REMOVING CONC (RIPRAP)
|
CY
|
50.000
|
$150.000
|
$110.000
|
$290.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,220.400
|
$25.000
|
$33.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
582.200
|
$30.000
|
$44.000
|
$60.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
3,000.000
|
$3.500
|
$4.400
|
$1.680
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
3,000.000
|
$1.500
|
$0.440
|
$0.450
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
3,000.000
|
$5.000
|
$1.650
|
$1.680
|
|
|
TEMPORARY SPL SHORING
|
SF
|
50.000
|
$50.000
|
$110.000
|
$100.000
|
|
|
SOIL NAIL ANCHORS
|
LF
|
1,796.000
|
$15.000
|
$30.800
|
$42.040
|
|
|
RET. WALL (SOIL NAILED) (GUNNITE FACIA)
|
SF
|
1,603.000
|
$15.000
|
$27.500
|
$17.330
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
34.000
|
$200.000
|
$165.000
|
$175.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
6.000
|
$500.000
|
$700.000
|
$650.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
52.000
|
$90.000
|
$82.500
|
$150.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,800.000
|
$2,640.000
|
$3,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,300.000
|
$1,100.000
|
$750.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$110,000.000
|
$115,000.000
|
$158,019.180
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
2.000
|
$10,000.000
|
$15,000.000
|
$15,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
112.000
|
$18.000
|
$22.000
|
$22.400
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
112.000
|
$9.000
|
$19.800
|
$20.160
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,820.000
|
$3.220
|
$3.850
|
$3.920
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,820.000
|
$2.000
|
$1.100
|
$1.120
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
150.000
|
$6.000
|
$4.400
|
$4.480
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
150.000
|
$3.000
|
$1.100
|
$1.120
|
|
|
PCTB FUR&INSTL(F-SHAPE OR SNGL SLP)TY1
|
LF
|
5,160.000
|
$40.000
|
$30.000
|
$72.000
|
|
|
PCTB MOVE&RESET(F-SHAPE OR SNGL SLPTY1
|
LF
|
2,580.000
|
$10.000
|
$7.000
|
$20.000
|
|
|
PORT CTB REMOVE(F-SHAPE OR SNGL SLP)TY1
|
LF
|
5,160.000
|
$15.000
|
$17.000
|
$20.000
|
|
|
CONC CURB (TY I)
|
LF
|
100.000
|
$30.000
|
$30.000
|
$35.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,500.000
|
$1,000.000
|
$812.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$2,000.000
|
$1,000.000
|
$812.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$9,500.000
|
$8,008.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
1.000
|
$2,000.000
|
$2,035.000
|
$2,072.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
3.000
|
$400.000
|
$423.500
|
$431.200
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
2.000
|
$300.000
|
$605.000
|
$616.000
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
1.000
|
$400.000
|
$385.000
|
$392.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
4.000
|
$80.000
|
$85.800
|
$87.360
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRF
|
EA
|
28.000
|
$30.000
|
$85.800
|
$87.360
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
1.000
|
$35.000
|
$85.800
|
$87.360
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
3,438.000
|
$2.000
|
$0.780
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
3,418.000
|
$1.750
|
$0.780
|
$0.800
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
710.000
|
$1.000
|
$1.340
|
$1.370
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
268.000
|
$5.000
|
$6.820
|
$6.940
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
1.000
|
$800.000
|
$1,342.000
|
$1,366.400
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
940.000
|
$1.000
|
$0.840
|
$0.850
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
3,650.000
|
$0.750
|
$0.680
|
$0.690
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
4,270.000
|
$1.000
|
$0.680
|
$0.690
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
115.000
|
$3.500
|
$4.640
|
$4.730
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
1,356.000
|
$0.750
|
$1.070
|
$1.090
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
580.000
|
$1.000
|
$1.760
|
$1.790
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
110.000
|
$120.000
|
$109.000
|
$115.000
|
|
|
REP STL BRIDGE MEMBERS
|
LS
|
1.000
|
$500,000.000
|
$287,000.000
|
$315,000.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
1,832.000
|
$100.000
|
$68.200
|
$100.000
|
|
|
D-GR HMA TY-C SAC-B PG70-22
|
TON
|
385.000
|
$120.000
|
$84.700
|
$105.000
|
|
|
TACK COAT
|
GAL
|
1,002.000
|
$3.000
|
$3.580
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
225.000
|
$95.000
|
$80.000
|
$168.860
|
|
|
TMA (STATIONARY)
|
DAY
|
56.000
|
$150.000
|
$300.000
|
$562.870
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$175.000
|
$300.000
|
$1,125.730
|
|
Totals: |
$1,447,445.900
|
$1,183,845.220
|