Show Job Controls
Bid Cobra

NUECES SH 44 (0373-02-093)

Items: 79

County: NUECES
Length: N/A
Highway: SH 44
District: CORPUS CHRISTI
Control Number: 0373-02-093
DBE Goal: N/A
Project: NH 2017(490)
Guaranty: N/A
Time: 187 WORKING DAYS
Engineer's Estimate: $5,248,196.75
Date: 01/05/2017 (9 years ago)
Contract Number: N/A
Type: OVERLAY ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$5,248,196.75
1
Awarded
$4,986,828.05
Over/Under Est: -4.98% -$261,368.70
$5,189,905.13
Over/Under Est: -1.11% -$58,291.62
Amt Left: 4.07% $203,077.08
Over/Under Est: 12.4% $651,007.50
Amt Left: 18.3% $912,376.20
Delta: -13.67% -$709,299.12
$5,976,567.86
Over/Under Est: 13.88% $728,371.11
Amt Left: 19.85% $989,739.81
Delta: -1.31% -$77,363.61

Bid Items & Bid Tabulations

79 Total 0 of 79
NUECES  |  SH 44  |  CORPUS CHRISTI  |  0373-02-093  |  01/05/2017  |  $5,248,196.75  |  NH 2017(490)  |  OVERLAY ROADWAY  |  187 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BAY LTD.
TEXAS SAI, INC.
HAAS-ANDERSON CONSTRUCTION, LTD.
FOREMOST PAVING, INC.
SUBGRADE WIDENING (ORD COMP)
STA 55.000 $500.000 $230.000 $242.040 $793.000 $600.000
BACKFILL (TY A OR B)
STA 722.000 $140.000 $58.000 $73.080 $138.000 $240.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 918.000 $65.000 $79.000 $43.480 $102.000 $65.000
PRIME COAT (MC-30)
GAL 1,044.000 $3.500 $5.000 $3.870 $5.500 $5.000
AGGR (MULTI OPTION)
CY 3,252.000 $65.000 $95.000 $96.460 $89.000 $65.000
ASPH (AC-20-5TR)
GAL 136,019.000 $2.000 $2.350 $2.290 $3.100 $3.000
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
TON 37,558.000 $75.000 $69.000 $77.820 $80.000 $84.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 2,667.000 $25.000 $32.000 $21.970 $28.000 $32.500
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 302,851.000 $1.500 $0.750 $1.250 $1.600 $1.600
PLAN & TEXT CONC PAV(0" TO 1-1/2")
SY 45,299.000 $1.250 $0.700 $1.200 $1.200 $0.800
RIPRAP (MOW STRIP)(4 IN)
CY 28.000 $500.000 $800.000 $369.310 $547.000 $450.000
RETROFIT RAIL (TY T223)
LF 666.000 $225.000 $220.000 $114.970 $262.000 $250.000
RETROFIT RAIL (TY T223)(MOD)
LF 664.000 $145.000 $220.000 $114.010 $262.000 $350.000
CLEAN EXIST CULVERTS
EA 24.000 $1,500.000 $1,700.000 $494.620 $1,140.000 $1,000.000
MOBILIZATION
LS 1.000 $346,500.000 $330,000.000 $317,888.360 $369,000.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $2,000.000 $4,000.000 $5,101.950 $2,480.000 $2,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,880.000 $3.000 $3.500 $3.010 $3.950 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,880.000 $1.000 $0.750 $1.290 $0.850 $1.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 300.000 $6.000 $5.600 $4.380 $6.200 $6.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 80.000 $8.000 $6.400 $13.660 $6.750 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 380.000 $1.000 $0.800 $1.080 $0.850 $3.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 630.000 $75.000 $63.000 $32.930 $22.000 $55.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,890.000 $20.000 $10.250 $9.690 $19.000 $5.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 630.000 $30.000 $17.500 $13.800 $19.000 $15.000
RUMBLE STRIPS (SHOULDER)
LF 134,576.000 $0.150 $0.160 $0.080 $0.200 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 575.000 $20.000 $21.000 $21.000 $21.000 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,600.000 $1,500.000 $2,150.000 $1,550.000 $1,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,000.000 $940.000 $1,500.000 $955.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 760.000 $1.250 $1.100 $1.520 $1.100 $10.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,000.000 $2,400.000 $2,250.000 $2,440.000 $1,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $150.000 $300.000 $190.000 $303.000 $500.000
CRASH CUSH ATTEN (INSTL)
EA 1.000 $10,000.000 $10,900.000 $11,186.610 $2,810.000 $18,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $1,800.000 $1,700.000 $1,485.880 $1,680.000 $2,000.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $900.000 $990.000 $2,166.460 $1,120.000 $1,000.000
ALUMINUM SIGNS (TY A)
SF 40.000 $20.000 $17.000 $16.000 $18.000 $16.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 75.000 $500.000 $440.000 $410.000 $461.000 $410.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 45.000 $550.000 $590.000 $550.000 $618.000 $550.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 118.000 $610.000 $480.000 $450.000 $505.000 $450.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 14.000 $250.000 $720.000 $675.000 $758.000 $675.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $400.000 $1,100.000 $1,050.000 $1,180.000 $1,050.000
REMOVE SM RD SN SUP&AM
EA 131.000 $50.000 $64.000 $60.000 $67.000 $60.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 58.000 $75.000 $59.000 $55.000 $62.000 $55.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 6.000 $20.000 $16.000 $15.000 $17.000 $15.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 6.000 $20.000 $16.000 $15.000 $17.000 $15.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 30.000 $65.000 $59.000 $55.000 $62.000 $55.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 41.000 $65.000 $59.000 $55.000 $62.000 $55.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 4.000 $30.000 $19.250 $18.000 $20.000 $18.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 4.000 $30.000 $19.250 $18.000 $20.000 $18.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 39,568.000 $0.200 $0.450 $0.420 $0.450 $0.150
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,930.000 $0.200 $0.450 $0.420 $0.450 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 8,164.000 $0.500 $0.950 $0.900 $1.000 $0.450
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 3,350.000 $0.200 $0.450 $0.420 $0.450 $0.250
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 24,752.000 $0.200 $0.450 $0.420 $0.450 $0.180
WK ZN PAV MRK REMOV (REFL) TY I-A
EA 96.000 $3.000 $4.300 $4.000 $4.500 $2.500
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 604.000 $3.000 $4.300 $4.000 $4.500 $2.300
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 848.000 $3.000 $4.300 $4.000 $4.500 $2.300
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 2,376.000 $3.000 $4.300 $4.000 $4.500 $2.300
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 290.000 $2.000 $2.100 $2.000 $2.250 $2.300
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 290.000 $2.000 $2.100 $2.000 $2.250 $2.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 6,274.000 $1.000 $1.350 $1.160 $1.100 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,074.000 $1.000 $1.450 $1.900 $1.100 $1.000
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 158.000 $1.000 $0.900 $0.850 $0.950 $1.500
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 4,082.000 $0.600 $0.900 $0.850 $0.950 $1.500
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 19,544.000 $0.200 $0.370 $0.350 $0.400 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 68,585.000 $0.200 $0.370 $0.350 $0.400 $0.300
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 1,675.000 $0.200 $0.370 $0.350 $0.400 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 76,833.000 $0.200 $0.370 $0.350 $0.400 $0.300
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 348.000 $6.000 $5.900 $5.500 $6.200 $7.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 10.000 $200.000 $210.000 $200.000 $225.000 $225.000
PREFAB PAV MRK TY C (W) (WORD)
EA 10.000 $250.000 $320.000 $300.000 $337.000 $225.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 238.000 $30.000 $27.000 $25.000 $28.000 $36.000
PREFAB PAV MRK TY C (Y) (12") (SLD)
LF 1,974.000 $10.000 $5.900 $5.500 $6.200 $6.000
REFL PAV MRKR TY I-C
EA 172.000 $3.000 $3.700 $3.500 $3.950 $2.600
REFL PAV MRKR TY II-A-A
EA 784.000 $3.000 $3.700 $3.500 $3.950 $2.600
REFL PAV MRKR TY II-C-R
EA 1,249.000 $3.000 $3.700 $3.500 $3.950 $2.500
ELIM EXT PAV MRK & MRKS (4")
LF 5,790.000 $0.150 $0.600 $0.550 $0.600 $1.000
FULL - WIDTH MOWING
CYC 4.000 $2,000.000 $6,500.000 $1,605.550 $7,280.000 $1,650.000
TREE TRIMMING / BRUSH REMOVAL
MI 1.400 $20,000.000 $30,000.000 $23,269.350 $8,420.000 $11,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 374.000 $50.000 $50.000 $64.530 $55.000 $25.000
Totals: $5,248,196.750 $4,986,828.050 $5,189,905.130 $5,899,204.250 $5,976,567.860