Show Job Controls
Bid Cobra

MAVERICK FM 481 (1590-03-015)

Items: 63

County: MAVERICK
Length: N/A
Highway: FM 481
District: LAREDO
Control Number: 1590-03-015
DBE Goal: N/A
Project: STP 2022(661)HES
Guaranty: N/A
Time: 139 WORKING DAYS
Engineer's Estimate: $1,478,338.07
Date: 06/01/2022 (4 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
ANTONIO REYNA1
ALBERTO CHAVEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,478,338.07
$1,482,698.93
Over/Under Est: 0.29% $4,360.86
Over/Under Est: 21.44% $316,895.55
Amt Left: 21.08% $312,534.69
$2,123,469.53
Over/Under Est: 43.64% $645,131.46
Amt Left: 43.22% $640,770.60
Delta: -18.28% -$328,235.91
$2,134,908.92
Over/Under Est: 44.41% $656,570.85
Amt Left: 43.99% $652,209.99
Delta: -0.54% -$11,439.39

Bid Items & Bid Tabulations

63 Total 0 of 63
MAVERICK  |  FM 481  |  LAREDO  |  1590-03-015  |  06/01/2022  |  $1,478,338.07  |  STP 2022(661)HES  |  WIDEN ROAD - ADD SHOULDERS  |  139 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BRANNAN PAVING CO., LTD.
HUNTER INDUSTRIES, LTD.
VECTOR UTILITIES LLC
CK NEWBERRY, LLC
PREPARING ROW
STA 106.480 $750.000 $365.000 $889.120 $501.290 $500.000
EXCAVATION (ROADWAY)
CY 2,837.000 $12.000 $10.960 $13.680 $41.740 $15.000
SUBGRADE WIDENING (DENS CONT)
STA 106.480 $930.000 $650.350 $1,278.720 $662.130 $400.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 1,537.000 $16.000 $11.620 $13.680 $71.240 $22.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 10.100 $760.000 $1,000.000 $1,454.000 $1,432.610 $1,000.000
DRILL SEEDING (TEMP) (WARM)
AC 10.100 $525.000 $1,000.000 $965.000 $1,432.610 $500.000
PROOF ROLLING
HR 5.000 $120.000 $65.000 $105.300 $91.410 $75.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 3,102.000 $75.000 $74.030 $75.600 $98.800 $80.000
PRIME COAT (MC-30)
GAL 3,407.000 $5.000 $9.400 $5.260 $13.640 $7.000
ASPH (AC-15P)
GAL 27,259.000 $3.700 $4.960 $4.930 $7.500 $5.000
AGGR(TY-PB GR-3 SAC-B)
CY 404.000 $125.000 $94.900 $100.580 $163.730 $135.000
AGGR(TY-PB GR-4 SAC-B)
CY 334.000 $120.000 $94.900 $101.180 $163.730 $150.000
FLOWABLE BACKFILL
CY 6.000 $171.000 $500.000 $551.260 $700.370 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 32.000 $525.000 $531.210 $937.140 $859.560 $650.000
CLEANING AND SEALING EXISTING JOINTS
LF 240.000 $40.000 $46.330 $69.330 $62.690 $45.000
RETROFIT RAIL (TY T631)
LF 410.000 $80.000 $85.330 $110.500 $122.790 $100.000
RC PIPE (CL III)(24 IN)
LF 100.000 $95.000 $150.000 $165.380 $123.750 $130.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 4.000 $8,250.000 $9,000.000 $9,922.630 $19,582.200 $17,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 8.000 $10,000.000 $10,500.000 $11,576.410 $10,135.610 $12,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,250.000 $1,200.000 $1,323.020 $1,702.720 $4,200.000
CLEAN EXIST CULVERTS
EA 4.000 $2,100.000 $2,000.000 $2,205.030 $2,953.660 $2,500.000
REMOV STR (SET)
EA 4.000 $560.000 $1,250.000 $1,378.140 $1,258.790 $1,500.000
REMOV STR (WINGWALL)
EA 4.000 $1,900.000 $2,500.000 $2,756.290 $3,228.730 $4,000.000
REMOV STR (PIPE)
LF 90.000 $15.000 $50.000 $55.130 $30.630 $35.000
MOBILIZATION
LS 1.000 $117,211.220 $151,688.000 $174,691.220 $148,642.860 $493,954.420
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $8,000.000 $5,751.000 $3,502.640 $2,728.780 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 388.000 $62.000 $58.000 $101.500 $81.860 $60.000
ROCK FILTER DAMS (REMOVE)
LF 388.000 $16.000 $15.000 $28.200 $21.830 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $20.000 $85.000 $25.050 $54.580 $10.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $8.000 $55.000 $10.000 $13.640 $5.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 58.000 $86.000 $65.000 $117.000 $106.890 $100.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,282.000 $3.000 $4.300 $4.250 $5.940 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,282.000 $1.000 $1.000 $1.000 $1.710 $1.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 1,120.000 $80.000 $50.000 $117.000 $105.060 $150.000
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 570.000 $60.000 $49.810 $48.000 $51.630 $70.000
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 570.000 $10.000 $9.640 $36.000 $9.890 $15.000
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 570.000 $14.000 $22.790 $32.000 $5.110 $45.000
DRIVEWAYS (ACP)
SY 902.000 $50.000 $27.740 $36.000 $81.860 $25.000
MTL W-BEAM GD FEN (TIM POST)
LF 650.000 $30.000 $28.790 $39.250 $40.930 $34.000
REMOVE METAL BEAM GUARD FENCE
LF 850.000 $5.330 $2.630 $3.500 $3.410 $3.000
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $300.000 $452.430 $250.000 $286.520 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,714.610 $3,875.000 $4,311.470 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $566.000 $268.000 $250.000 $286.520 $500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,200.000 $1,750.000 $1,575.000 $552.440 $3,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $800.000 $2,750.000 $1,575.000 $492.290 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $9,000.000 $8,585.000 $9,825.000 $7,124.300 $10,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 10.000 $650.000 $765.000 $765.000 $1,091.510 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $800.000 $850.000 $850.000 $1,227.950 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $1,100.000 $1,250.000 $1,250.000 $1,773.700 $1,200.000
REMOVE SM RD SN SUP&AM
EA 14.000 $89.000 $140.000 $140.000 $218.300 $250.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 30.000 $28.000 $30.000 $30.000 $54.580 $115.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 8.000 $24.000 $10.000 $10.000 $16.370 $60.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 8.000 $120.000 $65.000 $65.000 $90.050 $175.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,093.000 $1.000 $1.750 $1.590 $16.370 $1.000
PAVEMENT SEALER 4"
LF 40,625.000 $0.150 $0.220 $0.300 $0.450 $0.500
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 21,120.000 $0.480 $0.800 $0.770 $1.090 $1.000
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 644.000 $0.490 $0.950 $1.500 $2.730 $1.250
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 17,937.000 $0.520 $0.800 $0.770 $1.360 $1.000
REFL PAV MRKR TY II-A-A
EA 259.000 $5.000 $4.800 $10.000 $15.010 $7.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $23,000.000 $10,000.000 $27,287.750 $7,500.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 924.000 $10.000 $8.800 $13.000 $18.010 $8.000
TMA (STATIONARY)
DAY 142.000 $200.000 $200.000 $350.000 $177.370 $250.000
TMA (MOBILE OPERATION)
HR 136.000 $85.000 $100.000 $150.000 $94.540 $25.000
Totals: $1,478,338.070 $1,482,698.938 $1,795,233.633 $2,123,469.544 $2,134,908.920