MONTGOMERY CR (0912-37-240)

Items: 45

County: MONTGOMERY
Length: N/A
Highway: CR
District: HOUSTON
Control Number: 0912-37-240
DBE Goal: N/A
Project: BR 2021(232)
Guaranty: N/A
Time: 82 WORKING DAYS
Engineer's Estimate: $837,739.00
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$837,739.00
$759,105.50
Over/Under Est: -9.39% -$78,633.50
Over/Under Est: 25.55% $214,022.82
Amt Left: 38.55% $292,656.32
Over/Under Est: 39.63% $332,003.80
Amt Left: 54.09% $410,637.30
Delta: -11.22% -$117,980.98
Over/Under Est: 44.35% $371,503.39
Amt Left: 59.3% $450,136.89
Delta: -3.38% -$39,499.59
Over/Under Est: 66.63% $558,211.86
Amt Left: 83.89% $636,845.36
Delta: -15.44% -$186,708.47
Subcontractor Percentage Amount
TRAFFIC SIGNS & LINES, LLC 4.99% $39,294.27
CEN TEX HYDROSEED, INC. 3.55% $27,954.84
BROCK CONSTRUCTION, LLC 3.22% $25,356.22
GARNER PAVING & CONSTRUCTION, LTD. 0.70% $5,512.22
Total: 12.46% $98,117.55

Bid Items & Bid Tabulations

45 Total 0 of 45
MONTGOMERY  |  CR  |  HOUSTON  |  0912-37-240  |  05/04/2023  |  $837,739.00  |  BR 2021(232)  |  BRIDGE REPL  |  82 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JOHN REED AND COMPANY, LLC
R CONSTRUCTION CIVIL, LLC
TEXAS MATERIALS GROUP, INC.
SEFBO PIPELINE BRIDGE, INCORPORATED
RAGLE CONSTRUCTION, INC.
PREPARING ROW
STA 3.950 $12,000.000 $5,500.000 $3,400.000 $25,000.000 $8,662.350 $30,000.000
REMOVE STAB BASE & ASPH PAV (4"-5")
SY 709.000 $4.500 $3.000 $35.000 $13.000 $15.650 $7.000
EXCAVATION (ROADWAY)
CY 28.000 $50.000 $50.000 $49.000 $400.000 $55.170 $500.000
EXCAVATION (CHANNEL)
CY 491.000 $15.000 $30.000 $4.500 $60.000 $17.290 $48.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 411.000 $35.000 $30.000 $6.500 $80.000 $44.010 $60.000
BLOCK SODDING
SY 915.000 $4.500 $3.000 $9.500 $6.000 $26.970 $20.000
FERTILIZER
AC 0.189 $1,000.000 $3,000.000 $1,580.000 $1,500.000 $8,214.280 $7,539.680
VEGETATIVE WATERING
MG 22.700 $50.000 $25.000 $45.000 $34.000 $313.130 $260.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 54.000 $125.000 $250.000 $130.000 $320.000 $151.700 $170.000
PRIME COAT (MULTI OPTION)
GAL 194.000 $10.000 $6.000 $9.500 $23.000 $12.690 $15.000
CEM STABIL BKFL
CY 84.000 $150.000 $80.000 $47.000 $150.000 $312.872 $160.000
DRILL SHAFT (30 IN)
LF 330.000 $225.000 $220.000 $460.000 $400.000 $401.020 $392.000
CL C CONC (ABUT)
CY 35.200 $1,200.000 $1,500.000 $2,730.000 $1,800.000 $1,433.600 $1,000.000
REINF CONC SLAB (BOX BEAM)
SF 2,866.000 $20.000 $18.000 $49.000 $34.000 $29.020 $28.000
APPROACH SLAB
CY 47.000 $500.000 $600.000 $830.000 $800.000 $1,160.770 $625.000
SHEAR KEY
CY 25.400 $350.000 $200.000 $220.000 $440.000 $844.470 $470.000
PRESTR CONC BOX BEAM (5B34)
LF 567.000 $325.000 $300.000 $475.000 $370.000 $446.680 $367.000
RIPRAP (MOW STRIP)(4 IN)
CY 42.000 $700.000 $300.000 $420.000 $750.000 $206.680 $637.000
RIPRAP (STONE PROTECTION)(27 IN)
CY 252.000 $180.000 $120.000 $170.000 $205.000 $211.200 $206.000
RAIL (TY T223)
LF 234.000 $150.000 $120.000 $89.000 $180.000 $232.830 $133.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $68,000.000 $75,000.000 $23,560.000 $48,000.000 $71,550.000 $200,000.000
REMOV STR (SMALL FENCE)
LF 22.000 $4.000 $2.000 $1.650 $15.000 $49.090 $22.000
MOBILIZATION
LS 1.000 $77,000.000 $75,000.000 $90,000.000 $110,000.000 $95,850.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $3,000.000 $1,000.000 $2,620.000 $1,000.000 $2,339.430 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 72.000 $30.000 $60.000 $33.000 $50.000 $78.000 $137.250
ROCK FILTER DAMS (REMOVE)
LF 72.000 $15.000 $10.000 $1.700 $10.000 $32.440 $90.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 160.000 $30.000 $30.000 $25.000 $40.000 $62.350 $84.650
CONSTRUCTION EXITS (REMOVE)
SY 160.000 $10.000 $5.000 $1.700 $10.000 $20.500 $60.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 959.000 $3.000 $3.000 $4.000 $6.000 $7.290 $14.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 959.000 $1.000 $1.000 $1.200 $2.000 $1.130 $8.750
DRIVEWAYS (ACP)
SY 46.000 $70.000 $65.000 $81.000 $115.000 $345.130 $105.000
MTL W-BEAM GD FEN (TIM POST)
LF 387.500 $32.000 $24.000 $21.000 $21.000 $34.760 $20.650
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $1,900.000 $1,460.000 $2,300.000 $2,565.000 $1,896.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,600.000 $1,210.000 $1,500.000 $2,200.500 $1,405.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,500.000 $3,000.000 $2,490.000 $3,000.000 $3,942.000 $2,935.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $500.000 $700.000 $910.000 $690.000 $550.800 $685.000
REMOVE SM RD SN SUP&AM
EA 7.000 $60.000 $50.000 $180.000 $180.000 $154.290 $75.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $25.000 $30.000 $12.000 $25.000 $154.580 $25.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 25.000 $95.000 $100.000 $31.000 $125.000 $78.950 $125.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 790.000 $0.500 $2.000 $1.690 $1.500 $3.330 $1.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 790.000 $0.350 $2.000 $1.690 $1.500 $3.330 $1.500
REFL PAV MRKR TY II-A-A
EA 10.000 $4.000 $10.000 $13.000 $10.000 $270.000 $10.000
D-GR HMA TY-C SAC-A PG70-22
TON 64.000 $125.000 $230.000 $200.000 $380.000 $495.280 $340.000
TACK COAT
GAL 49.000 $3.500 $8.000 $15.000 $6.000 $365.990 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 174.000 $80.000 $45.000 $83.000 $125.000 $158.280 $82.000
Totals: $837,739.000 $759,105.500 $1,051,761.820 $1,169,742.800 $1,209,242.418 $1,395,950.875