NAVARRO BI 45-F (0092-13-024)

Items: 99

County: NAVARRO
Length: N/A
Highway: BI 45-F
District: DALLAS
Control Number: 0092-13-024
DBE Goal: N/A
Project: BR 2019(207)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $8,642,001.71
Date: 11/07/2018 (7 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (15)
E
Engineer's Estimate
$8,642,001.71
$7,969,999.98
Over/Under Est: -7.78% -$672,001.73
$8,221,951.33
Over/Under Est: -4.86% -$420,050.38
Amt Left: 3.16% $251,951.35
Over/Under Est: -4.6% -$397,667.10
Amt Left: 3.44% $274,334.63
Delta: -0.27% -$22,383.28
Over/Under Est: -3.38% -$292,062.32
Amt Left: 4.77% $379,939.41
Delta: -1.28% -$105,604.78
Over/Under Est: -2.47% -$213,077.28
Amt Left: 5.76% $458,924.45
Delta: -0.95% -$78,985.04
Over/Under Est: 0.26% $22,082.39
Amt Left: 8.71% $694,084.12
Delta: -2.79% -$235,159.67
Over/Under Est: 4.35% $376,201.17
Amt Left: 13.15% $1,048,202.90
Delta: -4.09% -$354,118.78
Over/Under Est: 4.9% $423,264.47
Amt Left: 13.74% $1,095,266.20
Delta: -0.52% -$47,063.30
Over/Under Est: 5.19% $448,400.60
Amt Left: 14.06% $1,120,402.33
Delta: -0.28% -$25,136.13
Over/Under Est: 8.17% $705,858.86
Amt Left: 17.29% $1,377,860.59
Delta: -2.83% -$257,458.26
Over/Under Est: 8.86% $765,308.51
Amt Left: 18.03% $1,437,310.24
Delta: -0.64% -$59,449.65
Over/Under Est: 11.48% $992,045.05
Amt Left: 20.88% $1,664,046.78
Delta: -2.41% -$226,736.54
$9,636,800.21
Over/Under Est: 11.51% $994,798.50
Amt Left: 20.91% $1,666,800.23
Delta: -0.03% -$2,753.45
$9,939,125.45
Over/Under Est: 15.01% $1,297,123.74
Amt Left: 24.71% $1,969,125.47
Delta: -3.14% -$302,325.24
$10,440,999.98
Over/Under Est: 20.82% $1,798,998.27
Amt Left: 31% $2,471,000.00
Delta: -5.05% -$501,874.53

Bid Items & Bid Tabulations

99 Total 0 of 99
NAVARRO  |  BI 45-F  |  DALLAS  |  0092-13-024  |  11/07/2018  |  $8,642,001.71  |  BR 2019(207)  |  REPLACE BRIDGE AND APPROACHES  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
PIERCE R & B LLC
A. L. HELMCAMP, INC.
STATELINE CONSTRUCTION, LLC
ED BELL CONSTRUCTION COMPANY
COPPELL CONSTRUCTION CO., INC.
KNIFE RIVER CORPORATION - SOUTH
HIGHWAY 19 CONSTRUCTION LLC
MARIO SINACOLA & SONS EXCAVATING, INC.
STERLING DELAWARE HOLDING COMPANY, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
JAMES CONSTRUCTION GROUP, L.L.C.
HODGES AND SON CONSTRUCTION COMPANY, INC.
OHL USA, INC.
PAUL J. SCARIANO, INC.
BRIDGES AND ROADS, LLC
PREPARING ROW
STA 26.500 $3,500.000 $3,500.000 $7,050.000 $1,801.000 $15,700.000 $2,500.000 $2,000.000 $1,000.000 $19,000.000 $24,783.000 $1,000.000 $21,445.000 $2,400.000 $22,000.000 $3,000.000 $3,382.930
REMOVING CONC (PAV)
SY 17,863.000 $8.000 $7.500 $6.000 $5.270 $4.200 $6.000 $6.500 $15.000 $10.000 $1.000 $7.000 $6.520 $6.000 $6.000 $10.000 $13.580
REMOVING CONC (RIPRAP)
SY 94.000 $25.000 $22.000 $31.000 $22.000 $21.000 $31.000 $20.000 $10.000 $15.000 $17.000 $14.250 $8.730 $10.000 $35.000 $20.000 $12.340
REMOVING CONC (CURB AND GUTTER)
LF 328.000 $9.000 $6.000 $17.000 $6.000 $7.350 $17.000 $7.250 $5.000 $15.000 $5.000 $8.250 $3.750 $10.000 $20.000 $10.000 $6.410
REMOVING CONC (FLUME)
SY 210.000 $15.000 $9.000 $29.000 $18.000 $12.600 $29.000 $20.000 $15.000 $15.000 $21.000 $12.750 $9.760 $12.000 $20.000 $15.000 $11.500
REMOVING STAB BASE & ASPH PAV (0"-10")
SY 9,967.000 $10.000 $4.750 $6.000 $3.450 $4.500 $6.000 $3.000 $5.000 $8.000 $3.500 $5.750 $1.430 $5.000 $5.000 $5.000 $5.480
REMOVING STAB BASE & ASPH PV(10 TO 16")
SY 1,680.000 $10.500 $8.500 $8.000 $5.800 $10.000 $8.000 $4.000 $10.000 $8.000 $6.500 $11.500 $3.940 $8.000 $5.000 $10.000 $12.880
EXCAVATION (ROADWAY)
CY 9,675.000 $12.000 $6.000 $7.000 $8.490 $7.350 $7.000 $14.000 $15.000 $20.000 $11.000 $7.500 $5.000 $10.000 $10.000 $20.000 $10.880
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 56,105.000 $11.000 $10.000 $10.900 $9.220 $9.450 $10.900 $12.500 $10.500 $12.000 $9.000 $7.500 $10.000 $10.000 $18.000 $25.000 $6.850
COMPOST MANUF TOPSOIL (4")
SY 44,373.000 $2.000 $1.670 $1.000 $1.100 $1.100 $1.900 $0.950 $3.000 $1.000 $0.970 $1.650 $1.830 $2.000 $1.340 $1.000 $0.930
BLOCK SODDING
SY 2,713.000 $4.000 $4.150 $4.500 $4.450 $3.250 $4.000 $4.000 $3.800 $4.500 $4.470 $4.900 $3.950 $4.500 $3.950 $6.000 $5.770
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 44,373.000 $0.150 $0.140 $0.120 $0.150 $1.100 $0.140 $0.170 $0.200 $0.140 $0.140 $0.150 $0.130 $0.180 $0.130 $0.200 $0.190
DRILL SEED (TEMP)(WARM OR COOL)
SY 44,373.000 $0.130 $0.100 $0.120 $0.130 $0.560 $0.090 $0.150 $0.160 $0.120 $0.120 $0.130 $0.080 $0.160 $0.080 $0.100 $0.120
VEGETATIVE WATERING
MG 7,280.000 $15.000 $5.000 $3.000 $4.000 $3.500 $41.000 $0.100 $10.000 $4.000 $24.000 $26.000 $23.100 $30.000 $1.000 $22.000 $15.650
FL BS (CMP IN PLC)(TY D GR 1-2)(16")
SY 21,756.000 $22.000 $20.000 $22.000 $21.100 $23.500 $22.000 $21.000 $30.000 $21.000 $20.000 $18.750 $31.410 $42.000 $30.000 $27.500 $38.570
LIME (HYDRATED LIME (SLURRY))
TON 561.000 $150.000 $205.000 $200.000 $190.000 $175.000 $200.000 $172.000 $200.000 $195.000 $227.000 $245.000 $218.890 $200.000 $194.160 $175.000 $270.100
LIME TRT (SUBGRADE)(12")
SY 22,762.000 $10.000 $5.500 $4.650 $3.620 $4.000 $4.650 $3.000 $5.000 $5.500 $3.000 $3.500 $3.020 $4.000 $4.100 $8.000 $6.130
PRIME COAT (MC-30)
GAL 4,352.000 $5.000 $4.700 $6.000 $5.000 $4.790 $6.000 $4.250 $5.000 $4.500 $4.500 $5.250 $3.880 $5.000 $3.600 $5.000 $6.570
ASPH (CRS-2P)
GAL 5,440.000 $4.000 $3.900 $4.000 $5.650 $3.990 $4.000 $3.600 $5.000 $3.750 $3.750 $4.500 $3.340 $4.000 $3.100 $6.000 $5.480
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 4,569.000 $4.000 $4.200 $4.000 $5.650 $4.260 $4.000 $3.750 $6.000 $4.000 $4.000 $5.000 $3.780 $4.000 $3.500 $6.000 $5.840
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 207.000 $150.000 $185.000 $176.000 $168.000 $186.380 $176.000 $180.000 $180.000 $175.000 $175.000 $195.000 $129.450 $195.000 $120.000 $170.000 $255.500
SUPERPAVE MIXTURES SP-B PG64-22
TON 3,399.000 $70.000 $94.000 $89.000 $105.620 $85.200 $89.000 $71.000 $110.000 $80.000 $80.000 $103.000 $113.270 $90.000 $105.000 $80.000 $116.800
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
TON 2,267.000 $85.000 $99.000 $94.000 $108.250 $90.530 $94.000 $80.000 $115.000 $85.000 $85.000 $109.000 $124.060 $90.000 $115.000 $85.000 $124.100
CEM STABIL BKFL
CY 460.000 $120.000 $186.000 $150.000 $256.000 $168.000 $210.000 $172.000 $180.000 $160.000 $158.000 $195.000 $159.660 $180.000 $137.050 $90.000 $131.880
DRILL SHAFT (36 IN)
LF 2,464.000 $140.000 $150.000 $140.000 $137.210 $168.000 $155.000 $160.000 $130.000 $150.000 $156.000 $140.000 $133.490 $120.000 $139.940 $175.000 $238.370
CL C CONC (ABUT)(HPC)
CY 192.500 $1,000.000 $850.000 $850.000 $846.000 $1,000.000 $896.000 $765.000 $900.000 $1,175.000 $1,100.000 $725.000 $1,000.000 $900.000 $900.000 $1,000.000 $1,609.340
CL C CONC (CAP)(HPC)
CY 178.000 $1,000.000 $850.000 $850.000 $902.000 $1,000.000 $836.000 $900.000 $1,200.000 $1,350.000 $1,030.000 $765.000 $988.000 $1,000.000 $1,000.000 $1,300.000 $2,634.070
CL C CONC (COLUMN)(HPC)
CY 80.700 $1,000.000 $850.000 $850.000 $944.000 $1,000.000 $1,025.000 $1,100.000 $611.000 $1,160.000 $1,125.000 $800.000 $1,200.000 $1,000.000 $1,000.000 $3,400.000 $1,700.130
REINF CONC SLAB (HPC)
SF 39,200.000 $19.000 $16.000 $14.000 $17.650 $17.000 $16.500 $19.000 $17.000 $21.000 $21.000 $17.250 $20.000 $18.000 $16.500 $20.000 $31.000
APPROACH SLAB (HPC)
CY 244.000 $475.000 $495.000 $400.000 $604.000 $585.000 $500.000 $475.000 $500.000 $540.000 $420.000 $475.000 $513.150 $500.000 $600.000 $600.000 $874.980
PRESTR CONC GIRDER (TX28)
LF 4,865.010 $145.000 $128.500 $120.000 $171.360 $178.500 $134.500 $136.000 $142.000 $125.000 $148.000 $127.000 $148.200 $140.000 $190.000 $125.000 $184.280
RIPRAP (CONC)(4 IN)
CY 80.000 $450.000 $400.000 $500.000 $412.000 $420.000 $495.000 $465.000 $400.000 $500.000 $431.000 $480.000 $445.060 $450.000 $550.000 $600.000 $499.940
RIPRAP (STONE PROTECTION)(12 IN)
CY 2,611.000 $115.000 $100.000 $120.000 $112.000 $150.000 $115.000 $76.000 $120.000 $130.000 $127.000 $160.000 $114.810 $100.000 $150.000 $100.000 $148.890
RIPRAP (MOW STRIP)(4 IN)
CY 150.600 $475.000 $400.000 $500.000 $421.000 $450.000 $615.000 $450.000 $400.000 $550.000 $440.000 $515.000 $684.050 $500.000 $600.000 $600.000 $575.990
RAIL (TY T223)(HPC)
LF 2,152.000 $103.000 $100.000 $80.000 $105.000 $150.000 $118.000 $125.000 $76.000 $145.000 $96.000 $74.000 $102.840 $100.000 $110.000 $125.000 $149.920
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 389.000 $85.000 $80.000 $70.000 $83.000 $52.500 $80.000 $80.000 $100.000 $100.000 $62.000 $65.000 $84.820 $100.000 $90.000 $100.000 $138.350
RC PIPE (CL IV)(24 IN)
LF 408.000 $80.000 $68.000 $85.000 $72.000 $73.500 $80.000 $80.000 $100.000 $105.000 $76.000 $87.500 $82.960 $60.000 $110.000 $100.000 $104.450
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 4.000 $1,000.000 $1,350.000 $1,000.000 $655.000 $945.000 $1,100.000 $900.000 $1,000.000 $3,500.000 $1,200.000 $785.000 $855.190 $1,000.000 $1,000.000 $1,700.000 $1,460.260
REMOV STR (SET)
EA 4.000 $575.000 $185.000 $750.000 $250.000 $315.000 $575.000 $350.000 $500.000 $500.000 $587.000 $350.000 $760.050 $250.000 $450.000 $750.000 $514.230
REMOV STR (PIPE)
LF 115.000 $25.000 $10.000 $35.000 $8.000 $13.650 $30.000 $15.000 $50.000 $35.000 $22.000 $22.000 $17.290 $20.000 $30.000 $25.000 $20.980
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $35,000.000 $30,000.000 $30,000.000 $33,854.000 $14,700.000 $21,000.000 $40,000.000 $20,000.000 $30,000.000 $100,000.000 $26,500.000 $35,000.000 $40,000.000 $19,681.340 $110,000.000 $36,043.750
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 3.000 $50,000.000 $40,000.000 $35,000.000 $53,261.000 $25,200.000 $28,000.000 $50,000.000 $30,000.000 $40,000.000 $125,000.000 $36,750.000 $45,000.000 $65,000.000 $19,681.340 $135,000.000 $36,043.750
MOBILIZATION
LS 1.000 $699,181.970 $747,000.000 $740,000.000 $750,000.000 $791,000.000 $693,000.000 $800,000.000 $950,000.000 $900,000.000 $850,000.000 $880,000.000 $900,000.000 $890,000.000 $831,000.000 $850,000.000 $554,419.280
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 27.000 $14,000.000 $4,000.000 $10,000.000 $1,385.000 $5,250.000 $1,500.000 $2,000.000 $1,500.000 $3,400.000 $1,000.000 $1,800.000 $15,000.000 $2,400.000 $8,000.000 $2,300.000 $5,902.300
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 140.000 $26.000 $20.990 $40.000 $24.000 $23.000 $20.000 $22.500 $19.000 $30.000 $21.000 $39.000 $28.890 $25.000 $0.190 $45.000 $27.740
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 340.000 $30.000 $24.000 $50.000 $27.000 $27.000 $24.000 $26.500 $23.000 $30.000 $24.500 $44.000 $31.800 $26.000 $22.500 $50.000 $32.850
ROCK FILTER DAMS (REMOVE)
LF 480.000 $8.000 $10.500 $5.000 $9.000 $8.500 $8.000 $8.000 $10.000 $2.000 $8.000 $12.000 $8.910 $12.000 $10.000 $14.000 $11.680
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,251.000 $20.000 $19.000 $20.000 $16.550 $24.000 $19.000 $15.000 $18.000 $30.000 $21.250 $34.300 $20.490 $24.000 $18.000 $40.000 $21.900
CONSTRUCTION EXITS (REMOVE)
SY 1,251.000 $9.000 $9.500 $3.000 $9.500 $9.000 $8.500 $5.000 $10.000 $2.000 $8.000 $10.200 $11.190 $12.000 $10.000 $12.000 $13.140
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,066.000 $2.500 $1.900 $3.500 $2.720 $2.000 $1.750 $4.000 $2.000 $1.650 $1.650 $2.200 $2.410 $2.000 $3.000 $2.000 $2.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,066.000 $0.750 $0.530 $0.700 $0.750 $0.550 $0.500 $0.500 $0.500 $0.250 $0.500 $0.550 $0.580 $1.000 $1.500 $0.600 $0.730
CONSTRUCTING DETOURS
SY 3,293.000 $100.000 $157.000 $185.000 $128.440 $100.000 $182.000 $245.000 $144.000 $90.000 $161.000 $395.000 $113.200 $260.000 $150.000 $2.500 $118.990
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 6,009.000 $40.000 $43.000 $45.000 $55.000 $21.000 $37.000 $75.000 $75.000 $60.000 $43.000 $85.000 $39.390 $70.000 $35.000 $90.000 $13.070
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 6,438.000 $10.000 $6.000 $10.000 $22.000 $8.400 $12.000 $10.000 $15.000 $10.000 $5.000 $8.000 $4.080 $16.000 $20.000 $5.000 $13.070
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 6,318.000 $10.000 $7.000 $12.000 $17.000 $6.300 $6.000 $8.500 $25.000 $5.000 $6.000 $7.250 $10.400 $16.000 $3.890 $6.000 $13.070
RUMBLE STRIPS (SHOULDER) CONCRETE
LF 7,932.000 $0.750 $1.500 $1.800 $1.960 $0.110 $1.750 $1.600 $2.000 $1.000 $1.350 $2.450 $1.450 $1.650 $0.970 $2.000 $2.120
MTL W-BEAM GD FEN (TIM POST)
LF 2,275.000 $18.000 $19.350 $20.000 $20.000 $19.820 $18.610 $22.300 $22.000 $18.750 $19.000 $24.200 $19.000 $20.000 $15.830 $25.000 $27.740
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $1,450.000 $1,350.000 $1,500.000 $1,660.000 $1,636.030 $1,300.000 $2,175.000 $1,385.000 $1,550.000 $1,410.000 $1,524.000 $1,410.000 $1,700.000 $1,389.020 $2,000.000 $2,058.600
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,000.000 $995.000 $1,000.000 $1,025.000 $1,011.750 $950.000 $900.000 $1,200.000 $850.000 $950.000 $1,293.000 $950.000 $940.000 $900.200 $1,000.000 $1,387.000
MTL BM GD FEN TRANS (NON - SYM)
EA 4.000 $455.000 $535.000 $600.000 $724.000 $532.500 $500.000 $900.000 $750.000 $850.000 $500.000 $770.000 $500.000 $940.000 $823.760 $1,000.000 $730.000
REMOVE METAL BEAM GUARD FENCE
LF 829.000 $3.500 $2.000 $2.000 $1.500 $1.860 $1.750 $3.200 $2.000 $3.000 $2.000 $2.200 $2.000 $3.500 $1.760 $4.000 $2.920
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,275.000 $2,650.000 $2,700.000 $2,850.000 $2,715.750 $2,550.000 $2,530.000 $2,600.000 $2,375.000 $2,400.000 $2,783.000 $2,400.000 $2,500.000 $2,242.950 $3,000.000 $3,504.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $260.000 $265.000 $300.000 $250.000 $266.250 $250.000 $240.000 $200.000 $225.000 $200.000 $220.000 $200.000 $250.000 $502.900 $300.000 $292.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $2,150.000 $1,335.000 $1,500.000 $1,125.000 $1,575.000 $1,200.000 $2,250.000 $2,000.000 $2,000.000 $1,025.000 $2,750.000 $1,375.000 $3,000.000 $2,000.000 $1,500.000 $1,496.500
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $975.000 $689.000 $1,000.000 $802.000 $1,050.000 $1,000.000 $850.000 $1,500.000 $1,000.000 $725.000 $1,100.000 $695.000 $1,200.000 $800.000 $800.000 $1,058.500
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $8,500.000 $7,800.000 $11,000.000 $4,925.000 $11,550.000 $6,500.000 $8,750.000 $9,500.000 $10,000.000 $7,249.000 $10,000.000 $7,875.000 $10,000.000 $7,500.000 $9,000.000 $10,583.540
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $510.000 $516.000 $500.000 $507.000 $522.920 $475.000 $480.000 $800.000 $450.000 $491.000 $850.000 $450.000 $500.000 $491.000 $650.000 $716.860
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 4.000 $570.000 $842.500 $600.000 $860.000 $846.680 $580.000 $585.000 $960.000 $550.000 $795.000 $1,050.000 $550.000 $600.000 $795.000 $750.000 $1,160.700
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 10.000 $600.000 $669.990 $600.000 $722.000 $676.280 $580.000 $585.000 $900.000 $550.000 $635.000 $965.000 $550.000 $600.000 $635.000 $750.000 $927.100
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $770.000 $700.000 $820.000 $1,065.000 $1,011.750 $820.000 $825.000 $1,190.000 $775.000 $950.000 $1,300.000 $775.000 $900.000 $950.000 $1,000.000 $1,387.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
EA 14.000 $25.000 $20.000 $11.000 $17.000 $24.500 $23.000 $11.000 $20.000 $10.000 $15.000 $11.000 $20.000 $12.000 $15.000 $20.000 $29.200
INSTL DEL ASSM (D-SY)SZ 2(WC)GND
EA 12.000 $70.000 $52.000 $60.000 $49.000 $48.990 $46.000 $59.000 $40.000 $55.000 $45.000 $60.500 $45.000 $60.000 $45.000 $80.000 $54.750
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
EA 13.000 $20.000 $20.500 $11.000 $17.000 $24.500 $23.000 $11.000 $25.000 $10.000 $15.000 $11.000 $20.000 $12.000 $15.000 $20.000 $29.200
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 2.000 $65.000 $78.000 $60.000 $49.000 $51.120 $48.000 $59.000 $45.000 $55.000 $45.000 $60.500 $55.000 $60.000 $45.000 $80.000 $58.400
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 10.000 $25.000 $21.000 $27.000 $17.000 $25.290 $23.750 $27.000 $15.000 $25.000 $15.000 $27.500 $20.000 $30.000 $15.000 $35.000 $21.900
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
EA 12.000 $25.000 $19.990 $27.000 $17.000 $25.290 $23.750 $27.000 $15.000 $25.000 $15.000 $27.500 $20.000 $30.000 $15.000 $35.000 $21.900
INSTL DEL ASSM (D-SY)SZ 2(WC)GND(BI)
EA 6.000 $20.000 $56.990 $60.000 $51.000 $52.190 $49.000 $59.000 $35.000 $55.000 $46.000 $60.500 $49.000 $60.000 $46.000 $75.000 $51.100
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 6,056.000 $0.300 $1.050 $0.470 $1.100 $1.070 $1.000 $0.480 $0.450 $1.000 $0.450 $1.100 $0.450 $1.100 $1.000 $0.250 $0.660
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 8,295.000 $0.300 $1.050 $0.470 $1.100 $1.070 $1.000 $0.480 $0.450 $1.000 $0.450 $1.100 $0.450 $1.100 $1.000 $0.250 $0.660
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 7,623.000 $0.850 $1.050 $1.300 $1.100 $1.070 $1.000 $1.330 $1.250 $1.000 $1.250 $1.100 $1.250 $1.100 $1.000 $0.250 $1.830
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 7,416.000 $0.850 $1.050 $1.300 $1.100 $1.070 $1.000 $1.330 $1.250 $1.000 $1.250 $1.100 $1.250 $1.100 $1.000 $0.250 $1.830
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 66.000 $6.000 $6.170 $13.000 $6.600 $6.390 $6.000 $12.770 $12.000 $6.000 $12.000 $6.600 $12.000 $6.500 $6.000 $0.200 $17.520
PAVEMENT SEALER 4"
LF 27,944.000 $0.150 $0.130 $0.260 $0.130 $0.130 $0.120 $0.270 $0.250 $0.120 $0.250 $0.140 $0.250 $0.140 $0.120 $0.250 $0.370
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,810.000 $0.550 $1.060 $0.700 $1.100 $1.070 $1.000 $0.690 $0.650 $1.000 $0.650 $1.100 $0.650 $1.100 $1.000 $0.250 $0.950
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 13,739.000 $0.550 $1.040 $0.600 $1.100 $1.070 $1.000 $0.590 $0.550 $1.000 $0.550 $1.100 $0.550 $1.100 $1.000 $0.250 $0.800
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 13,529.000 $0.550 $1.040 $0.600 $1.100 $1.070 $1.000 $0.590 $0.550 $1.000 $0.550 $1.100 $0.550 $1.100 $1.000 $0.250 $0.800
RE PM W/RET REQ TY II (W) 4" (BRK)
LF 240.000 $1.000 $0.780 $0.500 $0.550 $0.530 $0.500 $0.370 $0.350 $0.500 $0.350 $0.550 $0.350 $0.600 $0.500 $0.250 $0.510
RE PM W/RET REQ TY II (W) 4" (SLD)
LF 980.000 $1.000 $0.580 $0.400 $0.550 $0.530 $0.500 $0.340 $0.320 $0.500 $0.320 $0.550 $0.320 $0.600 $0.500 $0.250 $0.470
RE PM W/RET REQ TY II (Y) 4" (SLD)
LF 980.000 $1.000 $0.580 $0.400 $0.550 $0.530 $0.500 $0.340 $0.320 $0.500 $0.320 $0.550 $0.320 $0.600 $0.500 $0.250 $0.470
REFL PAV MRKR TY II-A-A
EA 34.000 $4.000 $7.000 $7.000 $5.500 $5.330 $5.000 $4.790 $4.500 $5.000 $4.500 $5.500 $4.500 $5.500 $5.000 $0.250 $6.570
REFL PAV MRKR TY II-C-R
EA 141.000 $5.000 $5.650 $7.000 $5.500 $5.330 $5.000 $4.790 $4.500 $5.000 $4.500 $0.550 $4.500 $5.500 $5.000 $0.250 $6.570
ELIM EXT PAV MRK & MRKS (4")
LF 10,135.000 $0.500 $0.530 $1.000 $0.550 $0.530 $0.500 $1.060 $1.000 $0.500 $1.000 $0.550 $1.000 $0.600 $0.500 $0.250 $1.460
PAV SURF PREP FOR MRK (4")
LF 30,144.000 $0.100 $0.090 $0.400 $0.090 $0.090 $0.080 $0.390 $0.370 $0.080 $0.370 $0.100 $0.370 $0.120 $0.080 $0.250 $0.540
FULL - WIDTH MOWING
AC 29.700 $100.000 $500.000 $140.000 $200.000 $175.000 $85.000 $125.000 $700.000 $150.000 $370.000 $200.000 $150.340 $650.000 $250.000 $150.000 $213.230
LITTER REMOVAL
AC 29.700 $200.000 $500.000 $80.000 $200.000 $175.000 $50.000 $100.000 $500.000 $500.000 $500.000 $65.000 $117.060 $450.000 $643.660 $75.000 $303.880
NO. OF WORKING DAYS
$/D 1,000.000 $573.000 $490.000 $470.000 $421.000 $299.000 $550.000 $573.000 $344.000 $360.000 $430.000 $573.000 $404.000 $570.000 $362.000 $400.000 $573.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $6,745.000 $20,000.000 $5,000.000 $10,500.000 $8,500.000 $10,500.000 $10,000.000 $9,000.000 $11,000.000 $20,000.000 $2,514.020 $10,000.000 $16,237.500 $11,000.000 $12,112.610
TMA (STATIONARY)
EA 3.000 $12,000.000 $17,500.000 $10,000.000 $10,000.000 $2,500.000 $21,000.000 $5,000.000 $20,000.000 $5,000.000 $12,000.000 $20,000.000 $20,000.000 $14,000.000 $5,400.000 $6,000.000 $12,871.370
TMA (MOBILE OPERATION)
HR 60.000 $60.000 $25.000 $60.000 $45.000 $55.000 $25.000 $50.000 $50.000 $65.000 $140.000 $30.000 $60.000 $50.000 $75.000 $50.000 $80.230
Totals: $8,642,001.710 $7,969,999.985 $8,221,951.330 $8,244,334.614 $8,349,939.395 $8,428,924.435 $8,664,084.100 $9,018,202.880 $9,065,266.180 $9,090,402.310 $9,347,860.570 $9,407,310.232 $9,634,046.760 $9,636,800.212 $9,939,125.450 $10,441,000.000