PREPARING ROW
|
STA
|
210.000
|
$500.000
|
$390.000
|
$1,100.000
|
$474.510
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
202.000
|
$50.000
|
$16.000
|
$50.000
|
$141.960
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
55.000
|
$50.000
|
$16.000
|
$50.000
|
$70.760
|
|
|
REMOVING CONC (CURB)
|
LF
|
170.000
|
$14.000
|
$16.000
|
$30.000
|
$24.090
|
|
|
REMOVING CONC (FLUME)
|
SY
|
15.000
|
$50.000
|
$20.000
|
$25.000
|
$169.550
|
|
|
REMOV STAB BASE AND ASPH PAV (0"-12")
|
SY
|
760.000
|
$15.000
|
$10.500
|
$15.000
|
$10.950
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
65,897.000
|
$10.000
|
$11.900
|
$10.000
|
$9.040
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
1,367.000
|
$20.000
|
$12.000
|
$25.000
|
$24.920
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
19,934.000
|
$11.500
|
$12.600
|
$15.000
|
$14.560
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
77.300
|
$600.000
|
$605.000
|
$612.000
|
$587.400
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
38.650
|
$600.000
|
$440.000
|
$550.000
|
$423.500
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
38.650
|
$600.000
|
$550.000
|
$550.000
|
$506.000
|
|
|
VEGETATIVE WATERING
|
MG
|
5,837.000
|
$40.000
|
$50.000
|
$50.000
|
$73.920
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
10,309.000
|
$55.000
|
$62.000
|
$60.800
|
$67.040
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
900.000
|
$170.000
|
$325.000
|
$400.000
|
$401.900
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
66,051.000
|
$2.750
|
$3.600
|
$3.250
|
$8.600
|
|
|
PRIME COAT (MC-30)
|
GAL
|
11,364.000
|
$5.000
|
$6.500
|
$8.000
|
$6.520
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
22,728.000
|
$5.000
|
$7.500
|
$6.500
|
$5.790
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
457.000
|
$90.000
|
$180.000
|
$150.000
|
$423.710
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
28,670.000
|
$32.000
|
$41.000
|
$35.000
|
$45.370
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
3,572.000
|
$4.000
|
$8.000
|
$10.000
|
$4.830
|
|
|
FLOWABLE BACKFILL
|
CY
|
5.000
|
$250.000
|
$1,600.000
|
$625.000
|
$550.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,877.000
|
$35.000
|
$60.000
|
$95.000
|
$82.500
|
|
|
REINF CONC SLAB (EXTEND SLAB)
|
SF
|
8,907.000
|
$26.000
|
$60.000
|
$63.250
|
$60.500
|
|
|
APPROACH SLAB
|
CY
|
82.600
|
$460.000
|
$1,443.000
|
$1,510.000
|
$1,443.200
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
261.000
|
$600.000
|
$635.000
|
$875.000
|
$770.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
202.900
|
$700.000
|
$645.000
|
$1,000.000
|
$880.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
33.000
|
$250.000
|
$110.000
|
$200.000
|
$548.620
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
330.000
|
$600.000
|
$670.000
|
$840.000
|
$880.000
|
|
|
RAIL (TY SSTR)
|
LF
|
394.000
|
$60.000
|
$247.000
|
$80.000
|
$247.500
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
34.000
|
$180.000
|
$330.000
|
$230.000
|
$330.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
92.000
|
$110.000
|
$363.000
|
$380.000
|
$363.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
6.000
|
$650.000
|
$850.000
|
$875.000
|
$770.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
20.000
|
$700.000
|
$768.000
|
$940.000
|
$825.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
10.000
|
$750.000
|
$855.000
|
$970.000
|
$852.500
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
12.000
|
$800.000
|
$820.000
|
$1,000.000
|
$880.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
10.000
|
$900.000
|
$907.000
|
$1,060.000
|
$935.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
4.000
|
$900.000
|
$908.000
|
$1,060.000
|
$935.000
|
|
|
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
|
LF
|
32.000
|
$1,200.000
|
$1,020.000
|
$1,200.000
|
$1,045.000
|
|
|
CONC BOX CULV (5 FT X 6 FT) (EXTEND)
|
LF
|
5.000
|
$1,200.000
|
$995.000
|
$1,125.000
|
$990.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
1,338.000
|
$150.000
|
$200.000
|
$250.000
|
$220.000
|
|
|
WINGWALL (FW - 0) (HW=8 FT)
|
EA
|
1.000
|
$23,000.000
|
$19,500.000
|
$23,750.000
|
$20,900.000
|
|
|
WINGWALL (FW - 0) (HW=9 FT)
|
EA
|
1.000
|
$37,000.000
|
$30,000.000
|
$40,000.000
|
$35,200.000
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
2.000
|
$15,000.000
|
$12,000.000
|
$15,625.000
|
$13,750.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
4.000
|
$17,000.000
|
$8,200.000
|
$10,625.000
|
$9,350.000
|
|
|
SET (TY I)(S=3 FT)(HW= 5 FT)(4:1)(C)
|
EA
|
2.000
|
$22,000.000
|
$9,000.000
|
$13,125.000
|
$11,550.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$23,000.000
|
$9,500.000
|
$13,125.000
|
$11,550.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
8.000
|
$5,000.000
|
$11,500.000
|
$15,000.000
|
$13,200.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
10.000
|
$18,000.000
|
$14,300.000
|
$18,750.000
|
$16,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
6.000
|
$10,000.000
|
$15,200.000
|
$20,625.000
|
$18,150.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
2.000
|
$32,000.000
|
$16,500.000
|
$22,500.000
|
$19,800.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 8 FT)(4: 1) (C)
|
EA
|
1.000
|
$40,000.000
|
$15,000.000
|
$25,000.000
|
$22,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$22,000.000
|
$16,500.000
|
$22,500.000
|
$19,800.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
2.000
|
$32,000.000
|
$20,000.000
|
$29,375.000
|
$25,850.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 8 FT)(4:1) (C)
|
EA
|
18.000
|
$6,000.000
|
$14,900.000
|
$30,000.000
|
$26,400.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
46.000
|
$2,100.000
|
$1,620.000
|
$2,000.000
|
$1,760.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
12.000
|
$2,000.000
|
$1,320.000
|
$2,500.000
|
$2,200.000
|
|
|
HYDRO-DEMOLITION (4 IN)
|
SY
|
946.000
|
$160.000
|
$500.000
|
$535.000
|
$513.700
|
|
|
REMOV STR (SET)
|
EA
|
24.000
|
$900.000
|
$715.000
|
$940.000
|
$825.000
|
|
|
REMOV STR (PICNIC AREA)
|
EA
|
1.000
|
$5,000.000
|
$9,500.000
|
$6,000.000
|
$5,346.550
|
|
|
REMOV STR (PIPE)
|
EA
|
12.000
|
$400.000
|
$450.000
|
$2,500.000
|
$2,200.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
2.000
|
$10,000.000
|
$13,200.000
|
$17,710.000
|
$16,940.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,059,600.000
|
$983,000.000
|
$1,250,000.000
|
$750,499.080
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$10,000.000
|
$15,000.000
|
$5,000.000
|
$19,910.940
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,430.000
|
$2.000
|
$2.650
|
$7.000
|
$6.950
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,430.000
|
$1.000
|
$1.100
|
$2.000
|
$2.440
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
4,383.000
|
$5.000
|
$4.000
|
$7.000
|
$6.490
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,383.000
|
$2.000
|
$1.000
|
$2.000
|
$1.060
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
6.000
|
$5,000.000
|
$6,000.000
|
$10,000.000
|
$14,850.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
1,680.000
|
$10.000
|
$18.000
|
$25.000
|
$24.400
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,680.000
|
$11.000
|
$10.000
|
$18.000
|
$9.480
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,680.000
|
$10.000
|
$18.000
|
$25.000
|
$22.150
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,287.000
|
$45.000
|
$44.000
|
$55.000
|
$38.520
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
3,386.000
|
$20.000
|
$28.500
|
$42.000
|
$44.640
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
85,871.000
|
$0.600
|
$0.210
|
$0.250
|
$0.110
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
42,289.000
|
$0.600
|
$0.210
|
$0.180
|
$0.110
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
4,262.500
|
$25.000
|
$28.000
|
$32.200
|
$29.150
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,200.000
|
$2,300.000
|
$2,700.000
|
$2,695.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
312.500
|
$105.000
|
$82.000
|
$86.250
|
$88.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,100.000
|
$5.000
|
$2.150
|
$3.500
|
$2.200
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$300.000
|
$312.000
|
$350.000
|
$220.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
22.000
|
$3,000.000
|
$3,975.000
|
$4,025.000
|
$3,465.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$450.000
|
$330.000
|
$350.000
|
$220.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,400.000
|
$3,080.000
|
$2,875.000
|
$1,438.550
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$900.000
|
$1,320.000
|
$1,725.000
|
$2,149.220
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,500.000
|
$8,600.000
|
$8,625.000
|
$12,450.810
|
|
|
WIRE FENCE (TY A)
|
LF
|
1,334.000
|
$20.000
|
$25.000
|
$28.750
|
$20.980
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$400.000
|
$800.000
|
$625.000
|
$550.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
4.000
|
$300.000
|
$265.000
|
$310.000
|
$275.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
12.000
|
$850.000
|
$1,010.000
|
$1,075.000
|
$946.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
2.000
|
$800.000
|
$1,023.000
|
$1,100.000
|
$962.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
8.000
|
$1,200.000
|
$1,030.000
|
$1,125.000
|
$990.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
5.000
|
$1,000.000
|
$1,320.000
|
$1,575.000
|
$1,375.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,100.000
|
$1,305.000
|
$1,560.000
|
$1,353.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
3.000
|
$950.000
|
$1,475.000
|
$1,725.000
|
$1,518.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
37.000
|
$500.000
|
$585.000
|
$600.000
|
$528.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
22.000
|
$500.000
|
$677.000
|
$690.000
|
$605.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
91.000
|
$100.000
|
$110.000
|
$150.000
|
$121.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$25.000
|
$33.000
|
$28.750
|
$44.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
16.000
|
$115.000
|
$50.000
|
$100.000
|
$88.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
70.000
|
$40.000
|
$33.000
|
$40.000
|
$44.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
42.000
|
$60.000
|
$59.000
|
$100.000
|
$88.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
65.000
|
$1.000
|
$2.300
|
$5.000
|
$8.120
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
9,116.000
|
$1.000
|
$1.100
|
$2.500
|
$4.290
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
795.000
|
$1.000
|
$1.100
|
$1.900
|
$1.820
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
81.000
|
$1.000
|
$2.200
|
$2.500
|
$2.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,127.000
|
$1.000
|
$1.100
|
$25.000
|
$1.490
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
75,288.000
|
$0.150
|
$0.160
|
$0.300
|
$0.280
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
24.000
|
$3.000
|
$16.500
|
$6.000
|
$5.500
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
101,668.000
|
$0.150
|
$0.160
|
$0.300
|
$0.280
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
3,950.000
|
$0.500
|
$0.610
|
$1.250
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
86,185.000
|
$0.500
|
$0.520
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
250.000
|
$0.500
|
$1.100
|
$1.250
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
83,868.000
|
$0.500
|
$0.510
|
$0.500
|
$0.500
|
|
PREFAB PAV MRK TY B (W)(24")(SLD)
|
LF
|
157.000
|
$25.000
|
$17.000
|
$30.000
|
$27.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
9.000
|
$600.000
|
$275.000
|
$300.000
|
$275.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
5.000
|
$400.000
|
$385.000
|
$410.000
|
$390.500
|
|
PREFAB PAV MRK TY C (Y) (12") (SLD)
|
LF
|
413.000
|
$20.000
|
$8.800
|
$10.000
|
$9.630
|
|
REFL PAV MRKR TY I-C
|
EA
|
268.000
|
$4.000
|
$3.880
|
$6.500
|
$6.050
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
688.000
|
$3.000
|
$3.500
|
$6.500
|
$6.050
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
158,387.000
|
$0.550
|
$0.720
|
$0.500
|
$0.440
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
24.000
|
$4.000
|
$55.000
|
$6.000
|
$5.500
|
|
|
SP MIXES SP-D SAC-B PG70-22
|
TON
|
28,900.000
|
$125.000
|
$138.000
|
$138.250
|
$155.470
|
|
|
TACK COAT
|
GAL
|
21,067.000
|
$4.000
|
$5.900
|
$1.000
|
$5.870
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$13,400.000
|
$20,000.000
|
$14,184.700
|
|
|
TMA (STATIONARY)
|
DAY
|
160.000
|
$200.000
|
$165.000
|
$300.000
|
$414.660
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
85.000
|
$200.000
|
$275.000
|
$300.000
|
$553.350
|
|
Totals: |
$11,801,188.000
|
$14,078,926.720
|
$15,226,206.495
|
$15,997,858.310
|