NACOGDOCHES SH 7 (0553-03-034)

Items: 108

County: NACOGDOCHES
Length: 0.0100 MILES
Highway: SH 7
District: LUFKIN
Control Number: 0553-03-034
DBE Goal: 3.0%
Project: BR 2025(726)
Guaranty: $100,000.00
Time: 456 WORKING DAYS
Engineer's Estimate: $7,373,105.30
Date: 05/01/2025 (1 year ago)
Contract Number: 5253021
Type: BRIDGE REPLACEMENT
Project ID: A00061563
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
RANDAL COOPER
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$7,373,105.30
$6,230,927.11
Over/Under Est: -15.49% -$1,142,178.19
Over/Under Est: -9.7% -$715,291.45
Amt Left: 6.85% $426,886.74
$6,780,150.30
Over/Under Est: -8.04% -$592,955.00
Amt Left: 8.81% $549,223.19
Delta: -1.84% -$122,336.45
Over/Under Est: -3.51% -$258,977.30
Amt Left: 14.17% $883,200.89
Delta: -4.93% -$333,977.70
Over/Under Est: -0.01% -$788.86
Amt Left: 18.32% $1,141,389.33
Delta: -3.63% -$258,188.44
$8,195,695.39
Over/Under Est: 11.16% $822,590.09
Amt Left: 31.53% $1,964,768.28
Delta: -11.17% -$823,378.95
Over/Under Est: 17.87% $1,317,562.10
Amt Left: 39.48% $2,459,740.29
Delta: -6.04% -$494,972.01
$9,773,671.52
Over/Under Est: 32.56% $2,400,566.22
Amt Left: 56.86% $3,542,744.41
Delta: -12.46% -$1,083,004.12
Subcontractor Percentage Amount
TRUE ROADS CONSTRUCTION LLC 12.84% $800,051.04
R & G CONSTRUCTION, LLC 10.99% $684,778.89
HODGES AND SON CONSTRUCTION COMPANY, INC. 4.35% $271,045.33
MORRIS COUNTY CONTRACTORS, L.L.C. 1.39% $86,609.89
ISAACS CONSTRUCTION SERVICES LLC 1.26% $78,509.68
CAP RIVER LLC 1.18% $73,524.94
STRIPING TECHNOLOGY, L.P. 0.98% $61,063.09
THIRD COAST SERVICES LLC 0.69% $42,993.40
KITECO PROPERTY SOLUTIONS INC. 0.59% $36,762.47
DIAMOND ELITE BARRICADES, LLC 0.30% $18,692.78
SOUTHWEST ENVIRONMENT SERVICES LLC 0.11% $6,854.02
TORO BRAVO CONSTRUCTION, LLC 0.03% $1,869.28
Total: 34.71% $2,162,754.81

Bid Items & Bid Tabulations

108 Total 0 of 108
NACOGDOCHES  |  SH 7  |  LUFKIN  |  0553-03-034  |  05/01/2025  |  $7,373,105.30  |  BR 2025(726)  |  BRIDGE REPL  |  456 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THK CONSTRUCTION LLC
LONGVIEW BRIDGE AND ROAD, LTD.
A. L. HELMCAMP, INC.
HIGHWAY 19 CONSTRUCTION LLC
TRUE ROADS CONSTRUCTION, LLC
ALTUS CONSTRUCTION LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
BRICE HIGHWAY LLC
PREPARING ROW
STA 36.000 $2,000.000 $3,000.000 $3,500.000 $7,500.000 $5,000.000 $2,800.000 $22,566.080 $5,000.000 $11,100.000
REMOV CONC (RIPRAP)
SY 284.000 $40.000 $20.000 $20.000 $35.000 $25.000 $14.000 $34.670 $20.000 $29.940
RMV (15") TRT/UNTRT BASE & ASPH PAV
SY 2,789.000 $25.000 $10.640 $15.000 $7.500 $15.000 $13.500 $22.100 $20.000 $13.380
RMV (8"-19") TRT/UNTRT BASE & ASPH PAV
SY 71.000 $20.000 $2.750 $22.000 $15.000 $15.000 $24.000 $20.800 $15.000 $35.040
REMOVE STAB BASE AND ASPH PAV (6"-20")
SY 1,654.000 $10.000 $12.860 $12.500 $7.000 $15.000 $16.000 $23.790 $18.000 $19.030
EXCAV (ROADWAY)
CY 2,370.000 $20.000 $10.000 $18.500 $12.000 $10.000 $17.000 $20.340 $20.000 $23.430
EMBANK (FNL)(DC)(TY C)
CY 4,252.000 $25.000 $10.000 $26.500 $18.000 $30.000 $36.000 $16.540 $30.000 $29.110
BLADING
STA 29.000 $350.000 $500.000 $250.000 $188.000 $350.000 $220.000 $303.390 $1.000 $167.240
FURN & PLACE TOPSOIL (4")
SY 60,400.000 $2.500 $3.000 $3.100 $1.000 $2.760 $3.000 $5.820 $2.000 $2.190
BLOCK SODDING
SY 88.000 $10.000 $13.910 $14.000 $10.000 $5.000 $8.800 $7.020 $20.000 $20.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 60,400.000 $1.750 $0.670 $0.650 $0.540 $0.250 $0.550 $0.980 $1.000 $0.750
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 30,200.000 $1.250 $0.630 $0.600 $0.540 $0.250 $0.550 $0.300 $1.000 $0.750
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 30,200.000 $1.250 $0.630 $0.650 $0.540 $0.250 $0.550 $0.300 $1.000 $0.750
VEGETATIVE WATERING
TGL 3,624.800 $20.000 $5.000 $16.000 $3.500 $10.000 $20.000 $31.710 $1.000 $50.140
SPRINKLING (DUST CONTROL)
TGL 60.000 $10.000 $100.000 $25.000 $3.500 $100.000 $20.000 $0.870 $1.000 $104.430
FL BS (CMP IN PLC)(TY D GR 1-2) (12")
SY 2,073.000 $40.000 $76.000 $57.000 $44.000 $35.000 $58.500 $32.220 $50.000 $71.160
FL BS (CMP IN PLC)(RAP) (6")
SY 1,654.000 $40.000 $25.000 $30.000 $24.000 $25.000 $15.000 $28.190 $45.000 $12.860
CEMENT
TON 126.000 $260.000 $300.000 $300.000 $250.000 $350.000 $290.000 $238.380 $300.000 $391.510
CEMENT TRT (NEW BASE)(12")
SY 3,727.000 $10.000 $5.000 $4.000 $5.000 $4.000 $6.000 $2.170 $12.000 $6.210
CEMENT TRT (SUBGRADE)(12")
SY 3,848.000 $6.000 $5.000 $4.000 $7.000 $5.000 $5.750 $4.980 $12.000 $6.010
ASPH (RC-250)
TON 36.000 $1,500.000 $963.000 $1,225.000 $1,200.000 $100.000 $1.000 $2,083.710 $1,800.000 $1,000.000
ASPH (AC-15P OR CRS-2P)
GAL 21.300 $1,250.000 $3.750 $26.000 $10.000 $100.000 $1.000 $5.420 $2,000.000 $1,000.000
AGGR (TY E OR L, GR-5)
CY 25.000 $360.000 $1,177.000 $330.000 $750.000 $200.000 $1,000.000 $111.360 $1,000.000 $1,000.000
AGGR (TY E OR L, PE OR PL GR 4) (SAC-A)
CY 99.000 $360.000 $856.000 $220.000 $350.000 $200.000 $700.000 $146.490 $950.000 $900.000
SP MIXES SP-C PG70-22
TON 1,442.000 $180.000 $269.790 $172.000 $190.000 $350.000 $220.000 $261.660 $210.000 $209.000
SP MIXES SP-C SAC-A PG70-22
TON 357.000 $180.000 $309.260 $167.000 $220.000 $350.000 $230.000 $265.010 $270.000 $260.000
SP MIXES SP-D PG64-22 (LEVEL-UP)
TON 30.000 $180.000 $465.450 $260.000 $350.000 $350.000 $400.000 $261.900 $606.000 $607.000
SP MIXES SP-D PG64-22 (EXEMPT)
TON 89.000 $180.000 $310.300 $320.000 $750.000 $350.000 $285.000 $457.690 $340.000 $335.000
PLANE ASPH CONC PAV(0" TO 4")
SY 9,417.000 $8.000 $3.660 $4.000 $3.100 $17.000 $4.000 $4.180 $10.000 $8.960
CUT & RESTORING PAV
SY 24.000 $200.000 $150.000 $205.000 $220.000 $250.000 $175.000 $216.710 $300.000 $187.210
CEM STABIL BKFL
CY 384.000 $325.000 $260.000 $230.000 $190.000 $300.000 $290.000 $261.500 $290.000 $378.560
DRILL SHAFT (18 IN)
LF 140.000 $175.000 $274.380 $185.000 $280.000 $150.000 $148.000 $207.650 $175.000 $124.540
DRILL SHAFT (24 IN)
LF 420.000 $300.000 $304.450 $243.000 $270.000 $300.000 $235.000 $167.190 $240.000 $232.540
DRILL SHAFT (36 IN)
LF 630.000 $380.000 $395.570 $353.000 $290.000 $600.000 $320.000 $230.360 $350.000 $342.260
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 8.000 $300.000 $778.010 $450.000 $460.000 $450.000 $445.000 $840.360 $500.000 $727.110
CL C CONC (ABUT)
CY 88.400 $1,300.000 $1,100.000 $1,100.000 $2,100.000 $1,163.000 $1,175.000 $1,261.510 $2,000.000 $2,041.820
CL C CONC (CAP)
CY 65.400 $1,500.000 $1,500.000 $1,300.000 $1,600.000 $1,500.000 $1,400.000 $1,805.770 $2,200.000 $2,122.040
CL C CONC (COLUMN)
CY 15.000 $2,000.000 $2,500.000 $2,050.000 $2,100.000 $1,200.000 $2,800.000 $3,454.250 $2,200.000 $2,763.630
REINF CONC SLAB
SF 12,420.000 $23.000 $17.780 $25.000 $34.000 $27.000 $31.000 $36.420 $30.000 $40.700
REINF CONC SLAB (SLAB BEAM)
SF 3,900.000 $28.000 $21.000 $17.000 $31.000 $19.000 $26.000 $75.380 $30.000 $32.790
APPROACH SLAB
CY 154.000 $830.000 $700.000 $800.000 $800.000 $750.000 $665.000 $663.480 $1,000.000 $1,014.500
PRESTR CONC GIRDER (TX34)
LF 1,013.540 $200.000 $237.000 $200.000 $235.000 $320.000 $245.000 $272.970 $290.000 $308.020
PRESTR CONC GIRDER (TX40)
LF 696.500 $225.000 $237.000 $200.000 $235.000 $320.000 $265.000 $215.100 $290.000 $305.240
PRESTR CONC SLAB BEAM (5SB15)
LF 742.500 $340.000 $305.000 $260.000 $275.000 $259.000 $310.000 $321.070 $300.000 $394.180
RIPRAP (CONC)(4 IN)
CY 0.350 $700.000 $2,000.000 $4,500.000 $1,800.000 $1,500.000 $4,000.000 $650.120 $1,500.000 $5,228.660
RIPRAP (STONE PROTECTION)(18 IN)
CY 181.000 $235.000 $130.000 $185.000 $146.000 $180.000 $185.000 $177.700 $180.000 $301.350
RIPRAP (STONE PROTECTION)(24 IN)
CY 4,265.000 $320.000 $130.000 $195.000 $146.000 $180.000 $180.000 $140.810 $175.000 $293.960
RAIL (TY T223)
LF 324.000 $160.000 $165.000 $100.000 $220.000 $150.000 $120.000 $309.470 $180.000 $220.760
RAIL (TY SSTR)
LF 604.000 $130.000 $155.000 $80.000 $145.000 $180.000 $100.000 $175.410 $120.000 $190.350
ARMOR JOINT (SEALED)
LF 44.000 $250.000 $150.000 $210.000 $200.000 $180.000 $140.000 $173.370 $200.000 $273.540
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 103.000 $250.000 $150.000 $300.000 $250.000 $180.000 $260.000 $326.860 $250.000 $427.050
RC PIPE (CL III)(18 IN)
LF 144.000 $90.000 $60.000 $75.000 $75.000 $65.000 $125.000 $90.150 $60.000 $185.390
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $1,500.000 $1,000.000 $1,400.000 $1,300.000 $1,000.000 $1,300.000 $1,601.900 $2,200.000 $3,199.910
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $42,000.000 $30,000.000 $21,000.000 $40,000.000 $20,000.000 $30,000.000 $40,452.050 $30,000.000 $16,645.450
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $75,000.000 $50,000.000 $32,000.000 $93,000.000 $160,000.000 $90,000.000 $98,240.700 $150,000.000 $57,608.730
REMOV STR (PIPE)
EA 4.000 $1,000.000 $500.000 $1,000.000 $1,600.000 $500.000 $1,800.000 $1,083.540 $500.000 $1,498.790
MOBILIZATION
LS 1.000 $700,000.000 $400,000.000 $400,000.000 $655,000.000 $750,000.000 $650,000.000 $816,418.800 $750,000.000 $907,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 25.000 $3,500.000 $792.450 $5,000.000 $15,000.000 $2,500.000 $7,500.000 $4,334.150 $12,000.000 $5,596.270
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $20,000.000 $25,000.000 $17,000.000 $12,000.000 $15,000.000 $17,500.000 $20,226.030 $30,000.000 $17,493.320
TMA (STATIONARY)
DAY 100.000 $325.000 $250.000 $330.000 $200.000 $250.000 $200.000 $192.670 $300.000 $331.790
TMA (MOBILE OPERATION)
DAY 10.000 $350.000 $300.000 $550.000 $300.000 $1,000.000 $200.000 $216.710 $300.000 $835.160
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 898.000 $55.000 $36.380 $40.000 $37.000 $65.000 $40.000 $47.470 $1.000 $65.000
ROCK FILTER DAMS (REMOVE)
LF 898.000 $15.000 $13.910 $9.000 $8.000 $10.000 $8.800 $14.760 $1.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 669.000 $40.000 $10.000 $50.000 $25.000 $25.000 $32.000 $39.870 $1.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 669.000 $15.000 $1.000 $11.000 $5.000 $10.000 $11.000 $10.970 $1.000 $10.000
CONSTRUCTION PERIMETER FENCE
LF 460.000 $15.000 $10.000 $8.000 $7.000 $3.000 $6.600 $4.940 $1.000 $8.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,147.000 $5.000 $4.070 $4.250 $3.900 $4.000 $4.000 $3.960 $1.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,147.000 $1.000 $0.860 $1.000 $1.000 $1.000 $1.100 $1.200 $1.000 $1.000
CONSTRUCTING DETOURS
SY 4,337.000 $110.000 $151.720 $160.000 $150.000 $120.000 $200.000 $125.780 $235.000 $208.980
DRIVEWAYS (ACP)
SY 389.000 $75.000 $73.830 $365.000 $62.000 $75.000 $68.000 $79.020 $90.000 $154.190
MTL W-BEAM GD FEN (TIM POST)
LF 1,012.500 $35.000 $33.160 $30.000 $26.000 $25.000 $33.000 $32.360 $30.000 $27.600
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,500.000 $1,845.750 $2,100.000 $1,800.000 $2,850.000 $1,900.000 $2,195.970 $1,800.000 $1,990.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,300.000 $1,524.750 $1,800.000 $1,700.000 $2,500.000 $1,500.000 $2,080.390 $1,600.000 $1,675.000
REMOVE METAL BEAM GUARD FENCE
LF 1,550.000 $8.000 $3.210 $2.250 $2.200 $3.000 $3.300 $6.360 $3.000 $3.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $1,200.000 $160.500 $225.000 $220.000 $2,500.000 $165.000 $248.490 $200.000 $275.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,500.000 $3,236.750 $3,500.000 $3,300.000 $3,050.000 $3,325.000 $3,814.050 $3,150.000 $3,090.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $725.000 $214.000 $225.000 $220.000 $250.000 $220.000 $288.940 $500.000 $325.000
WIRE FENCE (TY D)
LF 5,758.000 $30.000 $15.000 $35.000 $11.000 $15.000 $16.500 $16.970 $20.000 $24.500
MAILBOX INSTALL-S (WC-POST) TY 3
EA 3.000 $400.000 $323.140 $350.000 $340.000 $450.000 $900.000 $317.840 $1,000.000 $325.000
RELOCATE EXISTING MAILBOX
EA 1.000 $400.000 $216.140 $225.000 $290.000 $350.000 $550.000 $9,193.490 $500.000 $275.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 1.000 $4,700.000 $8,511.220 $11,550.000 $12,000.000 $10,500.000 $11,500.000 $20.090 $12,000.000 $7,954.410
CONDT (PVC) (SCH 80) (2")
LF 620.000 $12.000 $18.600 $18.500 $19.000 $17.000 $18.000 $2.910 $18.000 $17.380
ELEC CONDR (NO.8) BARE
LF 620.000 $2.000 $2.700 $2.750 $3.000 $2.500 $2.750 $3.390 $3.000 $2.520
ELEC CONDR (NO.8) INSULATED
LF 1,240.000 $2.000 $3.140 $3.000 $3.000 $2.700 $3.000 $3.390 $3.000 $2.930
GROUND BOX TY A (122311)W/APRON
EA 3.000 $1,500.000 $1,372.400 $1,925.000 $2,000.000 $1,750.000 $1,900.000 $1,482.410 $2,000.000 $1,282.610
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 1.000 $9,000.000 $10,304.300 $9,500.000 $9,700.000 $8,550.000 $9,400.000 $11,130.300 $10,000.000 $9,630.180
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $850.000 $1,626.400 $1,675.000 $1,220.000 $1,000.000 $1,100.000 $1,346.480 $2,000.000 $1,165.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 8.000 $810.000 $486.850 $500.000 $620.000 $700.000 $1,100.000 $676.130 $1,500.000 $585.000
REMOVE SM RD SN SUP&AM
EA 6.000 $185.000 $105.930 $110.000 $140.000 $100.000 $110.000 $150.250 $500.000 $130.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 8.000 $57.000 $21.400 $35.000 $33.000 $35.000 $22.000 $24.850 $30.000 $21.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 14.000 $46.000 $26.750 $40.000 $36.000 $35.000 $27.500 $28.320 $30.000 $24.500
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 1.000 $40.000 $53.500 $100.000 $130.000 $35.000 $275.000 $144.470 $500.000 $125.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 11,496.000 $1.000 $0.810 $1.000 $0.800 $0.750 $0.820 $0.870 $2.000 $0.520
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 11,496.000 $1.000 $0.810 $1.000 $0.800 $0.750 $0.820 $0.870 $2.000 $0.520
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 144.000 $6.000 $7.490 $8.000 $7.400 $7.000 $7.700 $8.090 $15.000 $7.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 5,748.000 $2.500 $2.140 $2.250 $2.200 $2.000 $2.200 $2.310 $2.500 $1.350
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 575.000 $2.500 $2.680 $5.000 $1.000 $2.000 $2.200 $0.540 $4.000 $2.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,150.000 $2.500 $2.680 $5.000 $1.000 $2.000 $2.200 $0.570 $4.000 $2.500
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 16.000 $1.000 $8.560 $9.000 $8.500 $20.000 $8.800 $9.250 $15.000 $4.000
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 5,740.000 $1.000 $2.680 $2.750 $2.600 $2.500 $2.750 $2.890 $2.500 $1.650
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 5,740.000 $1.000 $2.680 $2.750 $2.600 $2.500 $2.750 $2.890 $2.500 $1.650
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 119.000 $1.000 $5.350 $6.000 $5.300 $5.000 $5.500 $5.780 $3.000 $1.350
PREFAB PM TY C (W)(24")(SLD)
LF 16.000 $18.000 $21.400 $25.000 $22.000 $20.000 $22.000 $23.120 $15.000 $22.100
REFL PAV MRKR TY I-C
EA 1.000 $6.000 $21.400 $25.000 $22.000 $20.000 $22.000 $23.120 $50.000 $20.000
REFL PAV MRKR TY II-A-A
EA 144.000 $6.000 $10.700 $12.000 $11.000 $10.000 $11.000 $11.560 $15.000 $8.000
ELIM EXT PM & MRKS (4")
LF 5,748.000 $0.600 $1.070 $2.250 $0.700 $2.000 $4.400 $0.650 $2.000 $0.520
BONDING COURSE
GAL 710.000 $6.500 $8.560 $5.500 $6.000 $7.000 $7.000 $4.120 $8.000 $6.500
TEMPORARY DETOUR BRIDGE
EA 1.000 $300,000.000 $445,000.000 $500,000.000 $300,000.000 $200,000.000 $600,000.000 $539,305.690 $950,000.000 $1,020,000.000
Totals: $7,373,105.300 $6,230,927.105 $6,657,813.850 $6,780,150.300 $7,114,128.000 $7,372,316.440 $8,195,695.387 $8,690,667.400 $9,773,671.518
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
Total: $4,000.00