Show Job Controls
Bid Cobra

NEWTON FM 1414 (1300-01-028)

Items: 60

County: NEWTON
Length: N/A
Highway: FM 1414
District: BEAUMONT
Control Number: 1300-01-028
DBE Goal: 0.0%
Project: C 1300-1-28
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $3,080,076.30
Date: 07/09/2024 (1 year ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
BRYCE BROUSSARD
JIM GRISSOM
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$3,080,076.30
$3,448,292.04
Over/Under Est: 11.95% $368,215.74
Over/Under Est: 17.84% $549,482.87
Amt Left: 5.26% $181,267.13
$4,598,680.78
Over/Under Est: 49.3% $1,518,604.48
Amt Left: 33.36% $1,150,388.74
Delta: -26.70% -$969,121.61
Subcontractor Percentage Amount
UNIVERSAL LAND CLEARING, LLC 10.34% $400,099.03
J & M CONTRACTING, COMPANY 6.66% $257,704.01
LELAND & BRADLEE CONSTRUCTION, INC. 2.88% $111,439.57
AMERICAN REMEDIATION OPTIONS, INC. 2.47% $95,574.91
TRP CONSTRUCTION GROUP, LLC 2.39% $92,479.37
TEXOP CONSTRUCTION 0.92% $35,598.75
INTERSTATE BARRICADES & MARKINGS, INC. 0.27% $10,447.46
Total: 25.93% $1,003,343.10

Bid Items & Bid Tabulations

60 Total 0 of 60
NEWTON  |  FM 1414  |  BEAUMONT  |  1300-01-028  |  07/09/2024  |  $3,080,076.30  |  C 1300-1-28  |  SURF/ROADWAY RESTOR  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
C. E. BARKER, LTD.
PREPARING ROW
STA 280.580 $1,500.000 $1,529.000 $1,655.000 $1,250.000
EXCAVATION (CHANNEL)
CY 5.000 $25.000 $1,420.760 $1,000.000 $77.770
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 77.000 $30.000 $211.680 $75.000 $66.660
BACKFILL (TY A OR B)
STA 280.580 $260.000 $332.610 $300.000 $627.720
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 140.000 $80.000 $331.980 $450.000 $259.230
BROADCAST SEED (TEMP) (WARM)
SY 9,455.000 $0.150 $0.170 $0.250 $0.280
BROADCAST SEED (TEMP) (COOL)
SY 9,455.000 $0.150 $0.170 $0.250 $0.280
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 18,910.000 $0.400 $0.410 $0.540 $0.600
VEGETATIVE WATERING
MG 16.000 $20.000 $110.000 $50.000 $161.100
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 33.000 $7.000 $16.500 $10.000 $11.110
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,800.000 $83.000 $103.310 $98.500 $212.940
PLANE CONC PAV(0" TO 2")
SY 3,662.000 $12.000 $7.010 $8.000 $11.110
CEM STABIL BKFL
CY 12.000 $185.000 $275.000 $250.000 $222.200
CUT & RESTORING PAV
SY 58.000 $150.000 $220.000 $200.000 $211.090
CUT AND RESTORE PAV (FLEX BASE)
SY 94.000 $125.000 $55.000 $50.000 $83.330
TRENCH EXCAVATION PROTECTION
LF 54.000 $28.000 $11.000 $10.000 $3.890
RIPRAP (STONE TY R)(DRY)(12 IN)
CY 1.000 $265.000 $220.000 $200.000 $372.190
RC PIPE (CL III)(18 IN)
LF 304.000 $85.000 $77.000 $70.000 $89.550
RC PIPE (CL III)(24 IN)
LF 146.000 $110.000 $198.000 $180.000 $99.930
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 3.000 $6,420.000 $7,700.000 $7,000.000 $11,110.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 7.000 $800.000 $990.000 $900.000 $1,461.160
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 62.000 $1,600.000 $1,045.000 $950.000 $1,588.630
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 5.000 $1,500.000 $2,200.000 $2,000.000 $1,386.140
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 12.000 $1,500.000 $2,750.000 $2,500.000 $1,781.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 4.000 $3,700.000 $5,500.000 $5,000.000 $2,969.600
REMOV STR (PIPE)
LF 401.000 $15.000 $38.500 $35.000 $33.890
MOBILIZATION
LS 1.000 $277,905.000 $201,941.610 $240,000.000 $450,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $3,000.000 $2,805.000 $5,000.000 $4,900.790
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 300.000 $18.000 $49.500 $35.000 $38.890
ROCK FILTER DAMS (REMOVE)
LF 300.000 $9.000 $16.500 $10.000 $11.110
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 150.000 $5.500 $6.050 $5.000 $5.560
BIODEG EROSN CONT LOGS (REMOVE)
LF 150.000 $2.000 $2.200 $1.500 $1.670
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 3,090.000 $74.000 $64.900 $70.600 $33.330
DRIVEWAYS (BASE)
SY 2,069.000 $34.000 $30.140 $50.500 $55.550
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 39.000 $245.000 $275.000 $280.000 $243.310
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 3.000 $350.000 $302.500 $320.000 $283.310
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $730.000 $825.000 $650.000 $816.590
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 78.000 $495.000 $456.500 $575.000 $542.170
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $800.000 $566.500 $700.000 $612.160
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 8.000 $865.000 $907.500 $825.000 $818.810
REMOVE SM RD SN SUP&AM
EA 91.000 $75.000 $82.500 $100.000 $83.330
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 91.000 $4.000 $77.000 $60.000 $99.990
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,394.000 $3.000 $1.940 $1.000 $16.670
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 160.000 $1.000 $1.270 $1.150 $1.110
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 80.000 $1.000 $1.380 $1.250 $1.110
RE PROF PM (W)6"(SLD) RAISD PROF ONLY
LF 110,112.000 $1.000 $0.550 $0.500 $0.670
RE PROF PM (Y)6"(SLD) RAISD PROF ONLY
LF 53,846.000 $1.000 $0.500 $0.450 $0.670
RE PROF PM (Y)6"(BRK) RAISD PROF ONLY
LF 210.000 $1.000 $0.610 $0.550 $0.670
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 118.000 $50.000 $21.450 $19.500 $18.830
REFL PAV MRKR TY II-A-A
EA 1,673.000 $5.000 $6.600 $6.000 $6.170
ELIM EXT PAV MRK & MRKS (4")
LF 1,200.000 $1.000 $0.550 $0.500 $1.670
PAV SURF PREP FOR MRK (6")
LF 1,200.000 $1.000 $0.020 $0.020 $0.830
FULL - WIDTH MOWING
AC 18.000 $1,500.000 $244.440 $350.000 $888.800
LITTER REMOVAL
AC 18.000 $150.000 $296.030 $450.000 $388.850
D-GR HMA TY-D SAC-A PG76-22
TON 6,687.000 $130.000 $182.010 $187.410 $252.990
TACK COAT
GAL 8,737.000 $4.000 $5.310 $5.000 $11.110
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 1,960.000 $145.000 $203.750 $208.550 $257.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $4,950.000 $20,000.000 $8,888.000
TMA (STATIONARY)
DAY 70.000 $400.000 $190.930 $150.000 $555.500
TMA (MOBILE OPERATION)
DAY 20.000 $400.000 $222.750 $150.000 $555.500
Totals: $3,080,076.300 $3,448,292.044 $3,629,559.170 $4,598,680.788