MONTGOMERY VA (0912-37-237)

Items: 122

County: MONTGOMERY
Length: N/A
Highway: VA
District: HOUSTON
Control Number: 0912-37-237
DBE Goal: N/A
Project: STP 2024(139)TP
Guaranty: N/A
Time: 339 WORKING DAYS
Engineer's Estimate: $3,808,756.47
Date: 10/06/2023 (2 years ago)
Contract Number: N/A
Type: HIKE AND/OR BIKE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$3,808,756.47
$4,077,635.10
Over/Under Est: 7.06% $268,878.63
$4,649,999.99
Over/Under Est: 22.09% $841,243.52
Amt Left: 14.04% $572,364.89
Over/Under Est: 43.2% $1,645,464.46
Amt Left: 33.76% $1,376,585.83
Delta: -17.30% -$804,220.94
Over/Under Est: 46.31% $1,764,020.04
Amt Left: 36.67% $1,495,141.41
Delta: -2.17% -$118,555.58
Over/Under Est: 80.02% $3,047,817.74
Amt Left: 68.15% $2,778,939.11
Delta: -23.04% -$1,283,797.70
Subcontractor Percentage Amount
GMJ PAVING COMPANY LLC 33.29% $1,423,372.13
HAYDEN PAVING, INC. 30.67% $1,311,349.46
PROFESSIONAL TRAFFIC CONTROL LLC 8.06% $344,619.39
TRAFFIC SIGNS & LINES, LLC 4.45% $190,267.53
Total: 76.47% $3,269,608.51

Bid Items & Bid Tabulations

122 Total 0 of 122
MONTGOMERY  |  VA  |  HOUSTON  |  0912-37-237  |  10/06/2023  |  $3,808,756.47  |  STP 2024(139)TP  |  HIKE AND/OR BIKE  |  339 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MBN ENTERPRISES LLC
ICON GC, LLC
FORDE CONSTRUCTION COMPANY, INC.
MAIN LANE INDUSTRIES LTD.
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 9.000 $6,000.000 $9,000.000 $12,500.000 $8,000.000 $5,000.000 $3,925.000
REMOVING CONC (PAV)
SY 67.000 $4.210 $25.000 $24.240 $250.000 $20.000 $208.500
REMOVING CONC (SIDEWALKS)
SY 7.000 $4.070 $25.000 $31.250 $300.000 $40.000 $243.000
REMOVING CONC (DRIVEWAYS)
SY 553.000 $9.550 $14.000 $26.970 $35.000 $20.000 $28.430
REMOVING CONC (CURB)
LF 401.000 $3.850 $8.000 $12.710 $35.000 $5.000 $12.450
REMOVING STAB BASE AND ASPH PAV(4"-16")
SY 2,656.000 $6.000 $14.000 $11.730 $35.000 $30.000 $21.000
EXCAVATION (ROADWAY)
CY 2,680.000 $16.000 $14.000 $34.610 $40.000 $35.000 $114.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 2,607.000 $28.000 $14.000 $50.820 $60.000 $35.000 $95.500
BACKFILL (TY A)
STA 119.000 $296.000 $20.000 $492.790 $800.000 $750.000 $845.000
BLOCK SODDING
SY 16,462.000 $4.000 $8.000 $8.010 $6.800 $4.500 $9.500
FERTILIZER
AC 3.400 $700.000 $2,000.000 $2,713.540 $1,300.000 $500.000 $1,413.000
VEGETATIVE WATERING
MG 408.150 $29.000 $35.000 $1.000 $118.000 $75.000 $57.500
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 72.000 $298.610 $350.000 $362.360 $495.000 $320.000 $396.000
LIME TRT (SUBGRADE)(6")
SY 5,339.000 $7.600 $6.000 $4.490 $11.000 $12.000 $36.000
CEMENT
TON 72.000 $175.790 $300.000 $235.130 $300.000 $250.000 $268.000
CEMENT TREAT (EXIST MATL) (6")
SY 5,339.000 $2.930 $6.000 $9.200 $9.000 $12.000 $23.500
CEM TRT(PLNT MX) (CL N)(TYE)(GR 4)(12")
SY 2,868.000 $40.000 $31.000 $54.030 $54.000 $92.000 $85.350
CEM TRT(PLNT MX) (CL N)(TYE)(GR 4)(14")
SY 5,457.000 $50.000 $35.000 $62.780 $50.000 $100.000 $95.000
CEM TRT(PLNT MX) (CL N)(TYE)(GR 4)(10")
SY 1,048.000 $35.000 $31.000 $45.390 $65.000 $80.000 $89.500
SALV, HAUL & STKPL RCL APH PV (1 1/2")
SY 17,517.000 $2.580 $3.500 $1.140 $1.000 $5.000 $0.120
SALV,HAUL & STKPL RCL APH PV (2")
SY 2,656.000 $1.000 $4.000 $2.050 $1.500 $10.000 $0.120
PLANE ASPH CONC PAV (1.5")
SY 46,850.000 $5.000 $2.000 $1.140 $3.000 $5.000 $4.650
PLANE ASPH CONC PAV (2")
SY 15,837.000 $5.000 $2.000 $1.530 $5.000 $5.000 $6.000
CONC PVMT (CONT REINF)(FAST TRK)(14")
SY 605.000 $150.000 $225.000 $104.440 $135.000 $260.000 $266.620
RIPRAP (MOW STRIP)(4 IN)
CY 23.000 $616.000 $520.000 $522.840 $515.000 $950.000 $1,300.000
WINGWALL (PW - 1) (HW=11 FT)
EA 2.000 $45,000.000 $38,000.000 $90,000.000 $70,000.000 $120,000.000 $218,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $3,111.000 $5,000.000 $1,605.490 $3,600.000 $4,000.000 $4,345.000
REMOV STR (SET)
EA 9.000 $372.540 $3,000.000 $1,002.690 $1,800.000 $600.000 $1,745.000
MOBILIZATION
LS 1.000 $346,250.000 $390,000.000 $202,178.960 $545,000.000 $550,000.000 $789,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $10,000.000 $2,500.000 $1.000 $35,000.000 $7,000.000 $2,560.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,504.000 $3.370 $2.750 $4.450 $3.750 $4.000 $8.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,504.000 $0.940 $2.000 $1.910 $2.000 $1.000 $3.500
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 344.000 $5.070 $10.000 $5.720 $5.000 $5.000 $10.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 344.000 $1.520 $1.000 $1.910 $4.000 $1.000 $2.350
CONC CURB (DOWEL)(SLOTTED)
LF 100.000 $16.000 $17.000 $110.000 $70.000 $70.000 $84.500
CONC CURB (DOWEL)
LF 183.000 $8.610 $15.000 $11.360 $70.000 $45.000 $86.000
DRIVEWAYS (CONC) (FAST TRACK)
SY 477.000 $85.000 $85.000 $107.370 $82.000 $175.000 $279.000
CONC SIDEWALKS (4")
SY 3,200.000 $50.000 $71.000 $58.300 $60.000 $60.000 $87.490
CURB RAMPS (TY 7)
EA 6.000 $1,636.130 $2,000.000 $2,002.210 $2,000.000 $2,100.000 $4,000.000
CONC DIRECTIONAL ISLAND
LF 130.000 $60.000 $85.000 $29.320 $50.000 $79.000 $120.000
MTL W-BEAM GD FEN (TIM POST)
LF 275.000 $24.080 $33.000 $103.110 $30.000 $28.500 $33.500
SHORT RADIUS
LF 35.000 $98.210 $80.000 $78.040 $70.000 $75.000 $88.300
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,748.000 $2,500.000 $1,977.650 $1,750.000 $1,600.000 $1,884.000
MTL BM GD FEN TRANS (31"-28")
EA 2.000 $701.840 $1,500.000 $1,034.580 $1,600.000 $950.000 $1,119.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,240.000 $5,000.000 $3,960.370 $3,600.000 $3,015.000 $3,550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 309.000 $630.000 $555.000 $629.130 $580.000 $565.000 $665.170
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 43.000 $494.440 $450.000 $461.370 $425.000 $495.000 $583.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $49.930 $40.000 $27.960 $25.000 $35.000 $41.200
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 2.000 $140.340 $100.000 $152.520 $135.000 $65.000 $76.500
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 1,440.000 $0.280 $0.600 $1.310 $0.330 $0.500 $0.600
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 40,792.000 $0.290 $0.500 $0.380 $0.330 $0.500 $0.600
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 7,768.000 $0.640 $0.850 $0.640 $0.540 $1.000 $1.180
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 1,100.000 $3.000 $2.500 $2.540 $2.150 $4.000 $4.750
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 100.000 $70.000 $50.000 $88.970 $75.000 $100.000 $118.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 62.000 $95.000 $60.000 $95.320 $80.000 $100.000 $118.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 2,840.000 $0.420 $0.600 $0.390 $0.330 $0.500 $0.600
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 52,250.000 $0.550 $0.550 $0.380 $0.320 $0.500 $0.600
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 7,041.000 $1.380 $2.000 $1.780 $1.500 $1.750 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 880.000 $8.410 $7.000 $8.900 $7.400 $8.000 $9.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 80.000 $143.960 $200.000 $190.650 $159.000 $225.000 $265.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 1.000 $225.000 $500.000 $285.970 $240.000 $325.000 $383.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 59.000 $158.710 $200.000 $203.360 $170.000 $250.000 $294.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 1.000 $650.000 $600.000 $667.260 $560.000 $475.000 $560.000
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
EA 308.000 $125.000 $156.000 $146.160 $125.000 $140.000 $165.000
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 323.000 $140.000 $175.000 $158.870 $138.000 $160.000 $188.000
REFL PAV MRK TY I (W)(BIKE DOT)(100MIL)
EA 532.000 $1.250 $2.500 $6.350 $5.500 $4.350 $5.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 1,250.000 $0.900 $1.600 $1.910 $1.600 $0.920 $1.000
PAVEMENT SEALER 4"
LF 202.000 $0.070 $0.500 $0.050 $0.040 $0.010 $0.010
PAVEMENT SEALER 6"
LF 92,997.000 $0.060 $0.350 $0.080 $0.060 $0.010 $0.010
PAVEMENT SEALER 8"
LF 11,377.000 $0.100 $0.600 $0.100 $0.080 $0.010 $0.010
PAVEMENT SEALER 12"
LF 225.000 $0.150 $1.000 $0.150 $0.130 $0.010 $0.010
PAVEMENT SEALER 24"
LF 2,088.000 $0.440 $1.600 $0.310 $0.250 $0.010 $0.010
PAVEMENT SEALER (ARROW)
EA 105.000 $7.830 $15.000 $8.900 $7.340 $0.010 $0.010
PAVEMENT SEALER (WORD)
EA 76.000 $7.890 $25.000 $8.900 $7.340 $0.010 $0.010
PAVEMENT SEALER (DBL ARROW)
EA 1.000 $60.000 $30.000 $12.710 $11.000 $0.010 $0.010
PAVEMENT SEALER (RR XING)
EA 1.000 $89.300 $150.000 $25.420 $21.000 $0.010 $0.010
PAVEMENT SEALER (BIKE ARROW)
EA 308.000 $55.200 $35.000 $6.350 $5.250 $0.010 $0.010
PAVEMENT SEALER (BIKE SYMBOL)
EA 323.000 $60.000 $69.000 $6.350 $5.250 $0.010 $0.010
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,250.000 $0.820 $1.200 $1.590 $1.300 $0.820 $0.970
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 33,315.000 $0.700 $1.000 $1.400 $1.150 $0.770 $0.910
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 1,620.000 $0.900 $1.200 $1.590 $1.300 $0.820 $0.970
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 40,333.000 $0.750 $1.000 $1.400 $1.150 $0.770 $0.910
REFL PAV MRKR TY I-C
EA 443.000 $8.900 $6.750 $5.720 $4.750 $6.000 $7.060
REFL PAV MRKR TY II-A-A
EA 1,795.000 $7.240 $6.750 $5.720 $4.750 $6.000 $7.060
REFL PAV MRKR TY II-C-R
EA 76.000 $6.200 $6.750 $5.720 $4.750 $6.000 $7.060
ELIM EXT PAV MRK & MRKS (6")
LF 18,636.000 $0.850 $0.600 $0.360 $0.300 $0.680 $0.800
ELIM EXT PAV MRK & MRKS (8")
LF 4,029.000 $1.670 $0.800 $0.510 $0.420 $0.960 $1.130
ELIM EXT PAV MRK & MRKS (12")
LF 640.000 $1.800 $1.200 $1.140 $1.000 $2.000 $2.350
ELIM EXT PAV MRK & MRKS (24")
LF 614.000 $5.080 $2.500 $2.290 $1.900 $4.000 $4.710
ELIM EXT PAV MRK & MRKS (ARROW)
EA 47.000 $61.140 $50.000 $31.770 $26.000 $55.000 $64.750
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 1.000 $97.800 $65.000 $63.550 $53.000 $60.000 $70.640
ELIM EXT PAV MRK & MRKS (WORD)
EA 37.000 $74.660 $50.000 $31.770 $27.000 $55.000 $64.750
ELIM EXT PAV MRK & MRKS (RR XING)
EA 1.000 $175.000 $200.000 $76.260 $65.000 $75.000 $88.300
PAV SURF PREP FOR MRK (6")
LF 92,997.000 $0.140 $0.100 $0.080 $0.060 $0.120 $0.140
PAV SURF PREP FOR MRK (8")
LF 11,377.000 $0.090 $0.100 $0.100 $0.100 $0.160 $0.190
PAV SURF PREP FOR MRK (12")
LF 225.000 $0.190 $0.300 $0.150 $0.130 $0.240 $0.280
PAV SURF PREP FOR MRK (24")
LF 2,088.000 $0.690 $0.500 $0.310 $0.260 $0.480 $0.570
PAV SURF PREP FOR MRK (ARROW)
EA 105.000 $13.990 $5.000 $6.350 $5.350 $5.000 $5.890
PAV SURF PREP FOR MRK (DBL ARROW)
EA 1.000 $36.480 $10.000 $12.710 $10.700 $5.000 $5.890
PAV SURF PREP FOR MRK (WORD)
EA 76.000 $20.520 $15.000 $6.350 $5.350 $5.000 $5.890
PAV SURF PREP FOR MRK (RR XING)
EA 1.000 $78.590 $25.000 $38.140 $32.000 $5.000 $5.890
PAV SURF PREP FOR MRK (BIKE ARROW)
EA 308.000 $20.000 $5.000 $6.350 $5.350 $5.000 $5.890
PAV SURF PREP FOR MRK (BIKE SYMBOL)
EA 323.000 $20.000 $15.000 $6.350 $5.350 $5.000 $5.890
PAV SURF PREP FOR MRK (BIKE DOT)
EA 532.000 $1.990 $1.000 $1.270 $1.070 $5.000 $5.890
D-GR HMA TY-D SAC-A PG70-22
TON 6,095.000 $113.000 $180.000 $265.000 $170.000 $165.000 $192.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 705.000 $123.000 $180.000 $280.000 $200.000 $150.000 $216.000
TACK COAT
GAL 405.000 $2.350 $10.000 $6.040 $4.000 $6.000 $3.250
UNDERSEAL COURSE
GAL 13,606.000 $2.750 $6.550 $0.010 $4.500 $10.000 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 90.000 $47.730 $75.000 $76.260 $225.000 $150.000 $728.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 6,836.000 $1.670 $1.000 $1.210 $1.030 $1.600 $1.880
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 1,130.000 $1.360 $1.200 $1.400 $1.200 $1.650 $1.940
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 54.000 $3.020 $2.750 $3.810 $3.200 $3.500 $4.120
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 4,336.000 $2.040 $2.000 $2.540 $2.150 $3.250 $3.830
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 225.000 $5.540 $3.500 $5.080 $4.300 $6.000 $7.060
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 1,208.000 $10.500 $8.000 $10.170 $8.550 $12.000 $14.130
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 6,023.000 $1.440 $1.200 $1.270 $1.100 $1.600 $1.880
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
LF 110.000 $1.740 $1.200 $2.540 $2.150 $1.650 $1.940
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 1,130.000 $1.450 $1.200 $3.810 $3.200 $1.650 $1.940
MULTIYPOLYMER PAV MRK (W) (ARROW)
EA 25.000 $315.480 $300.000 $203.360 $171.000 $325.000 $382.620
MULTIPOLYMER PAV MRK (W) (WORD)
EA 17.000 $326.730 $300.000 $203.360 $171.000 $325.000 $382.620
TMA (STATIONARY)
DAY 99.000 $227.500 $110.000 $1.850 $310.000 $1,000.000 $223.000
TMA (MOBILE OPERATION)
HR 768.000 $108.490 $20.000 $0.690 $30.000 $100.000 $74.000
Totals: $3,808,756.470 $4,077,635.100 $4,649,999.996 $5,454,220.930 $5,572,776.510 $6,856,574.215