Show Job Controls
Bid Cobra

MCMULLEN SH 16 (0517-03-035)

Items: 165

County: MCMULLEN
Length: N/A
Highway: SH 16
District: SAN ANTONIO
Control Number: 0517-03-035
DBE Goal: N/A
Project: STP 2018(873)
Guaranty: N/A
Time: 524 WORKING DAYS
Engineer's Estimate: $35,483,857.06
Date: 07/10/2018 (7 years ago)
Contract Number: N/A
Type: REHAB & WIDEN TO PROVIDE PASSING LANES & OP IMP
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$35,483,857.06
$40,124,534.36
Over/Under Est: 13.08% $4,640,677.30
Over/Under Est: 15.87% $5,632,868.55
Amt Left: 2.47% $992,191.25
Over/Under Est: 18.69% $6,632,245.65
Amt Left: 4.96% $1,991,568.35
Delta: -2.43% -$999,377.10
$42,299,005.96
Over/Under Est: 19.21% $6,815,148.90
Amt Left: 5.42% $2,174,471.60
Delta: -0.43% -$182,903.25
Over/Under Est: 39.14% $13,890,003.12
Amt Left: 23.05% $9,249,325.82
Delta: -16.73% -$7,074,854.22

Bid Items & Bid Tabulations

165 Total 0 of 165
MCMULLEN  |  SH 16  |  SAN ANTONIO  |  0517-03-035  |  07/10/2018  |  $35,483,857.06  |  STP 2018(873)  |  REHAB & WIDEN TO PROVIDE PASSING LAN...  |  524 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DEAN WORD COMPANY, LTD.
ANGEL BROTHERS HOLDINGS CORP.
ANDERSON COLUMBIA CO., INC.
HUNTER INDUSTRIES, LTD.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
PREPARING ROW
STA 773.000 $650.000 $110.515 $325.000 $325.000 $572.550 $650.000
REMOVING CONC (RIPRAP)
SY 555.000 $9.000 $12.697 $10.000 $12.500 $6.660 $11.000
EXCAVATION (ROADWAY)
CY 159,216.100 $22.050 $32.683 $10.000 $17.000 $12.790 $14.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 31,420.300 $6.520 $7.502 $4.000 $10.000 $3.330 $17.000
EMBANKMENT (FINAL)(ORD COMP)(TY C2)(DS)
CY 214.000 $50.000 $50.350 $70.000 $135.000 $70.740 $79.000
COMPOST MANUF TOPSOIL (4")
SY 341,085.000 $1.340 $0.978 $1.100 $0.900 $0.750 $1.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 341,085.000 $0.130 $0.120 $0.140 $0.150 $0.140 $0.140
DRILL SEED (TEMP)(WARM OR COOL)
SY 341,085.000 $0.080 $0.090 $0.080 $0.080 $0.080 $0.080
VEGETATIVE WATERING
MG 5,342.000 $21.160 $18.684 $8.000 $41.000 $23.310 $35.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 7,306.000 $0.920 $1.308 $0.770 $0.800 $0.750 $0.750
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
SY 185,019.000 $6.000 $17.790 $16.750 $18.000 $18.330 $26.000
PRIME COAT (EC-30)
GAL 37,021.000 $3.500 $4.664 $3.750 $3.000 $4.710 $3.500
ASPH (AC-15P)
GAL 273,744.000 $2.500 $3.137 $3.150 $3.000 $3.560 $3.000
AGGR(TY-PB GR-4 SAC-B)
CY 7,360.000 $34.970 $85.989 $76.000 $80.000 $75.110 $80.000
D-GR HMA TY-B PG64-22
TON 209,680.000 $50.650 $55.103 $68.000 $67.000 $71.250 $80.000
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
TON 92,449.000 $81.000 $81.656 $95.000 $90.000 $97.070 $87.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 750.000 $26.000 $32.203 $45.000 $48.000 $42.750 $65.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 1,500.000 $13.000 $25.180 $32.000 $24.000 $21.380 $45.000
PLANE ASPH CONC PAV(0" TO 2")
SY 199,916.000 $0.910 $1.822 $1.650 $1.400 $1.280 $1.800
CEM STABIL BKFL
CY 2,134.000 $100.000 $139.050 $80.000 $105.000 $140.430 $70.000
CUT & RESTORING PAV
SY 1,515.000 $79.890 $32.100 $42.000 $43.000 $91.990 $38.000
TRENCH EXCAVATION PROTECTION
LF 1,878.000 $5.000 $5.150 $10.000 $5.000 $5.400 $1.000
TEMPORARY SPL SHORING
SF 16,965.000 $12.290 $8.240 $10.000 $8.000 $8.640 $13.000
CL C CONC (COLLAR)
EA 32.000 $1,050.000 $1,030.000 $800.000 $1,050.000 $1,080.220 $800.000
CL C CONC (MISC)
CY 18.000 $674.040 $494.400 $800.000 $490.000 $518.510 $675.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 300.000 $180.000 $128.750 $125.000 $130.000 $135.030 $185.000
RIPRAP (CONC)(5 IN)
CY 634.000 $300.000 $463.500 $460.000 $450.000 $486.100 $400.000
RIPRAP (MOW STRIP)(4 IN)
CY 75.000 $525.000 $412.000 $575.000 $410.000 $432.090 $450.000
CLEANING AND SEALING EXISTING JOINTS
LF 1,932.000 $23.000 $10.300 $12.500 $11.000 $11.780 $19.000
HEADER TYPE EXPANSION JOINT
CF 322.000 $294.650 $499.550 $385.000 $355.000 $359.960 $350.000
JOINT SEALANT
LF 1,932.000 $6.980 $6.180 $9.000 $9.000 $8.960 $19.000
CMP (GAL STL 18 IN)
LF 103.000 $68.000 $51.500 $70.000 $51.000 $54.010 $60.470
CMP (GAL STL 24 IN)
LF 50.000 $72.570 $61.800 $75.000 $61.000 $64.810 $68.210
CONC BOX CULV (3 FT X 2 FT)
LF 65.000 $230.000 $360.500 $220.000 $355.000 $378.080 $292.000
CONC BOX CULV (4 FT X 2 FT)
LF 291.000 $190.000 $412.000 $230.000 $405.000 $432.090 $325.000
CONC BOX CULV (5 FT X 2 FT)
LF 89.000 $285.000 $463.500 $350.000 $460.000 $486.100 $350.000
CONC BOX CULV (5 FT X 4 FT)
LF 30.000 $240.000 $515.000 $310.000 $510.000 $540.110 $450.000
CONC BOX CULV (6 FT X 3 FT)
LF 103.000 $270.000 $566.500 $350.000 $560.000 $594.120 $523.000
CONC BOX CULV (6 FT X 4 FT)
LF 52.000 $330.000 $592.250 $835.000 $580.000 $621.130 $555.000
CONC BOX CULV (6 FT X 6 FT)
LF 191.000 $410.000 $643.750 $480.000 $630.000 $675.140 $587.000
CONC BOX CULV (7 FT X 4 FT)
LF 677.000 $275.000 $448.050 $820.000 $440.000 $469.900 $593.000
CONC BOX CULV (7 FT X 7 FT)
LF 10.000 $470.000 $978.500 $1,800.000 $980.000 $1,026.210 $1,090.000
RC PIPE (CL III)(18 IN)
LF 74.000 $50.440 $61.800 $70.000 $60.000 $64.810 $55.000
RC PIPE (CL III)(24 IN)
LF 1,000.000 $70.000 $77.250 $75.000 $76.000 $81.020 $63.000
RC PIPE (CL III)(30 IN)
LF 300.000 $90.000 $97.850 $85.000 $96.000 $102.620 $86.000
RC PIPE (CL III)(36 IN)
LF 577.000 $110.000 $139.050 $110.000 $135.000 $145.830 $118.000
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
EA 4.000 $5,200.000 $4,326.000 $3,500.000 $4,250.000 $4,536.940 $6,821.840
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $8,900.000 $8,240.000 $10,500.000 $8,150.000 $8,641.790 $13,859.170
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $18,000.000 $19,055.000 $32,500.000 $18,800.000 $19,984.140 $27,456.760
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $18,000.000 $24,720.000 $45,000.000 $24,400.000 $25,925.370 $34,877.710
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 1.000 $5,350.000 $8,240.000 $4,700.000 $8,150.000 $8,641.790 $4,668.290
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
EA 1.000 $5,700.000 $8,394.500 $6,000.000 $8,310.000 $8,803.820 $6,227.710
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
EA 6.000 $4,794.390 $5,665.000 $5,500.000 $5,590.000 $5,941.230 $4,978.440
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
EA 4.000 $7,100.000 $5,922.500 $6,500.000 $5,870.000 $6,211.290 $6,691.060
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $7,500.000 $5,922.500 $6,600.000 $5,820.000 $6,211.290 $6,072.030
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
EA 1.000 $8,400.000 $5,922.500 $7,500.000 $5,840.000 $6,211.290 $7,787.140
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 7.000 $5,100.000 $5,922.500 $6,000.000 $5,850.000 $6,211.290 $7,156.890
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
EA 1.000 $4,500.000 $10,300.000 $8,000.000 $10,200.000 $10,802.240 $8,716.310
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 1.000 $4,400.000 $9,270.000 $13,500.000 $9,150.000 $9,722.020 $8,086.070
SET (TY I)(S= 5 FT)(HW= 5 FT)(6:1) (C)
EA 1.000 $9,700.000 $10,300.000 $20,000.000 $10,200.000 $10,802.240 $9,645.490
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 4.000 $4,500.000 $3,605.000 $7,000.000 $3,550.000 $3,780.780 $9,645.490
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 15.000 $7,100.000 $3,399.000 $6,500.000 $3,300.000 $3,564.740 $9,954.380
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 12.000 $7,200.000 $3,450.500 $7,500.000 $3,400.000 $3,618.750 $11,669.500
SET (TY I)(S= 6 FT)(HW= 5 FT)(6:1) (C)
EA 7.000 $9,500.000 $3,811.000 $7,500.000 $3,770.000 $3,996.830 $13,383.360
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
EA 2.000 $8,500.000 $11,896.500 $22,500.000 $11,700.000 $12,476.590 $12,754.370
SET (TY I)(S= 7 FT)(HW= 5 FT)(3:1) (C)
EA 58.000 $8,025.000 $3,605.000 $4,500.000 $3,500.000 $3,780.780 $11,670.740
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
EA 36.000 $7,200.000 $4,635.000 $7,500.000 $4,500.000 $4,861.010 $13,383.360
SET (TY I)(S= 7 FT)(HW= 6 FT)(3:1) (C)
EA 12.000 $7,500.000 $3,605.000 $7,500.000 $3,550.000 $3,780.780 $13,383.360
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 6.000 $1,097.910 $1,030.000 $550.000 $1,020.000 $1,080.220 $1,489.670
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $785.000 $1,287.500 $750.000 $1,260.000 $1,350.280 $1,489.670
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $1,250.000 $1,287.500 $750.000 $1,275.000 $1,350.280 $1,877.030
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $1,500.000 $1,545.000 $900.000 $1,510.000 $1,620.340 $1,721.340
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 14.000 $1,218.650 $1,545.000 $1,350.000 $1,520.000 $1,620.340 $1,798.560
SET (TY II) (24 IN) (RCP) (5: 1) (C)
EA 4.000 $1,400.000 $1,545.000 $1,350.000 $1,530.000 $1,620.340 $1,837.180
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 38.000 $1,500.000 $1,545.000 $1,500.000 $1,540.000 $1,620.340 $1,877.030
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 5.000 $1,800.000 $1,802.500 $2,000.000 $1,785.000 $1,890.390 $3,628.270
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 3.000 $1,800.000 $1,802.500 $2,100.000 $1,785.000 $1,890.390 $4,401.750
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 3.000 $2,500.000 $2,369.000 $3,000.000 $2,340.000 $2,484.510 $1,645.360
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 7.000 $2,500.000 $2,575.000 $3,500.000 $2,550.000 $2,700.560 $5,022.030
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 8.000 $4,000.000 $3,090.000 $6,150.000 $3,060.000 $3,240.670 $5,951.210
CLEAN EXIST CULVERTS
EA 26.000 $1,300.000 $1,802.500 $2,000.000 $5,250.000 $1,890.390 $9,472.360
REMOV STR (SET)
EA 47.000 $500.000 $515.000 $1,250.000 $510.000 $540.110 $1,700.000
REMOV STR (WINGWALL)
EA 39.000 $1,300.000 $1,030.000 $1,650.000 $1,015.000 $1,080.220 $4,500.000
REMOV STR (HEADWALL)
EA 12.000 $1,300.000 $515.000 $1,500.000 $510.000 $540.110 $3,000.000
REMOV STR (PIPE)
LF 1,829.000 $20.000 $10.300 $10.000 $10.000 $10.800 $15.000
REMOV STR (BOX CULVERT)
LF 1,085.000 $55.710 $10.300 $75.000 $10.000 $10.800 $95.000
MOBILIZATION
LS 1.000 $3,098,892.340 $2,725,699.470 $3,100,000.000 $2,890,000.000 $3,073,574.930 $4,480,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 33.000 $3,300.000 $7,227.701 $3,000.000 $6,600.000 $4,335.780 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 13,885.000 $27.990 $30.643 $20.000 $20.000 $19.500 $32.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,137.000 $22.150 $35.587 $25.000 $23.000 $23.000 $32.000
ROCK FILTER DAMS (REMOVE)
LF 15,022.000 $7.220 $7.056 $6.000 $6.000 $6.000 $9.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,245.000 $12.880 $16.738 $11.000 $11.000 $11.000 $11.000
CONSTRUCTION EXITS (REMOVE)
SY 1,245.000 $5.890 $7.828 $2.000 $2.000 $2.000 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 33,925.000 $1.760 $2.524 $1.500 $1.800 $1.750 $2.800
TEMP SEDMT CONT FENCE (REMOVE)
LF 33,925.000 $0.320 $0.361 $0.500 $0.500 $0.500 $0.810
CONSTRUCTING DETOURS
SY 1,948.000 $41.900 $53.029 $50.000 $50.000 $39.420 $45.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 320.000 $50.000 $55.840 $74.000 $140.000 $57.000 $75.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 4,470.000 $70.350 $89.612 $85.000 $134.000 $91.200 $105.870
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 12,540.000 $19.900 $12.215 $25.000 $28.000 $9.000 $55.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 55,940.000 $9.000 $4.777 $8.000 $10.000 $8.000 $4.500
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 12,540.000 $8.640 $11.585 $15.000 $15.000 $9.000 $4.500
DRIVEWAYS (ACP)
SY 608.000 $42.330 $55.961 $45.000 $76.000 $39.420 $30.000
DRIVEWAYS (SURF TREAT)
SY 8,378.000 $3.120 $37.193 $28.000 $38.000 $28.470 $20.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,050.000 $18.870 $23.783 $23.000 $24.000 $23.090 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,302.910 $2,184.550 $2,000.000 $1,730.000 $2,195.000 $2,200.000
REMOVE METAL BEAM GUARD FENCE
LF 1,400.000 $18.870 $1.030 $1.000 $1.000 $1.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $1,302.910 $154.500 $135.000 $150.000 $150.000 $250.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $26.330 $154.500 $135.000 $150.000 $150.000 $120.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,132.840 $2,626.500 $3,000.000 $2,600.000 $2,550.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $280.000 $56.650 $225.000 $56.000 $55.000 $340.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 68.000 $1,031.150 $735.420 $1,300.000 $2,500.000 $714.000 $2,200.000
CRASH CUSH ATTEN (REMOVE)
EA 14.000 $492.260 $154.500 $550.000 $150.000 $150.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 14.000 $6,050.000 $6,463.250 $7,000.000 $7,700.000 $6,275.000 $10,000.000
ALUMINUM SIGNS (TY A)
SF 59.000 $22.050 $26.780 $28.000 $26.000 $17.000 $22.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 50.000 $414.920 $370.800 $485.000 $410.000 $360.000 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 51.000 $498.040 $458.350 $560.000 $490.000 $445.000 $400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 1.000 $727.780 $659.200 $740.000 $570.000 $640.000 $567.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 18.000 $455.530 $628.300 $675.000 $680.000 $610.000 $510.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $698.860 $602.550 $725.000 $700.000 $585.000 $532.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 4.000 $632.000 $669.500 $890.000 $810.000 $650.000 $646.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 3.000 $1,100.000 $757.050 $850.000 $990.000 $735.000 $718.000
REMOVE SM RD SN SUP&AM
EA 100.000 $78.430 $41.200 $70.000 $68.000 $40.000 $40.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 38.000 $14.900 $26.780 $12.000 $12.000 $26.000 $3.450
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 174.000 $69.260 $66.950 $80.000 $66.000 $65.000 $27.030
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 27.000 $14.390 $29.870 $15.000 $18.000 $29.000 $6.620
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 7,369.000 $0.250 $0.309 $0.310 $0.300 $0.300 $0.300
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 299,226.000 $0.250 $0.288 $0.310 $0.300 $0.300 $0.280
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,019.000 $0.250 $0.690 $0.620 $0.600 $0.610 $0.670
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 452.000 $3.000 $5.150 $4.100 $4.000 $4.040 $5.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 19.000 $78.000 $91.670 $67.000 $66.000 $65.690 $89.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 7.000 $93.000 $114.330 $80.000 $77.000 $75.800 $111.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 24,778.000 $0.250 $0.309 $0.310 $0.300 $0.300 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 164,814.000 $0.250 $0.288 $0.310 $0.300 $0.300 $0.280
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 7,666.000 $0.500 $0.649 $1.000 $1.000 $0.960 $0.630
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 8,451.000 $0.500 $0.649 $1.000 $1.000 $0.960 $0.630
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 3,276.000 $0.570 $0.515 $3.200 $3.000 $3.030 $0.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,342.000 $0.710 $0.690 $1.000 $1.000 $0.960 $0.670
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
LF 102.000 $4.300 $3.543 $4.300 $4.000 $4.040 $3.440
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 824.000 $5.310 $5.150 $5.350 $5.000 $5.050 $5.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 14.000 $93.520 $95.790 $102.000 $96.000 $96.010 $93.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 18.000 $93.520 $388.310 $190.000 $180.000 $176.860 $377.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 14.000 $105.280 $114.330 $135.000 $125.000 $126.330 $111.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 10.000 $36.950 $33.990 $27.000 $25.000 $25.270 $33.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 6.000 $201.270 $342.990 $270.000 $250.000 $252.660 $333.000
PAVEMENT SEALER 4"
LF 333,112.000 $0.120 $0.103 $0.150 $0.150 $0.150 $0.100
PAVEMENT SEALER 6"
LF 300,720.000 $0.220 $0.155 $0.150 $0.150 $0.150 $0.150
PAVEMENT SEALER 8"
LF 3,342.000 $0.410 $0.381 $0.310 $0.300 $0.300 $0.370
PAVEMENT SEALER 18"
LF 102.000 $2.100 $3.090 $2.000 $2.000 $2.020 $3.000
PAVEMENT SEALER 24"
LF 824.000 $2.420 $3.090 $3.100 $3.000 $3.030 $3.000
PAVEMENT SEALER (ARROW)
EA 14.000 $52.680 $54.590 $47.000 $46.000 $45.480 $53.000
PAVEMENT SEALER (WORD)
EA 14.000 $53.950 $54.590 $47.000 $46.000 $45.480 $53.000
PAVEMENT SEALER (MED NOSE)
EA 6.000 $190.400 $193.640 $80.000 $77.000 $75.800 $188.000
PAVEMENT SEALER (LNDP ARROW)
EA 18.000 $20.000 $217.330 $47.000 $46.000 $45.480 $211.000
PAVEMENT SEALER (YLD TRI)
EA 10.000 $20.000 $38.110 $5.500 $5.000 $5.050 $37.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 19,230.000 $0.330 $0.371 $0.460 $0.450 $0.450 $0.360
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,740.000 $0.260 $0.371 $0.460 $0.450 $0.450 $0.360
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 16,636.000 $0.280 $0.371 $0.460 $0.450 $0.450 $0.360
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 300,720.000 $1.270 $0.968 $0.660 $0.700 $0.660 $0.940
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 292,230.000 $0.680 $0.649 $0.660 $0.700 $0.660 $0.630
REFL PAV MRKR TY I-C
EA 1,553.000 $3.030 $3.090 $5.300 $5.000 $5.050 $3.000
REFL PAV MRKR TY II-A-A
EA 4,504.000 $2.800 $2.884 $5.300 $5.000 $5.050 $2.800
ELIM EXT PAV MRK & MRKS (4")
LF 24,346.000 $1.000 $0.381 $0.660 $0.460 $1.010 $0.370
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 3.000 $4,623.590 $8,394.500 $8,750.000 $8,300.000 $8,566.000 $5,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 9.000 $7,928.160 $10,700.000 $60.000 $27,100.000 $7,641.390 $10,500.000
TMA (STATIONARY)
DAY 1,029.000 $250.000 $85.600 $150.000 $215.000 $254.710 $200.000
Totals: $35,483,857.061 $40,124,534.507 $41,116,725.610 $42,116,102.710 $42,299,005.978 $49,373,860.180