REMOVING CONC (RIPRAP)
|
SY
|
1,389.000
|
$110.000
|
$100.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
5,930.000
|
$20.000
|
$60.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,225.000
|
$25.000
|
$60.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
4,065.000
|
$60.000
|
$60.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
10,094.000
|
$1.300
|
$2.000
|
|
|
VEGETATIVE WATERING
|
MG
|
66.000
|
$450.000
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
1,480.000
|
$110.000
|
$100.000
|
|
|
CEMENT
|
TON
|
94.000
|
$325.000
|
$400.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
4,438.000
|
$10.000
|
$25.000
|
|
|
CEMENT TREAT (NEW BASE)(12")
|
SY
|
4,438.000
|
$8.000
|
$35.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,110.000
|
$20.000
|
$15.000
|
|
|
CEM STABIL BKFL
|
CY
|
137.000
|
$700.000
|
$300.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
280.000
|
$100.000
|
$300.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
154.000
|
$300.000
|
$250.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
308.000
|
$420.000
|
$400.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
156.000
|
$480.000
|
$500.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
32.000
|
$500.000
|
$400.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
60.800
|
$2,600.000
|
$3,500.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
43.700
|
$2,600.000
|
$4,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
40.800
|
$2,900.000
|
$4,000.000
|
|
|
REINF CONC SLAB
|
SF
|
10,770.000
|
$54.000
|
$65.000
|
|
|
APPROACH SLAB
|
CY
|
64.200
|
$1,700.000
|
$2,000.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
1,340.400
|
$400.000
|
$440.000
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
1,787.000
|
$23.000
|
$20.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
330.400
|
$1,800.000
|
$800.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
27.000
|
$2,000.000
|
$800.000
|
|
|
RAIL (TY SSTR)
|
LF
|
602.600
|
$300.000
|
$300.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
79.000
|
$430.000
|
$300.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
100.000
|
$200.000
|
$160.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$10,000.000
|
$15,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$3,100.000
|
$5,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$2,000.000
|
$5,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$100,000.000
|
$1,000,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
1.000
|
$2,000.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$503,285.680
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$15,000.000
|
$80,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
444.000
|
$100.000
|
$1.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.000
|
$25.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
60.000
|
$14.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
60.000
|
$6.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
953.000
|
$240.000
|
$300.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
870.000
|
$50.000
|
$80.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
870.000
|
$35.000
|
$80.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
79.000
|
$300.000
|
$120.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
350.000
|
$50.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,750.000
|
$2,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$10.000
|
$5.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$500.000
|
$1,000.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$4,500.000
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$500.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$4,500.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$13,000.000
|
$20,000.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
4.000
|
$5,200.000
|
$10,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
470.000
|
$30.000
|
$40.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
190.000
|
$40.000
|
$60.000
|
|
|
CONDT (PVC) (SCH 40) (2") (CONC ENCSE)
|
LF
|
290.000
|
$50.000
|
$40.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
980.000
|
$5.000
|
$2.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,960.000
|
$6.000
|
$4.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
2.000
|
$2,200.000
|
$3,000.000
|
|
|
REMOVE GROUND BOX
|
EA
|
3.000
|
$650.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$1,200.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,500.000
|
$2,000.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
1.000
|
$3,000.000
|
$3,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
7.000
|
$330.000
|
$500.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
2.000
|
$100.000
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
3.000
|
$50.000
|
$60.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
3.000
|
$50.000
|
$60.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
|
EA
|
4.000
|
$40.000
|
$60.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
|
EA
|
4.000
|
$40.000
|
$60.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
754.000
|
$1.250
|
$5.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
494.000
|
$1.500
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
136.000
|
$1.750
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
79.000
|
$2.000
|
$10.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
533.000
|
$3.000
|
$5.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
720.000
|
$1.500
|
$2.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
72.000
|
$1.650
|
$5.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
1,200.000
|
$1.700
|
$5.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
1,669.000
|
$1.700
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
21.000
|
$10.000
|
$25.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
716.000
|
$200.000
|
$375.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
1.000
|
$18,000.000
|
$30,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
52.000
|
$400.000
|
$300.000
|
|
Totals: |
$5,536,142.480
|
$8,441,703.000
|