|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
12.000
|
$10.000
|
$60.530
|
$122.000
|
$125.000
|
$53.300
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
50.000
|
$6.000
|
$60.530
|
$16.900
|
$45.000
|
$14.950
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
15.000
|
$15.000
|
$60.530
|
$115.000
|
$135.000
|
$62.100
|
|
|
BACKFILL (TY A OR B)
|
CY
|
2.000
|
$30.000
|
$90.790
|
$110.000
|
$1,000.000
|
$65.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
138.000
|
$275.000
|
$261.050
|
$195.000
|
$375.000
|
$340.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
198.000
|
$400.000
|
$379.860
|
$630.000
|
$420.000
|
$459.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$225,000.000
|
$350,002.290
|
$213,500.000
|
$360,000.000
|
$160,287.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$4,000.000
|
$6,127.000
|
$2,530.000
|
$3,500.000
|
$7,191.710
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
270.000
|
$5.000
|
$10.710
|
$10.000
|
$35.000
|
$9.750
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
270.000
|
$1.000
|
$5.450
|
$3.850
|
$8.000
|
$1.810
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
60.000
|
$20.000
|
$72.630
|
$37.000
|
$30.000
|
$27.600
|
|
|
CONC SIDEWALKS (6")
|
SY
|
71.000
|
$60.000
|
$164.330
|
$120.000
|
$120.000
|
$116.150
|
|
|
CURB RAMPS (TY 1)
|
EA
|
12.000
|
$1,600.000
|
$2,602.600
|
$2,050.000
|
$1,750.000
|
$286.060
|
|
|
CURB RAMPS (TY 7)
|
EA
|
1.000
|
$1,750.000
|
$3,389.430
|
$2,605.000
|
$2,500.000
|
$2,472.500
|
|
|
REPLACE LUMINAIRE W/LED (250W EQ)
|
EA
|
18.000
|
$700.000
|
$532.720
|
$565.000
|
$750.000
|
$605.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
380.000
|
$10.000
|
$11.160
|
$12.200
|
$22.000
|
$12.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
570.000
|
$15.000
|
$12.300
|
$14.900
|
$25.000
|
$18.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
3,600.000
|
$10.000
|
$11.540
|
$13.000
|
$10.000
|
$12.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
2,024.000
|
$20.000
|
$23.870
|
$14.400
|
$25.000
|
$24.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
208.000
|
$20.000
|
$12.840
|
$14.900
|
$20.000
|
$17.000
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
242.000
|
$20.000
|
$13.880
|
$14.250
|
$20.000
|
$20.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
1,546.000
|
$30.000
|
$30.310
|
$22.650
|
$35.000
|
$34.000
|
|
|
ELEC CONDR (NO.14) BARE
|
LF
|
4,226.000
|
$1.000
|
$0.800
|
$0.700
|
$0.800
|
$1.000
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
2,420.000
|
$1.000
|
$0.970
|
$1.050
|
$0.850
|
$1.150
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
17,726.000
|
$1.500
|
$1.090
|
$1.200
|
$1.300
|
$2.040
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
689.000
|
$1.500
|
$1.210
|
$1.200
|
$1.500
|
$2.340
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
7,065.000
|
$1.500
|
$1.310
|
$1.340
|
$1.600
|
$2.360
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
25.000
|
$1,000.000
|
$837.400
|
$1,025.000
|
$990.000
|
$1,200.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
8.000
|
$1,000.000
|
$896.720
|
$725.000
|
$1,250.000
|
$1,250.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
5.000
|
$750.000
|
$256.700
|
$1,185.000
|
$350.000
|
$624.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
14.000
|
$5,000.000
|
$4,379.680
|
$3,665.000
|
$3,250.000
|
$5,162.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)TS(O)
|
EA
|
13.000
|
$3,000.000
|
$3,294.970
|
$2,885.000
|
$2,850.000
|
$2,800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$60.000
|
$409.330
|
$150.000
|
$275.000
|
$81.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
414.000
|
$0.500
|
$2.120
|
$2.000
|
$3.200
|
$2.013
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
640.000
|
$1.200
|
$2.420
|
$2.300
|
$5.700
|
$2.300
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
981.000
|
$5.000
|
$4.840
|
$4.600
|
$11.400
|
$4.600
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
100.000
|
$0.250
|
$0.730
|
$0.700
|
$1.900
|
$0.690
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
50.000
|
$0.200
|
$1.030
|
$1.000
|
$1.900
|
$0.978
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
400.000
|
$0.250
|
$0.600
|
$0.600
|
$1.900
|
$0.575
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
650.000
|
$0.850
|
$0.190
|
$0.170
|
$1.200
|
$0.846
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
414.000
|
$0.750
|
$0.220
|
$0.350
|
$2.350
|
$0.689
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
640.000
|
$1.250
|
$0.600
|
$0.550
|
$4.100
|
$1.359
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
981.000
|
$1.500
|
$1.210
|
$1.050
|
$5.250
|
$1.472
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
550.000
|
$0.100
|
$0.180
|
$0.200
|
$0.300
|
$0.173
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
414.000
|
$0.150
|
$0.360
|
$0.400
|
$1.000
|
$0.345
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
640.000
|
$0.200
|
$0.540
|
$0.600
|
$1.200
|
$0.518
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
981.000
|
$0.250
|
$1.090
|
$1.100
|
$2.350
|
$1.035
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
27.000
|
$25,000.000
|
$21,323.470
|
$26,303.000
|
$26,500.000
|
$28,620.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
27.000
|
$5,000.000
|
$2,173.320
|
$5,080.000
|
$2,300.000
|
$3,700.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
221.000
|
$225.000
|
$191.440
|
$198.000
|
$210.000
|
$275.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
88.000
|
$225.000
|
$191.440
|
$198.000
|
$210.000
|
$275.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
221.000
|
$225.000
|
$191.440
|
$198.000
|
$210.000
|
$275.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
134.000
|
$225.000
|
$191.440
|
$198.000
|
$210.000
|
$275.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
221.000
|
$225.000
|
$191.440
|
$198.000
|
$210.000
|
$275.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
86.000
|
$225.000
|
$342.750
|
$198.000
|
$210.000
|
$275.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
172.000
|
$600.000
|
$430.170
|
$440.000
|
$450.000
|
$672.000
|
|
|
BACK PLATE (12")(3 SEC)
|
EA
|
255.000
|
$100.000
|
$99.300
|
$155.000
|
$85.000
|
$200.000
|
|
|
BACK PLATE (12")(4 SEC)
|
EA
|
50.000
|
$100.000
|
$107.770
|
$180.000
|
$100.000
|
$135.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
|
LF
|
34,328.000
|
$1.750
|
$1.110
|
$1.270
|
$1.300
|
$2.500
|
|
|
TRF SIG CBL (TY A)(14 AWG)(4 CONDR)
|
LF
|
1,362.000
|
$1.500
|
$1.260
|
$1.440
|
$1.500
|
$1.700
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
19,420.000
|
$2.000
|
$1.360
|
$1.530
|
$1.600
|
$2.260
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
4,461.000
|
$2.000
|
$1.460
|
$1.730
|
$1.800
|
$2.460
|
|
|
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
|
LF
|
22,629.000
|
$3.500
|
$2.710
|
$2.400
|
$2.900
|
$4.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(24')LUM
|
EA
|
1.000
|
$5,000.000
|
$8,125.750
|
$7,605.000
|
$8,600.000
|
$10,443.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM
|
EA
|
2.000
|
$5,000.000
|
$9,658.250
|
$7,640.000
|
$8,750.000
|
$10,544.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
2.000
|
$6,000.000
|
$10,172.720
|
$8,120.000
|
$9,400.000
|
$10,964.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')
|
EA
|
1.000
|
$6,500.000
|
$9,447.630
|
$7,591.000
|
$8,700.000
|
$10,587.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
2.000
|
$7,000.000
|
$10,779.200
|
$9,170.000
|
$10,990.000
|
$12,746.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')
|
EA
|
1.000
|
$7,000.000
|
$9,981.800
|
$7,885.000
|
$9,100.000
|
$11,005.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')ILSN
|
EA
|
1.000
|
$9,500.000
|
$11,485.590
|
$8,300.000
|
$11,100.000
|
$13,201.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')
|
EA
|
1.000
|
$9,400.000
|
$16,942.240
|
$20,970.000
|
$17,250.000
|
$22,742.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')ILSN
|
EA
|
2.000
|
$20,000.000
|
$18,606.690
|
$22,100.000
|
$18,420.000
|
$24,040.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')
|
EA
|
1.000
|
$20,000.000
|
$17,822.070
|
$21,400.000
|
$17,500.000
|
$22,980.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')ILSN
|
EA
|
1.000
|
$20,000.000
|
$19,456.260
|
$23,600.000
|
$19,000.000
|
$24,682.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
4.000
|
$20,000.000
|
$20,000.990
|
$24,800.000
|
$20,200.000
|
$26,480.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
28.000
|
$1,500.000
|
$3,304.240
|
$1,375.000
|
$1,850.000
|
$2,700.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
169.000
|
$800.000
|
$559.950
|
$635.000
|
$750.000
|
$805.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
8.000
|
$3,500.000
|
$2,475.530
|
$4,000.000
|
$3,800.000
|
$3,650.000
|
|
|
VIVDS CAMERA (INSTALL)
|
EA
|
3.000
|
$2,100.000
|
$174.870
|
$1,370.000
|
$1,350.000
|
$2,100.000
|
|
|
TREE TRIMMING AND BRUSH REMOVAL
|
LF
|
110.000
|
$10.000
|
$36.320
|
$140.000
|
$90.000
|
$20.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
360.000
|
$50.000
|
$222.970
|
$130.000
|
$140.000
|
$104.720
|
|
|
VIVDS COMMUNICATION CABLE (COAXIAL)
|
LF
|
655.000
|
$3.000
|
$1.920
|
$2.800
|
$3.000
|
$2.580
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
4,226.000
|
$3.000
|
$3.910
|
$1.750
|
$7.000
|
$3.094
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
4.000
|
$1,000.000
|
$745.120
|
$530.000
|
$3,250.000
|
$979.800
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
18.000
|
$5,000.000
|
$4,558.100
|
$4,615.000
|
$3,950.000
|
$6,258.000
|
|
|
CCTV FIELD CONTROLLER
|
EA
|
2.000
|
$2,500.000
|
$1,862.820
|
$4,235.000
|
$4,250.000
|
$8,500.000
|
|
|
CCTV MOUNT (POLE)
|
EA
|
2.000
|
$500.000
|
$404.650
|
$1,225.000
|
$1,450.000
|
$3,500.000
|
|
|
RADAR PRESENCE DETECTOR COMM CABLE
|
LF
|
9,879.000
|
$3.000
|
$0.990
|
$3.000
|
$3.000
|
$3.500
|
|
|
CONDUIT (PREPARE)
|
LF
|
3,432.000
|
$2.000
|
$10.040
|
$2.250
|
$3.000
|
$3.500
|
|
|
GROUND BOX (PREPARE)
|
EA
|
33.000
|
$400.000
|
$264.360
|
$140.000
|
$250.000
|
$425.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
27.000
|
$8,000.000
|
$6,339.140
|
$8,920.000
|
$6,100.000
|
$7,093.000
|
|
|
ITS RADIO (SNGL)(5 GHZ)-C-U
|
EA
|
6.000
|
$3,500.000
|
$3,524.840
|
$3,460.000
|
$3,500.000
|
$2,548.000
|
|
|
TMA (STATIONARY)
|
EA
|
8.000
|
$800.000
|
$10,894.600
|
$11,500.000
|
$7,500.000
|
$15,400.000
|
|
|
RVDS(PRESENCE DETECTION ONLY)
|
EA
|
83.000
|
$6,750.000
|
$5,529.430
|
$7,880.000
|
$7,800.000
|
$8,000.000
|
|
|
RVDS(PRESENCE AND ADVANCE DET)
|
EA
|
1.000
|
$6,000.000
|
$8,249.670
|
$11,615.000
|
$11,000.000
|
$12,500.000
|
|
Totals: |
$3,585,320.350
|
$3,511,807.360
|
$3,771,396.820
|
$3,841,015.100
|
$4,239,604.199
|