Items: 34

County: NEWTON
Length: N/A
Highway: FM2829
District: BEAUMONT
Control Number: 6335-67-001
DBE Goal: N/A
Project: RMC - 633567001
Guaranty: N/A
Time: 39 W
Engineer's Estimate: $824,166.12
Date: 02/05/2019 (7 years ago)
Contract Number: N/A
Type: FM 2829 OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$824,166.12
$735,833.54
Over/Under Est: -10.72% -$88,332.58
Over/Under Est: 20.9% $172,228.78
Amt Left: 35.41% $260,561.36

Bid Items & Bid Tabulations

34 Total 0 of 34
NEWTON  |  FM2829  |  BEAUMONT  |  6335-67-001  |  02/05/2019  |  $824,166.12  |  RMC - 633567001  |  FM 2829 OVERLAY  |  39 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
PTSS INVESTMENTS, LLC
BACKFILL (TY A)
STA 105.920 $159.950 $412.000 $850.000
BLOCK SODDING
SY 260.000 $18.000 $7.500 $8.500
VEGETATIVE WATERING
MG 13.000 $50.000 $145.000 $50.000
D-GR HMA(SQ) TY-C SAC-B PG76-22
TON 3,652.000 $100.000 $105.000 $110.000
CEM STABIL BKFL
CY 13.000 $250.000 $100.000 $220.000
CUT & RESTORE ASPH PAVING
SY 20.000 $200.000 $100.000 $200.000
TRENCH EXCAVATION PROTECTION
LF 120.000 $10.000 $12.000 $58.000
RIPRAP (CONC)(5 IN)
CY 7.800 $450.000 $595.000 $1,000.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 36.000 $1,887.160 $725.000 $2,550.000
RC PIPE (CL III)(18 IN)
LF 24.000 $125.000 $195.000 $175.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 6.000 $9,000.000 $5,000.000 $9,300.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 6.000 $1,700.000 $1,825.000 $1,500.000
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 2.000 $1,500.000 $2,250.000 $1,750.000
CLEAN EXIST CULVERTS
EA 5.000 $1,000.000 $1,850.000 $4,500.000
REMOV STR (HEADWALL)
EA 8.000 $2,000.000 $1,300.000 $2,000.000
MOBILIZATION
LS 1.000 $98,182.220 $73,000.000 $64,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $3,500.000 $500.000 $3,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 750.000 $5.810 $5.500 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 750.000 $1.150 $1.000 $1.500
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 3.000 $12,000.000 $4,725.000 $10,000.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 1,142.000 $21.850 $22.000 $50.000
DRIVEWAYS (BASE)
SY 1,142.000 $31.120 $17.000 $45.000
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 9,854.000 $0.320 $0.750 $0.750
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 4.000 $80.000 $155.000 $165.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 8.000 $80.000 $26.000 $30.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,089.000 $1.150 $1.000 $2.500
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 21,255.000 $0.310 $0.400 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 1,820.000 $0.320 $0.400 $0.420
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 10,760.000 $0.310 $0.400 $0.400
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 25.000 $14.250 $15.000 $16.500
TRAFFIC BUTTON TY II-A-A
EA 256.000 $4.110 $4.000 $4.500
TREE TRIMMING / BRUSH REMOVAL
MI 1.130 $14,443.720 $23,000.000 $15,000.000
TMA (STATIONARY)
EA 1.000 $13,800.000 $10,000.000 $10,000.000
TMA (MOBILE OPERATION)
HR 16.000 $50.000 $20.000 $25.000
Totals: $824,166.118 $735,833.540 $996,394.900