NOLAN SH 70 (0006-15-038)

Items: 82

County: NOLAN
Length: N/A
Highway: SH 70
District: ABILENE
Control Number: 0006-15-038
DBE Goal: 600.0%
Project: BR 2024(662)
Guaranty: N/A
Time: 166 WORKING DAYS
Engineer's Estimate: $5,536,142.48
Date: 06/05/2024 (2 years ago) Changed
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
RYAN SAYLES
LARISSA HALFORD
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$5,536,142.48
Over/Under Est: 52.48% $2,905,560.52
Subcontractor Percentage Amount
NOBLES ROAD CONSTRUCTION, INC. 5.18% $437,280.22
F & W ELECTRICAL CONTRACTORS, INC. 1.50% $126,625.55
JB PINNACLE GROUP, LLC 1.39% $117,339.67
MORRIS COUNTY CONTRACTORS, L.L.C. 0.46% $38,831.83
TORO BRAVO CONSTRUCTION, LLC 0.39% $32,922.64
FC TRAFFIC CONTROL, INC. 0.32% $27,013.45
TRP CONSTRUCTION GROUP, LLC 0.30% $25,325.11
TEXOP CONSTRUCTION 0.27% $22,792.60
S&S BRIDGE PAINTING 0.16% $13,506.72
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.06% $5,065.02
Total: 10.03% $846,702.81

Bid Items & Bid Tabulations

82 Total 0 of 82
NOLAN  |  SH 70  |  ABILENE  |  0006-15-038  |  06/05/2024  |  $5,536,142.48  |  BR 2024(662)  |  BRIDGE REPL  |  166 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HODGES AND SON CONSTRUCTION COMPANY, INC.
REMOVING CONC (RIPRAP)
SY 1,389.000 $110.000 $100.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 5,930.000 $20.000 $60.000
EXCAVATION (ROADWAY)
CY 10,225.000 $25.000 $60.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 4,065.000 $60.000 $60.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 10,094.000 $1.300 $2.000
VEGETATIVE WATERING
MG 66.000 $450.000 $1.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 1,480.000 $110.000 $100.000
CEMENT
TON 94.000 $325.000 $400.000
CEMENT TREAT (SUBGRADE) (8")
SY 4,438.000 $10.000 $25.000
CEMENT TREAT (NEW BASE)(12")
SY 4,438.000 $8.000 $35.000
PRIME COAT (MC-30)
GAL 1,110.000 $20.000 $15.000
CEM STABIL BKFL
CY 137.000 $700.000 $300.000
TEMPORARY SPL SHORING
SF 280.000 $100.000 $300.000
DRILL SHAFT (18 IN)
LF 154.000 $300.000 $250.000
DRILL SHAFT (36 IN)
LF 308.000 $420.000 $400.000
DRILL SHAFT (42 IN)
LF 156.000 $480.000 $500.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 32.000 $500.000 $400.000
CL C CONC (ABUT)(HPC)
CY 60.800 $2,600.000 $3,500.000
CL C CONC (CAP)(HPC)
CY 43.700 $2,600.000 $4,000.000
CL C CONC (COLUMN)(HPC)
CY 40.800 $2,900.000 $4,000.000
REINF CONC SLAB
SF 10,770.000 $54.000 $65.000
APPROACH SLAB
CY 64.200 $1,700.000 $2,000.000
PRESTR CONC GIRDER (TX46)
LF 1,340.400 $400.000 $440.000
SILICONE RESIN PAINT FINISH
SF 1,787.000 $23.000 $20.000
RIPRAP (CONC)(4 IN)
CY 330.400 $1,800.000 $800.000
RIPRAP (MOW STRIP)(4 IN)
CY 27.000 $2,000.000 $800.000
RAIL (TY SSTR)
LF 602.600 $300.000 $300.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 79.000 $430.000 $300.000
RC PIPE (CL III)(24 IN)
LF 100.000 $200.000 $160.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $10,000.000 $15,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $3,100.000 $5,000.000
REMOV STR (INLET)
EA 1.000 $2,000.000 $5,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $100,000.000 $1,000,000.000
REMOV STR (PIPE)
EA 1.000 $2,000.000 $500.000
MOBILIZATION
LS 1.000 $503,285.680 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $15,000.000 $80,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 444.000 $100.000 $1.000
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $25.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 60.000 $14.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 60.000 $6.000 $1.000
CONSTRUCTING DETOURS
SY 953.000 $240.000 $300.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 870.000 $50.000 $80.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 870.000 $35.000 $80.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 79.000 $300.000 $120.000
MTL W-BEAM GD FEN (TIM POST)
LF 350.000 $50.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,750.000 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $10.000 $5.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 3.000 $500.000 $1,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $4,500.000 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $500.000 $500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $4,500.000 $2,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $13,000.000 $20,000.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 4.000 $5,200.000 $10,000.000
CONDT (PVC) (SCH 40) (2")
LF 470.000 $30.000 $40.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 190.000 $40.000 $60.000
CONDT (PVC) (SCH 40) (2") (CONC ENCSE)
LF 290.000 $50.000 $40.000
ELEC CONDR (NO.8) BARE
LF 980.000 $5.000 $2.000
ELEC CONDR (NO.8) INSULATED
LF 1,960.000 $6.000 $4.000
GROUND BOX TY A (122311)W/APRON
EA 2.000 $2,200.000 $3,000.000
REMOVE GROUND BOX
EA 3.000 $650.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $1,200.000 $2,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,500.000 $2,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 1.000 $3,000.000 $3,000.000
REMOVE SM RD SN SUP&AM
EA 7.000 $330.000 $500.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 2.000 $100.000 $200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 3.000 $50.000 $60.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 3.000 $50.000 $60.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 4.000 $40.000 $60.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
EA 4.000 $40.000 $60.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 754.000 $1.250 $5.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 494.000 $1.500 $5.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 136.000 $1.750 $10.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 79.000 $2.000 $10.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 533.000 $3.000 $5.000
PAVEMENT SEALER 6"
LF 720.000 $1.500 $2.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 72.000 $1.650 $5.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 1,200.000 $1.700 $5.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 1,669.000 $1.700 $5.000
REFL PAV MRKR TY II-C-R
EA 21.000 $10.000 $25.000
SP MIXES SP-C SAC-A PG76-22
TON 716.000 $200.000 $375.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 1.000 $18,000.000 $30,000.000
TMA (STATIONARY)
DAY 52.000 $400.000 $300.000
Totals: $5,536,142.480 $8,441,703.000