093.000
|
$25.000
|
$10.000
|
$15.000
|
$19.000
|
$27.500
|
$21.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
962.000
|
$15.000
|
$3.000
|
$1.000
|
$4.000
|
$4.900
|
$4.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
137.000
|
$50.000
|
$12.000
|
$10.000
|
$9.000
|
$37.000
|
$26.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
7,000.000
|
$13.000
|
$6.000
|
$2.500
|
$9.000
|
$8.550
|
$8.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-12")
|
SY
|
52,674.000
|
$12.000
|
$4.000
|
$7.000
|
$9.000
|
$16.900
|
$12.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
21,029.000
|
$40.000
|
$2.000
|
$5.000
|
$17.000
|
$2.700
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
415,327.000
|
$25.000
|
$13.050
|
$8.000
|
$14.000
|
$12.000
|
$19.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
43,214.000
|
$27.000
|
$14.000
|
$15.000
|
$11.000
|
$12.000
|
$3.700
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
503,395.000
|
$3.000
|
$2.300
|
$1.250
|
$2.000
|
$2.500
|
$1.500
|
|
|
BLOCK SODDING
|
SY
|
13,562.000
|
$10.000
|
$6.550
|
$7.500
|
$7.000
|
$6.650
|
$8.530
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
503,395.000
|
$0.300
|
$0.170
|
$0.200
|
$0.180
|
$0.150
|
$0.170
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
251,703.000
|
$0.250
|
$0.130
|
$0.150
|
$0.140
|
$0.150
|
$0.130
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
251,703.000
|
$0.250
|
$0.140
|
$0.140
|
$0.150
|
$0.150
|
$0.140
|
|
|
VEGETATIVE WATERING
|
MG
|
17,768.000
|
$30.000
|
$28.000
|
$25.000
|
$20.000
|
$17.000
|
$41.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
12,163.000
|
$2.500
|
$1.560
|
$1.580
|
$1.700
|
$1.600
|
$1.560
|
|
|
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
|
CY
|
17,736.000
|
$100.000
|
$63.000
|
$44.240
|
$62.000
|
$55.250
|
$52.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
3,347.000
|
$300.000
|
$325.000
|
$319.000
|
$370.000
|
$404.000
|
$347.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
200,786.000
|
$8.000
|
$4.250
|
$3.500
|
$4.500
|
$5.750
|
$2.050
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
91,071.000
|
$7.000
|
$6.150
|
$4.700
|
$7.000
|
$5.350
|
$6.260
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
195,482.000
|
$3.500
|
$1.000
|
$2.500
|
$2.500
|
$2.400
|
$3.150
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
112,056.000
|
$160.000
|
$100.000
|
$160.000
|
$104.000
|
$110.000
|
$110.000
|
|
|
CONC PVMT(CRCP)(TRANSITION SLAB)
|
SY
|
258.000
|
$250.000
|
$350.000
|
$200.000
|
$200.000
|
$389.000
|
$130.000
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
2,112.000
|
$50.000
|
$19.000
|
$10.000
|
$33.000
|
$1.000
|
$1.000
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
13,263.000
|
$35.000
|
$16.500
|
$15.000
|
$33.000
|
$1.000
|
$1.000
|
|
|
CEM STABIL BKFL
|
CY
|
728.000
|
$250.000
|
$200.000
|
$150.000
|
$395.000
|
$153.000
|
$150.000
|
|
|
CUT & RESTORING PAV
|
SY
|
286.000
|
$130.000
|
$150.000
|
$500.000
|
$67.000
|
$458.000
|
$450.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
16,219.000
|
$18.000
|
$5.000
|
$2.000
|
$4.500
|
$1.000
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
30,230.000
|
$35.000
|
$50.000
|
$40.000
|
$52.000
|
$27.300
|
$15.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
58.000
|
$500.000
|
$760.000
|
$500.000
|
$565.000
|
$899.000
|
$758.040
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
198.000
|
$600.000
|
$815.000
|
$525.000
|
$700.000
|
$998.000
|
$810.540
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
86.000
|
$700.000
|
$950.000
|
$875.000
|
$708.000
|
$1,190.000
|
$905.790
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
24.000
|
$300.000
|
$600.000
|
$215.000
|
$231.000
|
$250.000
|
$573.840
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
376.000
|
$300.000
|
$362.000
|
$375.000
|
$391.000
|
$244.000
|
$745.720
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
122.000
|
$800.000
|
$700.000
|
$1,000.000
|
$667.000
|
$555.000
|
$2,000.000
|
|
|
CL C CONC (VEH DEFL WALL)
|
CY
|
140.410
|
$1,000.000
|
$1,250.000
|
$850.000
|
$1,000.000
|
$1,100.000
|
$1,170.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
3,668.000
|
$70.000
|
$90.000
|
$70.000
|
$100.000
|
$107.000
|
$80.000
|
|
|
RETAINING WALL (SPREAD FOOTING)
|
SF
|
4,918.000
|
$75.000
|
$110.000
|
$200.000
|
$88.000
|
$119.000
|
$92.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2,329.000
|
$700.000
|
$450.000
|
$283.110
|
$520.000
|
$511.000
|
$400.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
136.000
|
$250.000
|
$175.000
|
$153.460
|
$190.000
|
$269.000
|
$321.430
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
111.000
|
$200.000
|
$200.000
|
$145.130
|
$200.000
|
$262.000
|
$296.680
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
612.000
|
$650.000
|
$600.000
|
$84.120
|
$700.000
|
$532.000
|
$630.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
17.000
|
$700.000
|
$700.000
|
$480.710
|
$1,300.000
|
$628.000
|
$690.000
|
|
|
RIPRAP (MOW STRIP)(6 IN)
|
CY
|
877.000
|
$750.000
|
$725.000
|
$278.680
|
$610.000
|
$516.000
|
$650.000
|
|
|
RAIL (TY SSTR)
|
LF
|
2,257.000
|
$120.000
|
$55.000
|
$85.640
|
$90.000
|
$69.500
|
$85.000
|
|
|
RAIL (TY T80SS)
|
LF
|
301.000
|
$120.000
|
$120.000
|
$157.170
|
$260.000
|
$398.000
|
$125.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
550.000
|
$120.000
|
$65.000
|
$126.070
|
$106.000
|
$63.000
|
$90.000
|
|
|
RAIL (TY PR11)
|
LF
|
1,305.000
|
$120.000
|
$125.000
|
$131.410
|
$132.000
|
$101.000
|
$110.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
1,047.000
|
$475.000
|
$290.000
|
$300.000
|
$382.000
|
$377.000
|
$360.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
580.000
|
$525.000
|
$375.000
|
$400.000
|
$452.000
|
$482.000
|
$420.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
35.000
|
$650.000
|
$400.000
|
$500.000
|
$502.000
|
$473.000
|
$450.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
30.000
|
$700.000
|
$500.000
|
$550.000
|
$580.000
|
$577.000
|
$550.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
104.000
|
$120.000
|
$115.000
|
$100.000
|
$76.000
|
$144.000
|
$140.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
10,689.000
|
$130.000
|
$120.000
|
$150.000
|
$110.000
|
$166.000
|
$160.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
2,421.000
|
$150.000
|
$142.000
|
$170.000
|
$135.000
|
$192.000
|
$185.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
4,615.000
|
$200.000
|
$180.000
|
$190.000
|
$160.000
|
$224.000
|
$215.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
954.000
|
$250.000
|
$240.000
|
$210.000
|
$200.000
|
$272.000
|
$260.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
56.000
|
$300.000
|
$280.000
|
$350.000
|
$270.000
|
$314.000
|
$300.000
|
|
|
RC PIPE (CL V)(24 IN)
|
LF
|
161.000
|
$150.000
|
$155.000
|
$125.000
|
$225.000
|
$184.000
|
$175.000
|
|
|
INLET (COMPL)(CO)(10 FT)(FTW)
|
EA
|
93.000
|
$12,000.000
|
$12,300.000
|
$21,000.000
|
$10,000.000
|
$12,730.000
|
$11,000.000
|
|
|
INLET (COMPL)(COB-C)(10 FT)(FTW)
|
EA
|
1.000
|
$9,500.000
|
$16,500.000
|
$22,000.000
|
$12,800.000
|
$19,860.000
|
$18,000.000
|
|
|
INLET (COMPL)(FGS2)(FTW)
|
EA
|
1.000
|
$9,500.000
|
$15,700.000
|
$18,000.000
|
$10,000.000
|
$16,800.000
|
$15,000.000
|
|
|
INLT (COMPL)(AD)(4'X 4'-3' X 3')(FTW)
|
EA
|
3.000
|
$8,500.000
|
$8,000.000
|
$9,000.000
|
$7,700.000
|
$7,640.000
|
$7,500.000
|
|
|
INLT (COMPL)(AD)(5'X 5'-3' X 3')(FTW)
|
EA
|
2.000
|
$9,500.000
|
$8,300.000
|
$10,000.000
|
$8,600.000
|
$8,150.000
|
$8,000.000
|
|
|
INLT (COMPL)(AD)(6'X 6'-3' X 3')(FTW)
|
EA
|
1.000
|
$11,000.000
|
$10,500.000
|
$12,000.000
|
$13,000.000
|
$12,220.000
|
$12,000.000
|
|
|
INLT (COMPL)(AD)(7'X 4'-3' X 3')(FTW)
|
EA
|
1.000
|
$11,000.000
|
$26,800.000
|
$13,000.000
|
$14,000.000
|
$20,370.000
|
$20,000.000
|
|
|
INLET (COMPL)(AD-2)(FTW)
|
EA
|
37.000
|
$8,000.000
|
$12,500.000
|
$18,000.000
|
$8,000.000
|
$10,180.000
|
$10,000.000
|
|
|
MANH (COMPL)(TY SD)(5'X 3'-3'X 3')(FTW)
|
EA
|
2.000
|
$8,000.000
|
$12,000.000
|
$9,500.000
|
$8,100.000
|
$9,170.000
|
$9,000.000
|
|
|
JUNCT BOX (COMPL)(JB)(4FT X 4FT)(FTW)
|
EA
|
4.000
|
$7,500.000
|
$7,800.000
|
$10,000.000
|
$6,000.000
|
$5,090.000
|
$5,000.000
|
|
|
JUNCT BOX (COMPL)(JB)(7FT X 4FT)(FTW)
|
EA
|
1.000
|
$10,500.000
|
$13,000.000
|
$20,000.000
|
$15,000.000
|
$12,220.000
|
$12,000.000
|
|
|
JUNCT BOX (COMPL)(JB)(7FT X 7FT)(FTW)
|
EA
|
1.000
|
$18,000.000
|
$17,500.000
|
$25,000.000
|
$25,000.000
|
$20,370.000
|
$20,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
4.000
|
$7,000.000
|
$2,800.000
|
$5,000.000
|
$9,000.000
|
$3,060.000
|
$3,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$9,000.000
|
$4,050.000
|
$7,000.000
|
$12,500.000
|
$5,090.000
|
$5,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 42 IN)
|
EA
|
1.000
|
$11,000.000
|
$5,000.000
|
$8,500.000
|
$15,000.000
|
$6,110.000
|
$6,000.000
|
|
|
HEADWALL (CH - FW - 30) (DIA= 24 IN)
|
EA
|
1.000
|
$7,000.000
|
$2,500.000
|
$6,000.000
|
$10,000.000
|
$2,550.000
|
$2,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$7,500.000
|
$6,500.000
|
$9,500.000
|
$11,000.000
|
$8,150.000
|
$8,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
2.000
|
$8,500.000
|
$4,700.000
|
$8,500.000
|
$9,200.000
|
$5,090.000
|
$5,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
1.000
|
$20,000.000
|
$9,500.000
|
$18,000.000
|
$15,000.000
|
$10,180.000
|
$10,000.000
|
|
|
WINGWALL (FW - S) (HW=4 FT)
|
EA
|
1.000
|
$15,500.000
|
$6,500.000
|
$20,000.000
|
$29,000.000
|
$8,150.000
|
$8,000.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
4.000
|
$20,000.000
|
$9,400.000
|
$22,000.000
|
$31,000.000
|
$10,180.000
|
$10,000.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
1.000
|
$30,000.000
|
$25,500.000
|
$50,000.000
|
$37,500.000
|
$30,550.000
|
$30,000.000
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
1.000
|
$35,000.000
|
$76,500.000
|
$125,000.000
|
$83,000.000
|
$81,517.600
|
$80,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,000.000
|
$2,000.000
|
$2,000.000
|
$2,700.000
|
$2,040.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,000.000
|
$2,100.000
|
$3,000.000
|
$2,800.000
|
$2,040.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$2,300.000
|
$2,400.000
|
$3,100.000
|
$3,200.000
|
$2,040.000
|
$2,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,800.000
|
$2,600.000
|
$3,300.000
|
$4,200.000
|
$3,560.000
|
$3,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$3,600.000
|
$2,900.000
|
$3,800.000
|
$4,700.000
|
$4,070.000
|
$4,000.000
|
|
|
JACK BOR OR TUN PIPE(24 IN)(RC)(CL III)
|
LF
|
134.000
|
$1,100.000
|
$1,600.000
|
$2,000.000
|
$1,500.000
|
$687.000
|
$640.000
|
|
|
JACK BOR OR TUN PIPE(24 IN)(RC)(CL V)
|
LF
|
94.000
|
$1,150.000
|
$1,625.000
|
$2,000.000
|
$1,520.000
|
$672.000
|
$650.000
|
|
|
JACK BOR OR TUN PIPE(30 IN)(RC)(CL III)
|
LF
|
203.000
|
$1,350.000
|
$1,600.000
|
$2,500.000
|
$1,700.000
|
$952.000
|
$900.000
|
|
|
JACK BOR OR TUN PIPE(36 IN)(RC)(CL III)
|
LF
|
225.000
|
$1,500.000
|
$1,650.000
|
$3,000.000
|
$3,200.000
|
$1,180.000
|
$1,100.000
|
|
|
JACK BOR OR TUN PIPE(42 IN)(RC)(CL III)
|
LF
|
125.000
|
$1,800.000
|
$1,700.000
|
$3,500.000
|
$3,500.000
|
$1,270.000
|
$1,200.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$2,000.000
|
$7,500.000
|
$3,000.000
|
$3,000.000
|
$13,970.000
|
$10,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
23.000
|
$1,000.000
|
$1,900.000
|
$1,000.000
|
$1,200.000
|
$1,020.000
|
$1,000.000
|
|
|
REMOV STR (SET)
|
EA
|
15.000
|
$600.000
|
$700.000
|
$750.000
|
$1,000.000
|
$1,020.000
|
$1,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
9.000
|
$2,000.000
|
$1,100.000
|
$1,500.000
|
$6,500.000
|
$2,040.000
|
$2,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$2,000.000
|
$1,200.000
|
$1,500.000
|
$4,500.000
|
$2,040.000
|
$2,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
3,100.000
|
$25.000
|
$24.000
|
$30.000
|
$40.000
|
$51.000
|
$50.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
14.000
|
$110.000
|
$45.000
|
$100.000
|
$300.000
|
$102.000
|
$100.000
|
|
|
REMOV STR (DRILL SHAFT)
|
EA
|
8.000
|
$10,000.000
|
$450.000
|
$2,000.000
|
$2,600.000
|
$2,160.000
|
$2,685.350
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$10,000,000.000
|
$12,621,355.000
|
$10,700,000.000
|
$10,500,000.000
|
$11,282,900.000
|
$15,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
39.000
|
$10,000.000
|
$25,000.000
|
$20,000.000
|
$38,000.000
|
$229,604.000
|
$308,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
454.000
|
$40.000
|
$29.000
|
$55.000
|
$48.000
|
$45.000
|
$166.390
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
454.000
|
$12.000
|
$12.000
|
$15.000
|
$15.000
|
$14.800
|
$56.120
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
780.000
|
$30.000
|
$32.000
|
$45.000
|
$33.000
|
$32.500
|
$31.810
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
780.000
|
$10.000
|
$15.000
|
$10.000
|
$11.000
|
$10.700
|
$10.550
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,755.000
|
$4.000
|
$3.000
|
$15.000
|
$10.000
|
$9.250
|
$9.080
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,755.000
|
$1.000
|
$1.000
|
$2.500
|
$3.000
|
$2.800
|
$2.740
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,943.000
|
$6.000
|
$4.600
|
$15.000
|
$10.000
|
$9.350
|
$9.200
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,943.000
|
$1.300
|
$1.000
|
$2.500
|
$3.000
|
$2.800
|
$2.740
|
|
|
CONSTRUCTING DETOURS
|
SY
|
94,450.000
|
$95.000
|
$71.000
|
$70.000
|
$67.000
|
$65.300
|
$40.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
41,320.000
|
$65.000
|
$48.000
|
$51.000
|
$85.000
|
$60.000
|
$120.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
19,520.000
|
$55.000
|
$43.000
|
$50.000
|
$75.000
|
$52.500
|
$120.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
180.000
|
$65.000
|
$91.000
|
$50.000
|
$75.000
|
$76.750
|
$120.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
133,880.000
|
$14.000
|
$5.500
|
$2.500
|
$11.000
|
$6.900
|
$8.500
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
41,100.000
|
$9.000
|
$4.000
|
$3.000
|
$6.000
|
$7.950
|
$6.500
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
400.000
|
$10.000
|
$17.500
|
$3.000
|
$9.000
|
$24.600
|
$6.500
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
41,320.000
|
$15.000
|
$8.250
|
$5.750
|
$12.000
|
$15.200
|
$12.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
19,520.000
|
$18.000
|
$7.250
|
$4.440
|
$13.000
|
$10.900
|
$10.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
180.000
|
$25.000
|
$75.000
|
$4.510
|
$14.000
|
$20.500
|
$10.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
20,905.000
|
$105.000
|
$76.000
|
$130.000
|
$117.000
|
$78.250
|
$110.000
|
|
|
PERM CTB (SSCB)(TY 1)(MOD)
|
LF
|
105.000
|
$140.000
|
$112.000
|
$460.000
|
$300.000
|
$365.000
|
$225.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
41,196.000
|
$15.000
|
$3.000
|
$8.000
|
$4.680
|
$4.450
|
$4.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,662.000
|
$120.000
|
$140.000
|
$125.000
|
$200.000
|
$176.000
|
$165.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
31,601.000
|
$100.000
|
$72.000
|
$125.000
|
$70.000
|
$65.750
|
$50.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
1.000
|
$2,500.000
|
$3,500.000
|
$2,000.000
|
$2,500.000
|
$3,130.000
|
$2,650.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
3.000
|
$3,000.000
|
$3,500.000
|
$2,000.000
|
$2,500.000
|
$3,370.000
|
$1,750.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
2.000
|
$3,500.000
|
$5,000.000
|
$3,000.000
|
$4,500.000
|
$4,380.000
|
$4,425.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
8,473.000
|
$30.000
|
$18.580
|
$19.020
|
$23.000
|
$18.900
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$2,000.000
|
$1,785.000
|
$1,827.590
|
$2,000.000
|
$1,820.000
|
$2,648.290
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
2.000
|
$1,500.000
|
$1,291.000
|
$1,321.810
|
$1,100.000
|
$1,310.000
|
$1,548.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
27.000
|
$1,500.000
|
$1,039.000
|
$1,063.790
|
$1,300.000
|
$1,060.000
|
$1,255.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,000.000
|
$8.000
|
$1.750
|
$5.060
|
$2.700
|
$1.800
|
$3.400
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$300.000
|
$175.000
|
$202.290
|
$220.000
|
$178.000
|
$220.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
6.000
|
$250.000
|
$200.000
|
$202.290
|
$220.000
|
$204.000
|
$230.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
6.000
|
$3,500.000
|
$1,600.000
|
$1,500.000
|
$5,300.000
|
$4,580.000
|
$4,800.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
17,900.000
|
$5.000
|
$2.000
|
$2.440
|
$7.200
|
$7.650
|
$4.600
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
30.000
|
$3,300.000
|
$2,688.000
|
$2,752.140
|
$3,000.000
|
$2,740.000
|
$2,895.700
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
17.000
|
$1,800.000
|
$1,275.000
|
$2,442.500
|
$2,600.000
|
$1,300.000
|
$1,635.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
15.000
|
$1,300.000
|
$1,145.000
|
$1,820.080
|
$1,600.000
|
$708.000
|
$800.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
15.000
|
$9,000.000
|
$7,690.000
|
$8,226.920
|
$12,000.000
|
$7,530.000
|
$8,005.000
|
|
|
CRASH CUSHION ATTEN (INSTALL) (QUAD)(N)
|
EA
|
7.000
|
$30,000.000
|
$27,000.000
|
$23,852.700
|
$28,000.000
|
$27,550.000
|
$26,900.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
4.000
|
$390.000
|
$350.000
|
$225.000
|
$280.000
|
$623.000
|
$310.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$420.000
|
$355.000
|
$374.990
|
$290.000
|
$364.000
|
$315.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
10.000
|
$1,000.000
|
$2,543.630
|
$1,411.170
|
$2,700.000
|
$599.000
|
$825.950
|
|
|
REPLACE LUMINAIRE W/LED (250W EQ)
|
EA
|
6.000
|
$700.000
|
$1,417.800
|
$1,411.170
|
$1,600.000
|
$658.000
|
$561.720
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
16.000
|
$1,600.000
|
$2,529.600
|
$2,517.770
|
$2,700.000
|
$1,440.000
|
$1,164.510
|
|
|
IN RD IL (TY SA) 40T-12 (250W EQ) LED
|
EA
|
47.000
|
$5,000.000
|
$5,528.400
|
$5,502.540
|
$6,000.000
|
$4,840.000
|
$4,899.190
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
18,566.000
|
$18.000
|
$10.350
|
$10.300
|
$11.000
|
$20.300
|
$20.460
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
4,130.000
|
$25.000
|
$12.240
|
$12.180
|
$13.000
|
$16.000
|
$22.390
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
850.000
|
$25.000
|
$25.500
|
$25.380
|
$27.000
|
$24.100
|
$24.370
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
3,324.000
|
$30.000
|
$33.660
|
$33.500
|
$34.000
|
$39.750
|
$31.340
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
2,100.000
|
$35.000
|
$45.900
|
$45.690
|
$46.000
|
$24.200
|
$39.840
|
|
|
CONDT (RM) (1")
|
LF
|
1,013.000
|
$25.000
|
$31.620
|
$31.470
|
$33.000
|
$25.000
|
$24.730
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
15,817.000
|
$1.600
|
$1.110
|
$1.020
|
$1.200
|
$0.750
|
$1.300
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
31,634.000
|
$2.000
|
$1.230
|
$1.220
|
$1.300
|
$0.800
|
$1.430
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
27,793.000
|
$2.200
|
$1.820
|
$1.810
|
$1.900
|
$1.050
|
$1.840
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
4,224.000
|
$2.400
|
$1.930
|
$1.920
|
$2.000
|
$1.550
|
$2.130
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
2,520.000
|
$2.100
|
$2.130
|
$2.120
|
$2.200
|
$1.750
|
$1.830
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
410.000
|
$2.500
|
$2.190
|
$2.180
|
$2.200
|
$3.800
|
$2.330
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
231.000
|
$2.700
|
$2.920
|
$2.900
|
$2.900
|
$6.050
|
$2.370
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
681.000
|
$3.100
|
$3.000
|
$2.980
|
$3.000
|
$3.600
|
$3.190
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
421.000
|
$3.500
|
$3.270
|
$3.260
|
$3.400
|
$5.500
|
$3.380
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
1,263.000
|
$4.200
|
$3.570
|
$3.550
|
$3.600
|
$4.950
|
$3.650
|
|
|
ELEC CONDR (NO.2/0) BARE
|
LF
|
5,662.000
|
$4.100
|
$3.720
|
$3.710
|
$4.000
|
$7.000
|
$5.370
|
|
|
ELEC CONDR (NO.2/0) INSULATED
|
LF
|
11,324.000
|
$4.600
|
$3.950
|
$3.930
|
$4.100
|
$8.000
|
$6.940
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
19.000
|
$1,200.000
|
$1,071.000
|
$1,065.990
|
$1,100.000
|
$2,280.000
|
$1,468.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
1.000
|
$1,200.000
|
$1,764.600
|
$1,756.350
|
$1,800.000
|
$1,900.000
|
$953.290
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
31.000
|
$1,500.000
|
$1,723.800
|
$1,715.740
|
$1,900.000
|
$2,540.000
|
$1,885.450
|
|
|
RELOCATE ELECTRICAL SERVICES
|
EA
|
2.000
|
$1,350.000
|
$2,193.000
|
$2,182.740
|
$2,400.000
|
$7,470.000
|
$3,219.910
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$9,000.000
|
$10,689.600
|
$10,639.600
|
$11,000.000
|
$9,950.000
|
$8,404.820
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(U)
|
EA
|
1.000
|
$8,500.000
|
$10,077.600
|
$10,030.460
|
$10,000.000
|
$11,520.000
|
$8,244.260
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$7,000.000
|
$10,353.000
|
$10,304.570
|
$11,000.000
|
$9,090.000
|
$6,886.540
|
|
|
ELC SRV TY D 120/240 070(NS)SS(N)SP(O)
|
EA
|
6.000
|
$9,000.000
|
$9,169.800
|
$9,126.900
|
$9,500.000
|
$8,240.000
|
$6,832.020
|
|
|
ELC SRV TY D 120/240 070(NS)SS(N)SP(U)
|
EA
|
2.000
|
$7,000.000
|
$9,771.600
|
$9,725.890
|
$10,500.000
|
$9,690.000
|
$6,672.450
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
110.000
|
$35.000
|
$39.530
|
$39.340
|
$40.000
|
$29.600
|
$27.900
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
376.000
|
$35.000
|
$43.860
|
$43.650
|
$45.000
|
$34.500
|
$43.400
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
4,738.000
|
$32.000
|
$36.290
|
$36.120
|
$37.000
|
$31.500
|
$34.570
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
57.000
|
$750.000
|
$683.400
|
$680.200
|
$700.000
|
$896.000
|
$975.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
51.000
|
$900.000
|
$600.780
|
$699.490
|
$750.000
|
$873.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$950.000
|
$731.340
|
$727.920
|
$780.000
|
$1,050.000
|
$1,550.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
7.000
|
$1,100.000
|
$1,009.290
|
$1,004.570
|
$1,000.000
|
$1,130.000
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,100.000
|
$1,120.620
|
$1,115.380
|
$1,100.000
|
$1,190.000
|
$1,900.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
6.000
|
$1,600.000
|
$1,212.780
|
$1,207.110
|
$1,300.000
|
$2,120.000
|
$3,200.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
4.000
|
$2,600.000
|
$2,835.600
|
$2,822.340
|
$3,000.000
|
$2,680.000
|
$4,500.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
4.000
|
$2,500.000
|
$3,213.000
|
$3,197.970
|
$3,200.000
|
$2,650.000
|
$4,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
80.000
|
$160.000
|
$75.000
|
$157.360
|
$165.000
|
$139.000
|
$380.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,471.000
|
$10.000
|
$8.160
|
$8.120
|
$8.500
|
$8.950
|
$20.610
|
|
|
INS OH SN SUP(25 FT CANT)
|
EA
|
1.000
|
$40,000.000
|
$44,033.400
|
$43,827.410
|
$45,000.000
|
$39,390.000
|
$41,893.240
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
5.000
|
$45,000.000
|
$48,327.600
|
$48,101.520
|
$49,000.000
|
$44,380.000
|
$47,040.200
|
|
|
INS OH SN SUP(35 FT BAL TEE)
|
EA
|
2.000
|
$60,000.000
|
$46,889.400
|
$46,670.050
|
$47,000.000
|
$58,900.000
|
$68,755.680
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
1.000
|
$50,000.000
|
$47,134.200
|
$46,913.710
|
$48,000.000
|
$48,110.000
|
$52,881.390
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
2.000
|
$55,000.000
|
$49,245.600
|
$49,015.230
|
$50,000.000
|
$57,400.000
|
$60,032.340
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
4.000
|
$8,000.000
|
$6,721.800
|
$6,690.360
|
$7,000.000
|
$4,670.000
|
$8,054.430
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
33.000
|
$1,300.000
|
$1,917.600
|
$1,908.630
|
$2,000.000
|
$1,740.000
|
$1,288.710
|
|
|
SIGN WALKWAY (48 IN) WITH HNDRL
|
LF
|
10.000
|
$1,000.000
|
$867.000
|
$862.940
|
$900.000
|
$1,510.000
|
$1,628.290
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
49.000
|
$25.000
|
$13.000
|
$35.530
|
$21.000
|
$35.750
|
$24.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
162.000
|
$30.000
|
$15.000
|
$35.530
|
$21.000
|
$35.750
|
$24.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
87.000
|
$25.000
|
$13.000
|
$35.530
|
$21.000
|
$35.750
|
$24.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
41.000
|
$25.000
|
$15.000
|
$35.530
|
$21.000
|
$35.750
|
$24.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
100.000
|
$80.000
|
$55.000
|
$52.790
|
$46.000
|
$53.000
|
$52.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
12.000
|
$90.000
|
$65.000
|
$52.790
|
$83.000
|
$53.000
|
$58.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
101,620.000
|
$1.500
|
$0.900
|
$0.930
|
$1.000
|
$1.250
|
$0.900
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
136.000
|
$2.000
|
$1.000
|
$1.030
|
$1.100
|
$5.100
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
106,505.000
|
$1.300
|
$0.900
|
$0.930
|
$1.000
|
$1.100
|
$0.900
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
920.000
|
$2.000
|
$1.000
|
$1.030
|
$1.100
|
$2.550
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
101,630.000
|
$1.250
|
$0.900
|
$0.930
|
$0.900
|
$1.100
|
$0.900
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
12,045.000
|
$2.000
|
$1.920
|
$1.520
|
$1.100
|
$1.950
|
$2.180
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
12,705.000
|
$2.000
|
$2.740
|
$1.520
|
$1.100
|
$2.750
|
$2.100
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
469.000
|
$1.800
|
$2.000
|
$2.070
|
$2.100
|
$2.050
|
$2.000
|
|
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
|
LF
|
702.000
|
$2.200
|
$2.000
|
$2.070
|
$2.100
|
$1.900
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
19,942.000
|
$1.500
|
$2.280
|
$2.360
|
$2.500
|
$1.350
|
$2.280
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
10,206.000
|
$5.000
|
$2.750
|
$2.840
|
$3.000
|
$5.100
|
$2.750
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
597.000
|
$10.000
|
$5.000
|
$5.170
|
$5.300
|
$7.700
|
$5.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
17.000
|
$200.000
|
$165.000
|
$170.670
|
$180.000
|
$178.000
|
$165.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
14.000
|
$340.000
|
$170.000
|
$175.850
|
$185.000
|
$341.000
|
$170.000
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
6.000
|
$250.000
|
$155.000
|
$160.330
|
$172.000
|
$137.000
|
$155.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
15.000
|
$220.000
|
$175.000
|
$181.020
|
$190.000
|
$204.000
|
$175.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
26.000
|
$50.000
|
$55.000
|
$56.890
|
$59.000
|
$86.500
|
$55.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
179,340.000
|
$0.500
|
$0.360
|
$0.370
|
$0.400
|
$0.200
|
$0.360
|
|
|
PAVEMENT SEALER 8"
|
LF
|
19,942.000
|
$0.600
|
$0.380
|
$0.390
|
$0.400
|
$0.400
|
$0.380
|
|
|
PAVEMENT SEALER 12"
|
LF
|
10,206.000
|
$1.000
|
$0.700
|
$0.720
|
$0.700
|
$1.150
|
$0.700
|
|
|
PAVEMENT SEALER 24"
|
LF
|
597.000
|
$2.500
|
$1.050
|
$1.090
|
$1.000
|
$2.150
|
$1.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
17.000
|
$40.000
|
$79.000
|
$81.720
|
$85.000
|
$35.750
|
$79.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
15.000
|
$50.000
|
$79.000
|
$81.720
|
$85.000
|
$40.750
|
$79.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
11.000
|
$80.000
|
$80.000
|
$82.750
|
$87.000
|
$56.000
|
$80.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
26.000
|
$30.000
|
$7.000
|
$7.240
|
$7.500
|
$15.300
|
$7.000
|
|
|
PAVEMENT SEALER (NUMBER)
|
EA
|
6.000
|
$50.000
|
$18.000
|
$18.620
|
$19.000
|
$102.000
|
$18.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
31,370.000
|
$1.000
|
$0.990
|
$1.020
|
$1.000
|
$0.850
|
$0.990
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
73,736.000
|
$1.000
|
$0.990
|
$1.020
|
$1.000
|
$0.850
|
$0.990
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
73,063.000
|
$1.000
|
$0.990
|
$1.020
|
$1.000
|
$0.850
|
$0.990
|
|
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
|
LF
|
636.000
|
$4.000
|
$2.750
|
$2.840
|
$3.000
|
$5.100
|
$2.750
|
|
PREFAB PAV MRK TY C (MULTI) (SHIELD)
|
EA
|
5.000
|
$3,000.000
|
$1,700.000
|
$1,758.450
|
$1,800.000
|
$3,820.000
|
$1,700.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,634.000
|
$5.000
|
$5.000
|
$5.170
|
$5.500
|
$5.100
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,476.000
|
$5.000
|
$5.000
|
$5.170
|
$5.500
|
$5.100
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
140,680.000
|
$0.750
|
$0.360
|
$0.370
|
$0.400
|
$0.500
|
$0.360
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
300.000
|
$1.500
|
$0.450
|
$0.470
|
$0.500
|
$1.000
|
$0.450
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
515.000
|
$2.000
|
$0.470
|
$0.490
|
$0.500
|
$2.050
|
$0.470
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
179,340.000
|
$0.150
|
$0.100
|
$0.100
|
$0.110
|
$0.100
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
19,942.000
|
$0.250
|
$0.150
|
$0.160
|
$0.170
|
$0.200
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
10,206.000
|
$0.750
|
$0.170
|
$0.180
|
$0.190
|
$1.000
|
$0.170
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
597.000
|
$1.500
|
$0.190
|
$0.200
|
$0.200
|
$2.050
|
$0.190
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
31.000
|
$25.000
|
$12.000
|
$12.410
|
$13.000
|
$15.300
|
$12.000
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
6.000
|
$30.000
|
$12.000
|
$12.410
|
$13.000
|
$51.000
|
$12.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
15.000
|
$40.000
|
$12.000
|
$12.410
|
$13.000
|
$20.400
|
$12.000
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
26.000
|
$22.000
|
$2.000
|
$2.070
|
$2.200
|
$10.200
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
3,105.000
|
$1.250
|
$0.300
|
$0.310
|
$0.330
|
$1.000
|
$0.300
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$35,000.000
|
$54,060.000
|
$53,807.110
|
$54,000.000
|
$41,660.000
|
$29,971.100
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
11.000
|
$350.000
|
$433.500
|
$431.470
|
$450.000
|
$265.000
|
$307.360
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
9.000
|
$350.000
|
$423.300
|
$421.320
|
$460.000
|
$265.000
|
$307.360
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
15.000
|
$350.000
|
$433.500
|
$431.470
|
$465.000
|
$265.000
|
$307.360
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
3.000
|
$350.000
|
$423.300
|
$421.320
|
$460.000
|
$265.000
|
$307.360
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
15.000
|
$350.000
|
$433.500
|
$431.470
|
$465.000
|
$265.000
|
$307.360
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
1.000
|
$350.000
|
$423.300
|
$421.320
|
$450.000
|
$265.000
|
$307.360
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
12.000
|
$270.000
|
$183.600
|
$182.740
|
$190.000
|
$277.000
|
$174.950
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
2.000
|
$270.000
|
$193.800
|
$192.900
|
$200.000
|
$315.000
|
$254.440
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
2.000
|
$270.000
|
$214.200
|
$213.200
|
$220.000
|
$342.000
|
$279.640
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
6,755.000
|
$2.000
|
$3.010
|
$2.990
|
$3.000
|
$1.400
|
$1.690
|
|
|
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
|
LF
|
4,820.000
|
$2.200
|
$4.030
|
$4.010
|
$4.000
|
$1.850
|
$1.980
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
4,426.000
|
$4.000
|
$4.850
|
$4.820
|
$5.000
|
$3.400
|
$3.540
|
|
|
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
|
LF
|
3,380.000
|
$6.000
|
$4.970
|
$4.940
|
$5.000
|
$5.100
|
$4.740
|
|
|
PEDESTRIAN PUSH BUTTON POLE
|
EA
|
1.000
|
$3,000.000
|
$3,621.000
|
$3,604.060
|
$3,900.000
|
$2,680.000
|
$3,751.340
|
|
|
RELOCATE PED POLE ASSEMBLY
|
EA
|
1.000
|
$2,000.000
|
$2,805.000
|
$2,791.880
|
$3,000.000
|
$2,060.000
|
$10,472.900
|
|
|
RELOCATE PED PUSH BUTTON POST ASSEM
|
EA
|
1.000
|
$1,500.000
|
$2,325.600
|
$2,314.720
|
$2,500.000
|
$474.000
|
$256.410
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
2.000
|
$900.000
|
$1,099.560
|
$1,094.420
|
$1,100.000
|
$1,070.000
|
$898.620
|
|
|
INSTALL BBU SYSTEM
|
EA
|
1.000
|
$2,500.000
|
$2,284.800
|
$2,274.110
|
$2,400.000
|
$4,280.000
|
$8,036.580
|
|
|
FULL - WIDTH MOWING
|
CYC
|
12.000
|
$3,500.000
|
$3,500.000
|
$8,000.000
|
$5,500.000
|
$4,830.000
|
$4,500.000
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
17.000
|
$600.000
|
$940.000
|
$1,000.000
|
$3,200.000
|
$1,040.000
|
$850.000
|
|
|
LITTER REMOVAL
|
CYC
|
39.000
|
$2,000.000
|
$2,010.000
|
$2,200.000
|
$2,500.000
|
$5,090.000
|
$2,250.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
68.000
|
$200.000
|
$103.000
|
$500.000
|
$2,100.000
|
$2,550.000
|
$300.000
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
6,114.000
|
$2.250
|
$1.700
|
$1.720
|
$2.000
|
$2.650
|
$1.700
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
29,450.000
|
$6.000
|
$3.000
|
$1.950
|
$2.500
|
$2.650
|
$6.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
78,489.000
|
$160.000
|
$99.000
|
$95.000
|
$112.000
|
$119.000
|
$101.330
|
|
|
TACK COAT
|
GAL
|
12,815.000
|
$9.000
|
$5.000
|
$5.000
|
$6.000
|
$3.050
|
$4.990
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
|
TON
|
44,157.000
|
$160.000
|
$195.000
|
$165.000
|
$205.000
|
$204.000
|
$187.600
|
|
|
TACK COAT
|
GAL
|
21,224.000
|
$4.750
|
$5.250
|
$4.980
|
$6.000
|
$3.050
|
$4.970
|
|
|
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
|
LF
|
35,060.000
|
$4.500
|
$3.280
|
$5.000
|
$3.500
|
$3.300
|
$3.240
|
|
|
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
|
LF
|
35,060.000
|
$1.500
|
$0.850
|
$1.000
|
$1.200
|
$1.100
|
$1.100
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$8,000.000
|
$14,000.000
|
$18,000.000
|
$22,000.000
|
$25,630.000
|
$55,000.000
|
|
|
FO CBL (36 SMF)
|
LF
|
9,987.000
|
$4.000
|
$5.250
|
$5.230
|
$5.500
|
$5.400
|
$4.710
|
|
|
FO CBL (72 SMF)
|
LF
|
52,830.000
|
$3.700
|
$5.410
|
$5.380
|
$5.600
|
$4.900
|
$3.810
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)
|
EA
|
27.000
|
$1,800.000
|
$3,355.800
|
$3,340.100
|
$3,600.000
|
$2,280.000
|
$546.020
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
372.000
|
$70.000
|
$293.760
|
$292.390
|
$300.000
|
$51.000
|
$66.010
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
5.000
|
$9,000.000
|
$10,761.000
|
$10,710.660
|
$10,750.000
|
$9,020.000
|
$6,539.890
|
|
|
CCTV MOUNT (POLE)
|
EA
|
5.000
|
$1,000.000
|
$907.800
|
$903.550
|
$900.000
|
$499.000
|
$508.880
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
38,852.000
|
$23.000
|
$26.710
|
$26.590
|
$27.000
|
$30.500
|
$30.890
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
7,970.000
|
$33.000
|
$39.670
|
$39.480
|
$39.000
|
$38.250
|
$77.420
|
|
|
FIBER OPTIC CABLE ROAD MARKER
|
EA
|
51.000
|
$200.000
|
$362.100
|
$360.410
|
$360.000
|
$227.000
|
$97.400
|
|
|
INSTALL DMS (POLE MTD CABINET)
|
EA
|
2.000
|
$22,000.000
|
$25,897.800
|
$25,776.650
|
$26,000.000
|
$7,290.000
|
$12,051.820
|
|
|
REMOVE ITS RADIO
|
EA
|
2.000
|
$450.000
|
$635.450
|
$632.480
|
$650.000
|
$947.000
|
$516.840
|
|
|
ITS POLE (40 FT)(90 MPH)
|
EA
|
4.000
|
$14,000.000
|
$18,819.000
|
$18,730.970
|
$19,000.000
|
$13,710.000
|
$12,304.110
|
|
|
ITS POLE (60 FT)(90 MPH)
|
EA
|
5.000
|
$25,000.000
|
$23,623.200
|
$23,512.690
|
$25,000.000
|
$25,810.000
|
$22,809.010
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
3.000
|
$8,000.000
|
$5,977.200
|
$5,949.240
|
$6,000.000
|
$5,000.000
|
$4,758.570
|
|
|
ITS POLE MNT CAB (TY 3)(CONF 2)
|
EA
|
5.000
|
$9,000.000
|
$6,507.600
|
$6,477.160
|
$6,500.000
|
$5,900.000
|
$5,858.520
|
|
|
TERMINAL SERVER (INSTALL ONLY)
|
EA
|
8.000
|
$300.000
|
$2,947.800
|
$2,934.010
|
$3,000.000
|
$223.000
|
$149.160
|
|
|
RADAR DETECTOR
|
EA
|
2.000
|
$1,500.000
|
$11,811.600
|
$11,756.350
|
$12,000.000
|
$1,210.000
|
$1,238.940
|
|
|
RADAR COMMUNICATION CABLE
|
LF
|
5,920.000
|
$4.000
|
$3.060
|
$3.050
|
$3.200
|
$1.000
|
$1.130
|
|
|
TMA (STATIONARY)
|
DAY
|
100.000
|
$300.000
|
$250.000
|
$500.000
|
$190.000
|
$273.000
|
$925.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
100.000
|
$400.000
|
$1,000.000
|
$1,000.000
|
$290.000
|
$841.000
|
$925.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
41.000
|
$4,700.000
|
$5,395.800
|
$5,370.560
|
$5,500.000
|
$5,620.000
|
$5,402.640
|
|
|
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
|
EA
|
12.000
|
$6,500.000
|
$7,680.600
|
$7,644.670
|
$8,000.000
|
$7,990.000
|
$8,270.530
|
|
|
ITS RVSD (DATA COLLECT & WWA) SYS
|
EA
|
7.000
|
$18,000.000
|
$25,989.600
|
$25,868.020
|
$27,000.000
|
$17,420.000
|
$16,504.490
|
|
|
INSTALL OF HARD ETHERNET SWITCH
|
EA
|
15.000
|
$1,000.000
|
$3,315.000
|
$3,299.490
|
$3,400.000
|
$223.000
|
$1,193.250
|
|
Totals: |
$115,004,411.850
|
$98,670,163.960
|
$103,593,224.110
|
$106,490,851.880
|
$112,829,385.000
|
$122,784,948.520
|