NOLAN SH 153 (0650-01-035)

Items: 127

County: NOLAN
Length: N/A
Highway: SH 153
District: ABILENE
Control Number: 0650-01-035
DBE Goal: N/A
Project: F 2023(103)
Guaranty: N/A
Time: 349 WORKING DAYS
Engineer's Estimate: $11,801,188.00
Date: 09/08/2022 (3 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
RYAN SAYLES
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$11,801,188.00
$14,078,926.72
Over/Under Est: 19.3% $2,277,738.72
Over/Under Est: 29.02% $3,425,018.49
Amt Left: 8.15% $1,147,279.77
$15,997,858.30
Over/Under Est: 35.56% $4,196,670.30
Amt Left: 13.63% $1,918,931.58
Delta: -5.07% -$771,651.81
Subcontractor Percentage Amount
HODGES AND SON CONSTRUCTION COMPANY, INC. 5.31% $747,299.81
HJC FARMS, INC. 3.00% $422,203.28
TRP CONSTRUCTION GROUP, LLC 1.58% $222,360.39
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.83% $116,809.57
AGGREGATE TECHNOLOGIES, INC. 0.60% $84,440.66
BARRICADES UNLIMITED 0.57% $80,218.62
DK CONTRACTING, LLC 0.53% $74,589.25
CONTRACTORS SERVICE, LTD. 0.28% $39,405.64
LINE QUEST LLC 0.13% $18,295.48
TRP CONSTRUCTION GROUP, LLC 0.08% $11,258.75
WEST TEXAS RUMBLE STRIP LLC 0.03% $4,222.03
VERIFIED LLC 0.02% $2,814.69
Total: 12.96% $1,823,918.17

Bid Items & Bid Tabulations

127 Total 0 of 127
NOLAN  |  SH 153  |  ABILENE  |  0650-01-035  |  09/08/2022  |  $11,801,188.00  |  F 2023(103)  |  WIDEN ROAD - ADD LANES  |  349 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
NOBLES ROAD CONSTRUCTION, INC.
J. H. STRAIN & SONS, INC.
RK HALL, LLC
PREPARING ROW
STA 210.000 $500.000 $390.000 $1,100.000 $474.510
REMOVING CONC (RIPRAP)
SY 202.000 $50.000 $16.000 $50.000 $141.960
REMOVING CONC (SIDEWALKS)
SY 55.000 $50.000 $16.000 $50.000 $70.760
REMOVING CONC (CURB)
LF 170.000 $14.000 $16.000 $30.000 $24.090
REMOVING CONC (FLUME)
SY 15.000 $50.000 $20.000 $25.000 $169.550
REMOV STAB BASE AND ASPH PAV (0"-12")
SY 760.000 $15.000 $10.500 $15.000 $10.950
EXCAVATION (ROADWAY)
CY 65,897.000 $10.000 $11.900 $10.000 $9.040
EXCAVATION (CHANNEL)
CY 1,367.000 $20.000 $12.000 $25.000 $24.920
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 19,934.000 $11.500 $12.600 $15.000 $14.560
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 77.300 $600.000 $605.000 $612.000 $587.400
DRILL SEEDING (TEMP) (WARM)
AC 38.650 $600.000 $440.000 $550.000 $423.500
DRILL SEEDING (TEMP) (COOL)
AC 38.650 $600.000 $550.000 $550.000 $506.000
VEGETATIVE WATERING
MG 5,837.000 $40.000 $50.000 $50.000 $73.920
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 10,309.000 $55.000 $62.000 $60.800 $67.040
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 900.000 $170.000 $325.000 $400.000 $401.900
LIME TRT (SUBGRADE)(6")
SY 66,051.000 $2.750 $3.600 $3.250 $8.600
PRIME COAT (MC-30)
GAL 11,364.000 $5.000 $6.500 $8.000 $6.520
ASPH (AC-20-5TR)
GAL 22,728.000 $5.000 $7.500 $6.500 $5.790
AGGR(TY-PB GR-3 SAC-B)
CY 457.000 $90.000 $180.000 $150.000 $423.710
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 28,670.000 $32.000 $41.000 $35.000 $45.370
PLANE ASPH CONC PAV(0" TO 2")
SY 3,572.000 $4.000 $8.000 $10.000 $4.830
FLOWABLE BACKFILL
CY 5.000 $250.000 $1,600.000 $625.000 $550.000
TEMPORARY SPL SHORING
SF 2,877.000 $35.000 $60.000 $95.000 $82.500
REINF CONC SLAB (EXTEND SLAB)
SF 8,907.000 $26.000 $60.000 $63.250 $60.500
APPROACH SLAB
CY 82.600 $460.000 $1,443.000 $1,510.000 $1,443.200
RIPRAP (CONC)(4 IN)
CY 261.000 $600.000 $635.000 $875.000 $770.000
RIPRAP (CONC)(5 IN)
CY 202.900 $700.000 $645.000 $1,000.000 $880.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 33.000 $250.000 $110.000 $200.000 $548.620
RIPRAP (MOW STRIP)(4 IN)
CY 330.000 $600.000 $670.000 $840.000 $880.000
RAIL (TY SSTR)
LF 394.000 $60.000 $247.000 $80.000 $247.500
RETROFIT RAIL (TY SSTR)
LF 34.000 $180.000 $330.000 $230.000 $330.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 92.000 $110.000 $363.000 $380.000 $363.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 6.000 $650.000 $850.000 $875.000 $770.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 20.000 $700.000 $768.000 $940.000 $825.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 10.000 $750.000 $855.000 $970.000 $852.500
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 12.000 $800.000 $820.000 $1,000.000 $880.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 10.000 $900.000 $907.000 $1,060.000 $935.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 4.000 $900.000 $908.000 $1,060.000 $935.000
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
LF 32.000 $1,200.000 $1,020.000 $1,200.000 $1,045.000
CONC BOX CULV (5 FT X 6 FT) (EXTEND)
LF 5.000 $1,200.000 $995.000 $1,125.000 $990.000
RC PIPE (ARCH)(CL III)(DES 1)
LF 1,338.000 $150.000 $200.000 $250.000 $220.000
WINGWALL (FW - 0) (HW=8 FT)
EA 1.000 $23,000.000 $19,500.000 $23,750.000 $20,900.000
WINGWALL (FW - 0) (HW=9 FT)
EA 1.000 $37,000.000 $30,000.000 $40,000.000 $35,200.000
WINGWALL (FW - S) (HW=5 FT)
EA 2.000 $15,000.000 $12,000.000 $15,625.000 $13,750.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 4.000 $17,000.000 $8,200.000 $10,625.000 $9,350.000
SET (TY I)(S=3 FT)(HW= 5 FT)(4:1)(C)
EA 2.000 $22,000.000 $9,000.000 $13,125.000 $11,550.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $23,000.000 $9,500.000 $13,125.000 $11,550.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 8.000 $5,000.000 $11,500.000 $15,000.000 $13,200.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 10.000 $18,000.000 $14,300.000 $18,750.000 $16,500.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
EA 6.000 $10,000.000 $15,200.000 $20,625.000 $18,150.000
SET (TY I)(S= 5 FT)(HW= 7 FT)(4:1) (C)
EA 2.000 $32,000.000 $16,500.000 $22,500.000 $19,800.000
SET (TY I)(S= 5 FT)(HW= 8 FT)(4: 1) (C)
EA 1.000 $40,000.000 $15,000.000 $25,000.000 $22,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $22,000.000 $16,500.000 $22,500.000 $19,800.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
EA 2.000 $32,000.000 $20,000.000 $29,375.000 $25,850.000
SET (TY I)(S= 6 FT)(HW= 8 FT)(4:1) (C)
EA 18.000 $6,000.000 $14,900.000 $30,000.000 $26,400.000
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 46.000 $2,100.000 $1,620.000 $2,000.000 $1,760.000
CLEAN EXIST CULVERTS
EA 12.000 $2,000.000 $1,320.000 $2,500.000 $2,200.000
HYDRO-DEMOLITION (4 IN)
SY 946.000 $160.000 $500.000 $535.000 $513.700
REMOV STR (SET)
EA 24.000 $900.000 $715.000 $940.000 $825.000
REMOV STR (PICNIC AREA)
EA 1.000 $5,000.000 $9,500.000 $6,000.000 $5,346.550
REMOV STR (PIPE)
EA 12.000 $400.000 $450.000 $2,500.000 $2,200.000
REMOV STR (APPROACH SLAB)
EA 2.000 $10,000.000 $13,200.000 $17,710.000 $16,940.000
MOBILIZATION
LS 1.000 $1,059,600.000 $983,000.000 $1,250,000.000 $750,499.080
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $10,000.000 $15,000.000 $5,000.000 $19,910.940
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,430.000 $2.000 $2.650 $7.000 $6.950
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,430.000 $1.000 $1.100 $2.000 $2.440
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 4,383.000 $5.000 $4.000 $7.000 $6.490
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,383.000 $2.000 $1.000 $2.000 $1.060
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 6.000 $5,000.000 $6,000.000 $10,000.000 $14,850.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 1,680.000 $10.000 $18.000 $25.000 $24.400
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,680.000 $11.000 $10.000 $18.000 $9.480
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 1,680.000 $10.000 $18.000 $25.000 $22.150
DRIVEWAYS (ACP)
SY 2,287.000 $45.000 $44.000 $55.000 $38.520
DRIVEWAYS (SURF TREAT)
SY 3,386.000 $20.000 $28.500 $42.000 $44.640
RUMBLE STRIPS (SHOULDER)
LF 85,871.000 $0.600 $0.210 $0.250 $0.110
RUMBLE STRIPS (CENTERLINE)
LF 42,289.000 $0.600 $0.210 $0.180 $0.110
MTL W-BEAM GD FEN (TIM POST)
LF 4,262.500 $25.000 $28.000 $32.200 $29.150
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,200.000 $2,300.000 $2,700.000 $2,695.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 312.500 $105.000 $82.000 $86.250 $88.000
REMOVE METAL BEAM GUARD FENCE
LF 2,100.000 $5.000 $2.150 $3.500 $2.200
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $300.000 $312.000 $350.000 $220.000
GUARDRAIL END TREATMENT (INSTALL)
EA 22.000 $3,000.000 $3,975.000 $4,025.000 $3,465.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $450.000 $330.000 $350.000 $220.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,400.000 $3,080.000 $2,875.000 $1,438.550
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $900.000 $1,320.000 $1,725.000 $2,149.220
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $8,500.000 $8,600.000 $8,625.000 $12,450.810
WIRE FENCE (TY A)
LF 1,334.000 $20.000 $25.000 $28.750 $20.980
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $400.000 $800.000 $625.000 $550.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 4.000 $300.000 $265.000 $310.000 $275.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $850.000 $1,010.000 $1,075.000 $946.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 2.000 $800.000 $1,023.000 $1,100.000 $962.500
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 8.000 $1,200.000 $1,030.000 $1,125.000 $990.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 5.000 $1,000.000 $1,320.000 $1,575.000 $1,375.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,100.000 $1,305.000 $1,560.000 $1,353.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 3.000 $950.000 $1,475.000 $1,725.000 $1,518.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 37.000 $500.000 $585.000 $600.000 $528.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 22.000 $500.000 $677.000 $690.000 $605.000
REMOVE SM RD SN SUP&AM
EA 91.000 $100.000 $110.000 $150.000 $121.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $25.000 $33.000 $28.750 $44.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 16.000 $115.000 $50.000 $100.000 $88.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 70.000 $40.000 $33.000 $40.000 $44.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 42.000 $60.000 $59.000 $100.000 $88.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 65.000 $1.000 $2.300 $5.000 $8.120
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 9,116.000 $1.000 $1.100 $2.500 $4.290
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 795.000 $1.000 $1.100 $1.900 $1.820
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 81.000 $1.000 $2.200 $2.500 $2.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,127.000 $1.000 $1.100 $25.000 $1.490
REFL PAV MRK TY II (W) 4" (SLD)
LF 75,288.000 $0.150 $0.160 $0.300 $0.280
REFL PAV MRK TY II (W) 24" (SLD)
LF 24.000 $3.000 $16.500 $6.000 $5.500
REFL PAV MRK TY II (Y) 4" (SLD)
LF 101,668.000 $0.150 $0.160 $0.300 $0.280
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,950.000 $0.500 $0.610 $1.250 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 86,185.000 $0.500 $0.520 $0.500 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 250.000 $0.500 $1.100 $1.250 $1.100
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 83,868.000 $0.500 $0.510 $0.500 $0.500
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 157.000 $25.000 $17.000 $30.000 $27.500
PREFAB PAV MRK TY C (W) (ARROW)
EA 9.000 $600.000 $275.000 $300.000 $275.000
PREFAB PAV MRK TY C (W) (WORD)
EA 5.000 $400.000 $385.000 $410.000 $390.500
PREFAB PAV MRK TY C (Y) (12") (SLD)
LF 413.000 $20.000 $8.800 $10.000 $9.630
REFL PAV MRKR TY I-C
EA 268.000 $4.000 $3.880 $6.500 $6.050
REFL PAV MRKR TY II-A-A
EA 688.000 $3.000 $3.500 $6.500 $6.050
ELIM EXT PAV MRK & MRKS (4")
LF 158,387.000 $0.550 $0.720 $0.500 $0.440
ELIM EXT PAV MRK & MRKS (24")
LF 24.000 $4.000 $55.000 $6.000 $5.500
SP MIXES SP-D SAC-B PG70-22
TON 28,900.000 $125.000 $138.000 $138.250 $155.470
TACK COAT
GAL 21,067.000 $4.000 $5.900 $1.000 $5.870
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $13,400.000 $20,000.000 $14,184.700
TMA (STATIONARY)
DAY 160.000 $200.000 $165.000 $300.000 $414.660
TMA (MOBILE OPERATION)
DAY 85.000 $200.000 $275.000 $300.000 $553.350
Totals: $11,801,188.000 $14,078,926.720 $15,226,206.495 $15,997,858.310