Show Job Controls
Bid Cobra

MAVERICK US 277 (0299-04-068)

Items: 55

County: MAVERICK
Length: N/A
Highway: US 277
District: LAREDO
Control Number: 0299-04-068
DBE Goal: N/A
Project: NH 2017(794)
Guaranty: N/A
Time: 97 WORKING DAYS
Engineer's Estimate: $7,611,638.04
Date: 03/08/2017 (9 years ago)
Contract Number: N/A
Type: ACP OVERLAY AND PAV MRKS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$7,611,638.04
$6,593,233.70
Over/Under Est: -13.38% -$1,018,404.34
$6,666,666.66
Over/Under Est: -12.41% -$944,971.38
Amt Left: 1.11% $73,432.96
Over/Under Est: -4.88% -$371,363.69
Amt Left: 9.81% $647,040.65
Delta: -8.60% -$573,607.69
Over/Under Est: -4.38% -$333,631.54
Amt Left: 10.39% $684,772.80
Delta: -0.52% -$37,732.15

Bid Items & Bid Tabulations

55 Total 0 of 55
MAVERICK  |  US 277  |  LAREDO  |  0299-04-068  |  03/08/2017  |  $7,611,638.04  |  NH 2017(794)  |  ACP OVERLAY AND PAV MRKS  |  97 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
H. L. ZUMWALT CONSTRUCTION, INC.
IOC COMPANY, LLC
HUNTER INDUSTRIES, LTD.
ANDERSON COLUMBIA CO., INC.
REMOVING CONC (DRIVEWAYS)
SY 287.000 $13.500 $25.000 $20.000 $20.000 $10.000
REMOVING CONCRETE(MOW STRIP)
LF 2,084.000 $8.500 $10.000 $4.000 $7.500 $9.000
EXCAVATION (CHANNEL)
CY 162.000 $11.000 $15.000 $15.000 $29.970 $27.000
BLADING
HR 80.000 $150.000 $60.000 $100.000 $85.500 $140.000
ASPH (AC-15P)
GAL 15,531.000 $3.000 $2.500 $2.250 $2.570 $2.500
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 374.000 $75.000 $70.000 $75.000 $69.030 $110.000
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 6,180.000 $80.000 $70.000 $70.000 $67.590 $79.000
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
TON 61,777.000 $75.000 $64.500 $65.000 $73.530 $75.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 13,610.000 $35.000 $25.600 $38.000 $24.730 $33.000
PLANE ASPH CONC PAV(0" TO 2")
SY 40,151.000 $1.500 $1.100 $0.750 $1.430 $1.500
PLANE ASPH CONC PAV (2")
SY 46,532.000 $1.500 $1.100 $1.000 $1.430 $1.400
FLOWABLE BACKFILL
CY 27.000 $130.000 $185.000 $285.000 $183.750 $180.000
RIPRAP (CONC)(4 IN)
CY 189.000 $425.000 $540.000 $335.000 $540.740 $390.000
RIPRAP (MOW STRIP)(4 IN)
CY 148.000 $400.000 $441.000 $330.000 $440.990 $415.000
RETROFIT RAIL (TY T631)
LF 400.000 $80.000 $64.000 $65.000 $193.860 $62.000
RC PIPE (ARCH)(CL IV)(DES 3)
LF 43.000 $100.000 $289.000 $150.000 $288.740 $200.000
RC PIPE (ARCH)(CL IV)(DES 4)
LF 19.000 $200.000 $436.000 $210.000 $435.740 $250.000
RC PIPE (ARCH)(CL V)(DES 2)
LF 90.000 $200.000 $341.000 $200.000 $341.240 $200.000
RC PIPE (ARCH)(CL V)(DES 3)
LF 14.000 $200.000 $368.000 $240.000 $367.490 $210.000
SET (TY II) (DES 2) (RCP) (6: 1) (P)
EA 8.000 $1,000.000 $2,889.000 $1,300.000 $2,887.430 $2,500.000
SET (TY II) (DES 3) (RCP) (6: 1) (P)
EA 4.000 $1,000.000 $3,150.000 $1,400.000 $3,149.920 $2,600.000
SET (TY II) (DES 4) (RCP) (6: 1) (P)
EA 2.000 $1,200.000 $3,413.000 $3,000.000 $3,412.420 $3,700.000
SET (TY II) (DES 5) (RCP) (6: 1) (P)
EA 2.000 $1,200.000 $3,938.000 $4,400.000 $3,937.400 $4,500.000
REMOV STR (DRIVEWAY CULVERT)
EA 3.000 $500.000 $1,575.000 $470.000 $1,574.960 $750.000
MOBILIZATION
LS 1.000 $616,321.460 $400,000.000 $491,969.240 $515,181.120 $407,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $3,500.000 $7,000.000 $5,000.000 $2,163.430 $2,500.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 185.000 $110.000 $100.000 $150.000 $79.800 $200.000
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 1,260.000 $45.000 $40.000 $65.000 $20.000 $34.000
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 6,300.000 $16.000 $15.000 $13.500 $20.000 $15.000
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 1,260.000 $30.000 $20.000 $15.500 $20.000 $16.000
DRIVEWAYS (CONC)
SY 306.000 $90.000 $84.000 $60.000 $84.000 $81.000
MTL W-BEAM GD FEN (TIM POST)
LF 9,734.000 $18.000 $23.400 $16.000 $18.750 $16.000
MTL W-BEAM GD FEN (STEEL POST)
LF 263.500 $80.000 $80.000 $60.000 $47.000 $57.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,450.000 $1,688.000 $1,500.000 $1,885.000 $1,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 34.000 $1,020.000 $916.000 $870.000 $850.000 $900.000
REMOVE METAL BEAM GUARD FENCE
LF 9,735.000 $2.250 $0.900 $1.000 $1.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 36.000 $180.000 $84.000 $200.000 $150.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 40.000 $2,150.000 $2,490.000 $1,900.000 $2,160.000 $1,900.000
GUARDRAIL END TREATMENT (REMOVE)
EA 36.000 $225.000 $80.000 $200.000 $270.000 $200.000
CRASH CUSH ATTEN (INSTL)
EA 4.000 $10,000.000 $8,000.000 $8,500.000 $7,100.000 $7,775.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 22.000 $1,800.000 $910.000 $1,000.000 $1,185.000 $880.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $800.000 $105.000 $500.000 $890.000 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 7,586.000 $1.150 $1.250 $1.000 $1.580 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 14,471.000 $1.000 $1.250 $1.000 $1.580 $1.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 7,430.000 $0.750 $0.660 $0.630 $0.630 $0.650
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 5,103.000 $5.250 $5.250 $5.000 $5.000 $5.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 136.000 $110.000 $87.000 $83.000 $83.000 $85.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 39.000 $125.000 $96.000 $91.000 $91.000 $92.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 25,278.000 $0.330 $0.300 $0.280 $0.280 $0.300
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 156,118.000 $0.280 $0.300 $0.280 $0.280 $0.300
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 27,238.000 $0.300 $0.300 $0.280 $0.280 $0.300
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 125,860.000 $0.300 $0.300 $0.280 $0.280 $0.300
REFL PAV MRKR TY I-C
EA 1,268.000 $3.250 $2.950 $2.800 $2.800 $3.000
REFL PAV MRKR TY II-A-A
EA 2,946.000 $3.250 $2.950 $2.800 $2.800 $3.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $9,800.000 $8,000.000 $10,000.000 $7,575.490 $7,000.000
Totals: $7,611,638.040 $6,593,233.700 $6,666,666.660 $7,240,274.350 $7,278,006.500