Show Job Controls
Bid Cobra

ORANGE FM 1131 (0784-04-027)

Items: 81

County: ORANGE
Length: 6.8840 MILES
Highway: FM 1131
District: BEAUMONT
Control Number: 0784-04-027
DBE Goal: 6.0%
Project: F 2025(595)
Guaranty: $100,000.00
Time: 122 WORKING DAYS
Engineer's Estimate: $6,091,619.83
Date: 03/04/2025 (1 year ago)
Contract Number: 3253021
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00197896
Contract Type: Federal
Project Description: FM 1131-(JASPER COUNTY LINE, SOUTH TO FM 105 S) CONSTRUCT PAVED SHOULDERS (1-4 FT)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
BRYCE BROUSSARD
JIM GRISSOM
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$6,091,619.83
1
$5,072,328.60
Over/Under Est: -16.73% -$1,019,291.23
Over/Under Est: -7.17% -$436,720.93
Amt Left: 11.49% $582,570.30
Over/Under Est: 8.54% $520,057.42
Amt Left: 30.35% $1,539,348.65
Delta: -16.92% -$956,778.35
Subcontractor Percentage Amount
TEXAS MATERIALS GROUP, INC. 26.06% $1,330,222.90
C&J CONTRACTORS LLC 12.17% $621,213.07
COLD CREEK CONSTRUCTION, LTD 4.49% $229,190.36
AMERICAN REMEDIATION OPTIONS, INC. 3.77% $192,438.23
TRP CONSTRUCTION GROUP, LLC 2.34% $119,444.42
SURFACE PREPARATION TECHNOLOGIES, LLC 0.27% $13,782.05
CPAVE, INC. 0.00% $0.00
Total: 49.10% $2,506,291.03

Bid Items & Bid Tabulations

81 Total 0 of 81
ORANGE  |  FM 1131  |  BEAUMONT  |  0784-04-027  |  03/04/2025  |  $6,091,619.83  |  F 2025(595)  |  HAZARD ELIM & SAFETY  |  122 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LAKEY, INC.
TEXAS MATERIALS GROUP, INC.
MB WESTERN INDUSTRIAL CONTRACTING CO.
PREPARING ROW
STA 207.000 $1,250.000 $2,100.000 $1,310.000 $750.000
REMOV CONC (MOWSTRIP)
LF 2,650.000 $15.000 $15.000 $11.500 $9.250
REMOV CONC (DRIVEWAYS)
SY 1,163.000 $22.000 $24.500 $27.300 $21.570
SUBGR WIDEN (OC)
STA 207.000 $390.000 $700.000 $332.000 $750.000
BACKFILL (TY A OR B)
STA 207.000 $400.000 $255.000 $201.000 $230.000
BLADING
LF 600.000 $1.450 $1.480 $7.500 $5.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 160.000 $220.000 $136.500 $810.000 $135.000
BROADCAST SEED (TEMP_WARM)
SY 26,914.000 $1.250 $0.350 $0.150 $1.200
BROADCAST SEED (TEMP_COOL)
SY 26,914.000 $1.500 $0.350 $0.150 $1.200
HYDRO MULCH SEED (PERM_RURAL_SANDY)
SY 53,827.000 $1.500 $0.500 $0.500 $0.700
VEGETATIVE WATERING
TGL 226.000 $325.000 $30.000 $23.000 $60.000
ASPH (AC-20-5TR)
GAL 3,292.000 $7.000 $4.250 $4.500 $5.000
AGGR (TY-PB OR PL, GR-4)(SAC-B)
CY 70.000 $195.000 $195.000 $390.000 $446.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 9,796.000 $140.000 $137.980 $145.000 $192.000
TACK COAT
GAL 2,312.000 $8.000 $5.030 $4.100 $5.000
SP MIXES SP-C SAC-A PG76-22
TON 7,138.000 $190.000 $160.000 $175.000 $228.000
TACK COAT
GAL 6,489.000 $7.000 $4.480 $4.100 $5.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 250.000 $110.000 $80.310 $120.000 $100.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 622.000 $2.500 $3.900 $17.000 $5.000
CEM STABIL BKFL
CY 36.000 $150.000 $300.000 $275.000 $105.000
TEMPORARY SPL SHORING
SF 980.000 $15.000 $40.000 $110.000 $80.000
CL A CONC (COLLAR)
EA 52.000 $1,000.000 $1,053.060 $1,650.000 $1,845.000
CL E CONC (SEAL SLAB)
CY 4.000 $6.000 $500.000 $935.000 $800.000
RIPRAP (CONC)(5 IN)
CY 12.000 $650.000 $702.560 $1,100.000 $743.000
RIPRAP (MOW STRIP)(4 IN)
CY 84.000 $760.000 $650.000 $1,250.000 $785.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 8.000 $750.000 $818.900 $1.000 $1,138.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 24.000 $7,000.000 $1,300.000 $1,595.000 $1,205.000
RC PIPE (CL III)(15 IN)
LF 4.000 $125.000 $77.500 $72.000 $80.000
RC PIPE (CL III)(18 IN)
LF 549.000 $135.000 $90.700 $90.000 $86.100
RC PIPE (CL III)(24 IN)
LF 38.000 $150.000 $110.000 $180.000 $203.000
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
EA 1.000 $7,000.000 $6,985.000 $6,000.000 $6,765.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $30,000.000 $42,085.050 $44,000.000 $49,200.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $1,415.000 $1,155.000 $990.000 $1,107.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 62.000 $1,525.000 $1,275.000 $1,100.000 $1,230.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,600.000 $1,775.000 $2,200.000 $2,460.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 3.000 $2,000.000 $1,775.000 $2,750.000 $3,075.000
REMOV STR (SET)
EA 70.000 $720.000 $460.000 $950.000 $1,046.000
REMOV STR (WINGWALL)
EA 2.000 $2,250.000 $1,876.800 $2,750.000 $3,075.000
REMOV STR (PIPE)
LF 252.000 $40.000 $24.190 $66.000 $74.000
REMOV STR (SMALL)
EA 33.000 $3,900.000 $1,200.000 $1,300.000 $1,476.000
MOBILIZATION
LS 1.000 $550,000.000 $253,042.110 $270,000.000 $550,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $7,000.000 $5,000.000 $2,807.000 $5,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $91.000 $88.000 $71.500 $100.000
TMA (STATIONARY)
DAY 100.000 $325.000 $205.000 $250.000 $300.000
TMA (MOBILE OPERATION)
DAY 5.000 $230.000 $205.000 $275.000 $300.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 600.000 $50.000 $42.000 $52.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 600.000 $19.000 $10.450 $11.000 $20.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 840.000 $7.500 $5.500 $7.250 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 840.000 $5.000 $2.750 $2.200 $5.000
DRIVEWAYS (CONC)
SY 1,127.000 $112.000 $110.000 $180.000 $118.000
DRIVEWAYS (ACP)
SY 1,165.000 $80.000 $55.000 $87.000 $97.000
DRIVEWAYS (BASE)
SY 4,574.000 $60.000 $36.000 $56.000 $54.340
TURNOUTS (ACP)
SY 1,223.000 $88.000 $64.500 $201.000 $109.220
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 7,290.000 $1.750 $8.500 $1.500 $1.810
MTL W-BEAM GD FEN (TIM POST)
LF 900.000 $27.500 $28.650 $30.000 $29.690
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 3.000 $380.000 $681.060 $1,100.000 $1,728.000
REMOVE METAL BEAM GUARD FENCE
LF 1,238.000 $3.500 $3.000 $3.500 $2.460
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $3,250.000 $3,200.000 $3,100.000 $3,592.000
GUARDRAIL END TREATMENT (REMOVE)
EA 7.000 $375.000 $286.680 $400.000 $400.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,400.000 $1,000.000 $1,000.000 $3,505.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 1.000 $31,000.000 $27,404.250 $30,000.000 $35,117.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 84.000 $250.000 $300.000 $300.000 $381.300
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 16.000 $250.000 $300.000 $320.000 $430.500
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 10.000 $750.000 $625.000 $705.000 $1,070.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 67.000 $750.000 $720.000 $575.000 $781.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $850.000 $850.000 $730.000 $929.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,050.000 $1,100.000 $1,100.000 $1,359.000
REMOVE SM RD SN SUP&AM
EA 78.000 $160.000 $110.000 $105.000 $111.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 18.000 $25.000 $31.000 $36.000 $35.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 52.000 $140.000 $75.000 $82.500 $80.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 34.000 $25.000 $18.990 $27.500 $22.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,060.000 $1.550 $1.500 $0.850 $3.000
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
LF 71,461.000 $1.280 $1.060 $1.200 $1.290
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 4,630.000 $1.700 $0.730 $0.750 $0.860
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 42,930.000 $1.700 $0.780 $0.750 $0.800
PREFAB PM TY C (W)(24")(SLD)
LF 300.000 $19.000 $18.000 $20.000 $21.530
PREFAB PM TY C (W)(36")(YLD TRI)
EA 8.000 $80.000 $84.000 $50.000 $55.350
REFL PAV MRKR TY I-C
EA 16.000 $7.000 $7.000 $6.000 $6.150
REFL PAV MRKR TY II-A-A
EA 553.000 $7.250 $7.000 $6.000 $6.150
FULL - WIDTH MOWING
CYC 2.000 $2,200.000 $2,600.000 $3,000.000 $5,500.000
LITTER REMOVAL
CYC 8.000 $2,000.000 $1,716.000 $1,020.000 $4,000.000
Totals: $6,091,619.830 $5,072,328.600 $5,654,898.900 $6,611,677.250
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00
Total: $40,000.00