OCHILTREE SH 70 (0490-03-028)

Items: 66

County: OCHILTREE
Length: N/A
Highway: SH 70
District: AMARILLO
Control Number: 0490-03-028
DBE Goal: N/A
Project: STP 2019(237)
Guaranty: N/A
Time: 147 WORKING DAYS
Engineer's Estimate: $13,097,046.90
Date: 11/06/2018 (7 years ago)
Contract Number: N/A
Type: BASE REPAIR AND OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$13,097,046.90
$13,090,321.61
Over/Under Est: -0.05% -$6,725.29
$13,322,305.70
Over/Under Est: 1.72% $225,258.80
Amt Left: 1.77% $231,984.09
$14,655,038.79
Over/Under Est: 11.9% $1,557,991.89
Amt Left: 11.95% $1,564,717.18
Delta: -10.00% -$1,332,733.09
Over/Under Est: 12.91% $1,691,141.30
Amt Left: 12.97% $1,697,866.59
Delta: -0.91% -$133,149.41
Over/Under Est: 19.1% $2,501,079.54
Amt Left: 19.16% $2,507,804.83
Delta: -5.48% -$809,938.24

Bid Items & Bid Tabulations

66 Total 0 of 66
OCHILTREE  |  SH 70  |  AMARILLO  |  0490-03-028  |  11/06/2018  |  $13,097,046.90  |  STP 2019(237)  |  BASE REPAIR AND OVERLAY  |  147 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
RK HALL, LLC
DUININCK, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
ALLEN BUTLER CONSTRUCTION, INC.
PREPARING ROW
AC 63.960 $275.000 $370.000 $145.000 $135.000 $200.000 $391.520
PREP ROW (TREE) (18"-36" DIA.)
EA 35.000 $1,250.000 $1,245.000 $760.000 $2,100.000 $500.000 $1,147.240
EXCAVATION (CHANNEL)
CY 2,738.000 $20.000 $11.500 $18.600 $14.000 $11.650 $10.110
EMBANKMENT (FINAL)(DENS CONT)(TY D)
CY 5.000 $60.000 $125.000 $18.600 $31.500 $160.230 $375.670
BACKFILL (TY A)
STA 1,323.000 $210.000 $225.000 $150.000 $270.000 $262.740 $227.030
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 63.960 $450.000 $420.000 $417.900 $420.000 $464.790 $420.820
EMULS ASPH (EROSN CONT)(MS-2)
GAL 19,327.000 $3.000 $3.800 $4.020 $4.200 $4.060 $15.920
SUPERPAVE MIXTURES SP-D SAC-A PG76-28
TON 103,513.000 $87.000 $89.600 $98.000 $105.200 $99.160 $105.460
FLEX PAVEMENT STRUCTURE REPAIR (2.5")
SY 39,318.000 $26.000 $18.750 $20.100 $22.000 $25.150 $22.010
PLANE ASPH CONC PAV(0" TO 3")
SY 4,793.000 $3.250 $3.150 $3.820 $4.900 $2.700 $2.290
PLANE CONC PAV(0" TO 1-1/2")
SY 3,921.000 $3.250 $5.250 $2.730 $4.600 $8.180 $4.000
PLANE ASPH CONC PAV (2")
SY 15,860.000 $3.250 $1.450 $1.460 $2.050 $2.550 $1.890
PLANE ASPH CONC PAV (3")
SY 7,516.000 $3.250 $2.800 $2.920 $2.700 $2.880 $2.580
PLANE ASPH CONC PAV (2"-3")
SY 537.000 $3.250 $8.850 $10.900 $3.200 $3.120 $3.840
PLANE ASPH CONC PAV (0"- 2 1/2")
SY 4,475.000 $3.250 $2.300 $5.450 $4.150 $2.490 $2.760
CEM STABIL BKFL
CY 25.000 $170.000 $240.000 $200.000 $210.000 $163.490 $307.900
CUT & RESTORE ASPH PAVING
SY 60.000 $300.000 $100.000 $40.000 $94.500 $134.500 $194.270
FLOWABLE BACKFILL
CY 15.000 $150.000 $220.000 $240.000 $130.000 $165.920 $329.920
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 400.000 $33.000 $27.600 $81.310 $27.500 $39.340 $60.370
CONC BOX CULV (5 FT X 2 FT)
LF 78.000 $270.000 $445.000 $330.000 $365.000 $459.640 $569.670
RC PIPE (CL III)(36 IN)
LF 220.000 $120.000 $215.000 $145.000 $145.000 $207.140 $148.780
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $7,500.000 $6,700.000 $9,300.000 $7,900.000 $9,991.890 $12,018.460
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 4.000 $4,000.000 $7,800.000 $3,500.000 $4,700.000 $7,718.400 $3,872.620
REMOV STR (PIPE)
LF 150.000 $30.000 $24.250 $20.000 $21.000 $38.050 $40.080
REMOV STR (CATTLE GUARD)
EA 1.000 $5,000.000 $2,700.000 $2,000.000 $2,600.000 $2,243.140 $1,788.770
MOBILIZATION
LS 1.000 $1,100,000.000 $1,020,000.000 $466,000.000 $650,000.000 $1,307,647.400 $1,553,424.220
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $15,000.000 $18,050.000 $15,000.000 $33,000.000 $20,000.000 $6,301.790
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 350.000 $9.000 $8.400 $2.990 $3.000 $3.330 $3.010
BIODEG EROSN CONT LOGS (REMOVE)
LF 350.000 $1.500 $3.000 $1.050 $1.050 $1.170 $1.060
DRIVEWAYS (BASE)
SY 348.000 $30.000 $30.000 $37.000 $14.500 $19.690 $45.950
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 755,858.000 $0.150 $0.100 $0.120 $0.140 $0.120 $0.090
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 131,814.000 $0.250 $0.250 $0.120 $0.160 $0.120 $0.140
MTL W-BEAM GD FEN (STEEL POST)
LF 3,250.000 $23.000 $28.200 $28.090 $28.000 $31.240 $28.280
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,725.000 $2,740.000 $2,730.000 $2,700.000 $3,036.310 $3,013.420
REMOVE METAL BEAM GUARD FENCE
LF 3,470.000 $3.000 $3.700 $3.680 $3.650 $4.090 $3.700
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $235.000 $370.000 $367.500 $365.000 $408.730 $370.070
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $2,300.000 $3,160.000 $3,150.000 $3,100.000 $3,503.430 $3,172.020
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $250.000 $370.000 $367.500 $365.000 $408.730 $370.070
WIRE FENCE (TY A)
LF 60.000 $15.000 $50.000 $21.000 $21.000 $29.200 $66.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 35.000 $700.000 $550.000 $866.250 $715.000 $963.440 $640.720
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 22.000 $800.000 $680.000 $997.500 $850.000 $1,109.420 $734.850
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 5.000 $900.000 $790.000 $1,155.000 $965.000 $1,284.590 $882.880
REMOVE SM RD SN SUP&AM
EA 62.000 $82.000 $145.000 $105.000 $78.500 $116.780 $59.890
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 97.000 $95.000 $125.000 $141.750 $125.000 $157.650 $95.160
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 135.000 $95.000 $130.000 $141.750 $125.000 $157.650 $95.160
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 42.000 $35.000 $55.000 $37.750 $37.500 $41.980 $105.730
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 1,880.000 $0.200 $0.260 $0.260 $0.260 $0.290 $0.260
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 28,930.000 $0.200 $0.260 $0.260 $0.260 $0.290 $0.260
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 7,230.000 $0.200 $0.260 $0.260 $0.260 $0.290 $0.260
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 28,930.000 $0.200 $0.260 $0.260 $0.260 $0.290 $0.260
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 12,296.000 $1.300 $1.100 $1.010 $1.250 $2.340 $1.040
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 213.000 $5.000 $10.550 $10.500 $10.500 $11.680 $10.570
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 2.000 $200.000 $265.000 $262.500 $260.000 $291.950 $264.340
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 2.000 $300.000 $265.000 $262.500 $260.000 $291.950 $264.340
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 6,875.000 $0.300 $0.320 $0.320 $0.310 $0.350 $0.320
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 260,295.000 $0.300 $0.320 $0.320 $0.310 $0.350 $0.320
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 31,563.000 $0.300 $0.320 $0.320 $0.310 $0.350 $0.320
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 78,090.000 $0.300 $0.320 $0.320 $0.310 $0.350 $0.320
REFL PAV MRKR TY I-C
EA 95.000 $3.200 $3.150 $3.150 $3.150 $3.500 $3.170
REFL PAV MRKR TY II-A-A
EA 2,345.000 $3.200 $3.150 $3.150 $3.150 $3.500 $3.170
UNDERSEAL COURSE
GAL 120,287.000 $3.500 $2.750 $3.730 $3.450 $3.620 $3.800
CATTLE GUARD
EA 1.000 $40,000.000 $49,000.000 $30,000.000 $13,000.000 $27,336.150 $18,239.040
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $17,000.000 $23,000.000 $5,000.000 $13,000.000 $20,000.000 $10,573.400
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $7.500 $47.400 $47.250 $47.000 $52.550 $47.580
TMA (STATIONARY)
DAY 147.000 $200.000 $615.000 $365.000 $315.000 $231.320 $774.800
TMA (MOBILE OPERATION)
HR 680.000 $45.000 $62.000 $65.000 $99.500 $75.000 $77.480
Totals: $13,097,046.900 $13,090,321.610 $13,322,305.704 $14,655,038.790 $14,788,188.208 $15,598,126.456