Bid Cobra

MEDINA FM 2676 (2649-01-035)

Items: 74

County: MEDINA
Length: N/A
Highway: FM 2676
District: SAN ANTONIO
Control Number: 2649-01-035
DBE Goal: N/A
Project: BR 2023(384)
Guaranty: N/A
Time: 284 WORKING DAYS
Engineer's Estimate: $4,562,659.07
Date: 12/02/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
CHRISTEN LONGORIA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$4,562,659.07
1
$4,254,249.67
Over/Under Est: -6.76% -$308,409.40
Over/Under Est: 2.91% $132,787.54
Amt Left: 10.37% $441,196.94
Over/Under Est: 14.85% $677,545.55
Amt Left: 23.18% $985,954.95
Delta: -11.60% -$544,758.01
Over/Under Est: 19.19% $875,510.81
Amt Left: 27.83% $1,183,920.21
Delta: -3.78% -$197,965.26
Over/Under Est: 22.84% $1,042,269.31
Amt Left: 31.75% $1,350,678.71
Delta: -3.07% -$166,758.50
Subcontractor Percentage Amount
FARR FOUNDATION, INC. 7.32% $311,411.08
GREGORY PILE DRIVING, INC. 7.26% $308,858.53
AAA DRILLING FOUNDATION COMPANY, INC. 5.42% $230,580.33
TEXAS MATERIALS GROUP, INC. 4.57% $194,419.21
DIIBS SPECIALISTS, LLC 1.51% $64,239.17
TORO BRAVO CONSTRUCTION, LLC 1.26% $53,603.55
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 1.14% $48,498.45
FLASHER EQUIPMENT COMPANY 0.51% $21,696.67
Total: 28.99% $1,233,306.99

Bid Items & Bid Tabulations

74 Total 0 of 74
MEDINA  |  FM 2676  |  SAN ANTONIO  |  2649-01-035  |  12/02/2022  |  $4,562,659.07  |  BR 2023(384)  |  BRIDGE REPL  |  284 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
E-Z BEL CONSTRUCTION, LLC
ACME BRIDGE COMPANY, INC.
HUNTER INDUSTRIES, LTD.
AUSTIN BRIDGE & ROAD SERVICES, LP
PREPARING ROW
STA 16.000 $6,000.000 $5,000.000 $6,670.000 $4,901.470 $19,287.500 $22,419.710
REMOVING CONC (PAV)
SY 874.000 $20.000 $15.000 $5.000 $19.110 $30.780 $21.740
REMOVING CONC (RIPRAP)
SY 1,097.000 $6.400 $15.000 $5.000 $23.740 $17.100 $9.310
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 89.000 $6.500 $15.000 $20.000 $11.260 $75.240 $42.090
REMOVING STAB BASE & ASPH PV(10 TO 16")
SY 3,148.000 $3.000 $5.000 $7.750 $10.820 $6.840 $18.400
EXCAVATION (ROADWAY)
CY 1,712.000 $12.000 $12.000 $16.000 $22.700 $23.940 $22.770
EXCAVATION (CHANNEL)
CY 2,126.000 $25.000 $12.000 $18.000 $18.810 $23.940 $21.140
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 3,588.000 $12.000 $25.000 $36.000 $14.580 $17.100 $33.810
FURNISHING AND PLACING TOPSOIL (4")
SY 6,099.000 $2.000 $3.500 $8.000 $2.880 $2.520 $3.450
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 6,099.000 $0.350 $1.045 $0.250 $0.320 $0.250 $0.300
VEGETATIVE WATERING
MG 95.200 $24.000 $40.000 $97.000 $63.210 $41.030 $20.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 6,099.000 $0.980 $2.290 $1.850 $1.160 $1.850 $1.100
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 1,387.000 $46.000 $45.000 $65.500 $91.260 $71.670 $100.430
PRIME COAT(MC-30 OR AE-P)
GAL 890.000 $4.100 $4.830 $4.500 $5.080 $8.910 $4.700
CEM STABIL BKFL
CY 201.000 $77.000 $140.000 $188.250 $240.720 $175.000 $150.500
TEMPORARY SPL SHORING
SF 7,319.000 $26.000 $20.000 $19.450 $32.440 $20.000 $80.000
DRILLED SHAFT (36IN)(SRC)
LF 1,360.000 $250.000 $365.000 $339.000 $382.170 $310.000 $400.000
CL C CONC (ABUT)(SRC)
CY 64.200 $1,300.000 $1,211.000 $1,000.000 $1,375.900 $1,400.000 $1,635.980
CL C CONC (CAP)
CY 85.200 $2,000.000 $1,680.000 $1,200.000 $1,711.620 $1,800.000 $1,998.490
CL C CONC (COLUMN)
CY 87.500 $1,600.000 $1,344.000 $1,400.000 $1,385.460 $1,150.000 $1,226.580
REINF CONC SLAB
SF 24,380.000 $18.000 $23.000 $23.310 $29.130 $25.000 $23.750
APPROACH SLAB
CY 83.800 $400.000 $735.000 $775.000 $801.900 $650.000 $738.830
RETAINING WALL (TEMP WALL)
SF 948.000 $20.000 $25.000 $35.000 $53.720 $20.000 $37.370
PRESTR CONC GIRDER (TX54)
LF 3,165.060 $130.000 $195.000 $238.400 $262.420 $190.000 $175.990
RIPRAP (MOW STRIP)(4 IN)
CY 78.000 $580.000 $450.000 $650.000 $802.150 $845.710 $739.530
RAIL (TY T223)
LF 1,108.000 $80.000 $75.000 $100.000 $102.480 $150.000 $114.520
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 138.000 $130.000 $150.000 $150.000 $169.060 $140.000 $154.640
GABIONS (GALV)
CY 2,152.000 $280.000 $165.000 $245.000 $202.970 $355.070 $200.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $250,000.000 $150,000.000 $71,450.000 $113,803.570 $130,000.000 $200,000.000
MOBILIZATION
LS 1.000 $415,000.000 $350,000.000 $460,000.000 $472,857.560 $550,000.000 $554,887.910
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $13,000.000 $2,800.000 $4,000.000 $3,222.010 $6,000.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 110.000 $37.000 $48.840 $37.300 $37.030 $37.300 $35.000
ROCK FILTER DAMS (REMOVE)
LF 110.000 $9.300 $27.500 $8.900 $10.580 $8.900 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $23.000 $43.850 $18.150 $23.280 $18.150 $22.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $4.000 $19.800 $6.000 $2.120 $6.000 $2.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,596.000 $3.000 $4.980 $3.650 $2.800 $3.650 $2.860
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,596.000 $0.570 $0.660 $0.500 $1.060 $0.500 $1.000
CONSTRUCTING DETOURS
SY 388.000 $47.000 $50.000 $25.000 $24.040 $49.500 $22.930
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 18.000 $4,800.000 $3,000.000 $2,100.000 $2,327.660 $2,834.380 $216.500
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,530.000 $30.000 $18.000 $24.000 $105.850 $60.000 $83.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,280.000 $4.000 $15.000 $9.500 $5.340 $3.500 $3.740
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,530.000 $4.100 $16.000 $20.000 $21.910 $25.000 $11.060
DRIVEWAYS (ACP)(TYPE 1)
SY 82.000 $54.000 $85.000 $100.000 $30.940 $27.000 $98.680
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 1,881.000 $0.230 $3.000 $3.660 $3.170 $5.260 $3.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,175.000 $35.000 $32.720 $29.750 $34.490 $30.160 $32.800
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,600.000 $2,884.450 $3,222.000 $3,013.210 $2,659.080 $2,486.000
SHORT RADIUS
LF 25.000 $820.000 $37.780 $34.350 $73.530 $34.830 $69.500
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $1,200.000 $866.840 $788.000 $1,428.340 $799.110 $1,350.000
REMOVE METAL BEAM GUARD FENCE
LF 1,462.500 $4.200 $4.400 $4.000 $2.120 $4.060 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $250.000 $281.020 $255.500 $370.310 $259.060 $350.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,300.000 $3,525.300 $3,205.000 $3,232.270 $3,249.850 $3,055.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,000.000 $440.000 $550.000 $1,322.540 $1,295.290 $1,250.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $440.000 $300.000 $370.310 $761.300 $8,410.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $8,900.000 $7,700.000 $10,000.000 $8,898.010 $9,014.910 $28.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $570.000 $830.500 $755.000 $798.810 $669.800 $755.000
REMOVE SM RD SN SUP&AM
EA 4.000 $120.000 $137.500 $125.000 $132.250 $116.830 $125.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 10.000 $27.000 $30.800 $28.000 $29.630 $26.120 $28.000
INSTL OM ASSM (OM-3R)(TWT)GND
EA 2.000 $350.000 $324.500 $295.000 $312.120 $338.100 $295.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 54.000 $27.000 $41.800 $38.000 $40.210 $34.400 $38.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 6,060.000 $0.630 $1.650 $1.500 $1.590 $1.500 $1.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $7.500 $22.000 $20.000 $21.160 $20.000 $20.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 3,021.000 $0.450 $0.710 $0.650 $0.690 $0.650 $0.650
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 3,020.000 $0.400 $0.710 $0.650 $0.690 $0.650 $0.650
REFL PAV MRKR TY I-C
EA 18.000 $9.600 $11.000 $10.000 $10.580 $10.000 $10.000
REFL PAV MRKR TY II-A-A
EA 37.000 $6.600 $11.000 $10.000 $10.580 $10.000 $10.000
FULL - WIDTH MOWING
CYC 6.000 $2,700.000 $1,500.000 $2,000.000 $1,626.580 $3,950.780 $800.000
LITTER REMOVAL
CYC 17.000 $1,700.000 $900.000 $700.000 $841.410 $1,565.610 $591.770
D-GR HMA TY-C PG70-22 (EXEMPT)
TON 633.000 $170.000 $153.180 $145.000 $176.690 $133.200 $127.260
SP MIXES SP-C SAC-B PG70-22 (EXEMPT)
TON 498.000 $170.000 $161.250 $155.000 $158.700 $133.200 $116.130
BONDING COURSE
GAL 654.000 $6.100 $6.450 $6.000 $5.290 $5.260 $3.550
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $270.000 $400.000 $450.000 $168.280 $521.870 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $11,000.000 $10,500.000 $9,700.000 $14,936.990 $20,000.000 $11,000.000
TMA (STATIONARY)
DAY 544.000 $280.000 $50.000 $70.000 $74.680 $250.000 $150.000
TMA (MOBILE OPERATION)
HR 32.000 $81.000 $200.000 $50.000 $101.770 $70.000 $100.000
Totals: $4,562,659.070 $4,254,249.675 $4,695,446.614 $5,240,204.631 $5,438,169.886 $5,604,928.407