Show Job Controls
Bid Cobra

MAVERICK US 57 (0276-02-031)

Items: 67

County: MAVERICK
Length: 18.6270 MILES
Highway: US 57
District: LAREDO
Control Number: 0276-02-031
DBE Goal: 0.0%
Project: C 276-2-31
Guaranty: $100,000.00
Time: 164 WORKING DAYS
Engineer's Estimate: $17,716,135.45
Date: 03/05/2025 (1 year ago)
Contract Number: 3253206
Type: RESURFACE ROADWAY
Project ID: A00209380
Project Description: RESURFACE OF EXISTING ROADWAY OVERLAY, SPOT BASE REPAIR, MGBF, AND PAVEMENT MARKING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
VANESSA HERRERA
MISAEL AGUILAR
ANGEL MARTINEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$17,716,135.45
$16,867,638.34
Over/Under Est: -4.79% -$848,497.11
$17,801,645.58
Over/Under Est: 0.48% $85,510.13
Amt Left: 5.54% $934,007.24
Subcontractor Percentage Amount
ANTS CONTRACTORS LLC 0.00% $0.00
HIGHWAY BARRICADES AND SERVICES, LLC 0.00% $0.00
MPB, INC. 0.00% $0.00
RPV CONSTRUCTION, LLC 0.00% $0.00
TRP CONSTRUCTION GROUP, LLC 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

67 Total 0 of 67
MAVERICK  |  US 57  |  LAREDO  |  0276-02-031  |  03/05/2025  |  $17,716,135.45  |  C 276-2-31  |  RESURF ROADWAY  |  164 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CK NEWBERRY, LLC
HUNTER INDUSTRIES, LTD.
REMOV CONC (MOWSTRIP)
CY 942.000 $100.000 $100.000 $240.120
REMOV CONC (RIPRAP)
SY 459.000 $38.500 $40.000 $20.000
REMOV CONC (CURB)
LF 674.000 $7.000 $10.000 $14.000
REMOV CONC (SAWCUT)
LF 110.000 $26.000 $40.000 $18.000
BACKFILL (TY A)
STA 935.630 $220.000 $100.000 $133.310
FOG SEAL (CSS-1H)
GAL 134.000 $5.750 $20.000 $13.800
D-GR HMA TY-C SAC-A PG76-22
TON 59,867.000 $135.000 $133.250 $131.300
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 4,165.000 $80.000 $135.000 $113.360
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 95,805.000 $45.000 $37.000 $38.740
PLANE ASPH CONC PAV(2")
SY 133,415.000 $3.000 $1.000 $3.200
RIPRAP (MOW STRIP)(4 IN)
CY 972.000 $400.000 $625.000 $884.750
CLEANING AND SEALING EXISTING JOINTS
LF 376.000 $25.000 $115.000 $124.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 92.000 $25.000 $115.000 $124.220
RETROFIT RAIL (TY T631)
LF 50.000 $90.000 $110.000 $168.000
RETROFIT RAIL (ADD HSS)
LF 672.000 $120.000 $100.000 $135.670
MOBILIZATION
LS 1.000 $1,603,603.000 $1,600,000.000 $1,775,512.660
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $8,500.000 $6,000.000 $3,969.340
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $20,000.000 $10,130.110
TMA (STATIONARY)
DAY 174.000 $260.000 $325.000 $487.290
TMA (MOBILE OPERATION)
HR 82.000 $60.000 $50.000 $95.630
ONE-WAY TRAF CONT (PILOT CAR)
HR 1,104.000 $150.000 $150.000 $158.380
CONC CURB (TY II)
LF 110.000 $47.000 $45.000 $57.000
CONC CURB (MONO) (TY II)
LF 320.000 $50.000 $35.000 $65.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 135,499.200 $0.250 $0.100 $0.160
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 67,749.600 $0.250 $0.200 $0.140
MTL W-BEAM GD FEN (TIM POST)
LF 19,400.000 $27.000 $24.000 $29.470
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 48.000 $1,800.000 $2,500.000 $3,334.170
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 13.000 $1,250.000 $1,300.000 $1,400.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $1,075.000 $1,500.000 $1,600.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 4.000 $800.000 $625.000 $1,055.000
REMOVE METAL BEAM GUARD FENCE
LF 19,400.000 $2.500 $2.000 $2.150
REMOVE TERMINAL ANCHOR SECTION
EA 13.000 $180.000 $225.000 $240.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 48.000 $150.000 $225.000 $277.500
GUARDRAIL END TREATMENT (INSTALL)
EA 67.000 $3,200.000 $3,000.000 $3,350.750
GUARDRAIL END TREATMENT (REMOVE)
EA 67.000 $260.000 $225.000 $345.520
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 85.000 $21.000 $40.000 $28.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 206.000 $27.000 $40.000 $48.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 45.000 $125.000 $40.000 $44.500
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 9.000 $18.000 $40.000 $28.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 19.000 $23.000 $40.000 $48.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 315.000 $21.000 $30.000 $20.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 8,042.000 $2.000 $2.000 $2.110
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,935.000 $2.000 $2.000 $1.710
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 748.000 $2.000 $0.750 $0.660
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 104.000 $1.350 $1.200 $1.130
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,088.000 $1.500 $1.000 $0.950
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 120.000 $5.000 $3.000 $3.300
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,145.000 $12.000 $16.000 $17.960
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 43.000 $200.000 $150.000 $162.210
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 33.000 $200.000 $250.000 $271.970
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 6,870.000 $1.230 $2.000 $2.180
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 5,340.000 $1.480 $2.000 $2.180
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
LF 490.000 $1.390 $4.000 $4.500
PAVEMENT SLER 6"
LF 15,553.000 $0.300 $0.500 $0.400
PAVEMENT SLER 8"
LF 320.000 $0.600 $1.000 $1.100
PAVEMENT SLER 24"
LF 250.000 $4.100 $3.000 $3.300
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 9,168.000 $0.600 $0.750 $0.690
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 194,823.000 $0.750 $0.750 $0.670
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 12,169.000 $0.600 $0.900 $0.940
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 143,146.000 $0.750 $0.650 $0.670
REFL PAV MRKR TY I-C
EA 1,460.000 $5.000 $5.000 $5.150
REFL PAV MRKR TY II-A-A
EA 3,579.000 $6.000 $5.000 $5.160
ELIM EXT PM & MRKS (4")
LF 15,553.000 $1.000 $0.400 $0.400
ELIM EXT PM & MRKS (8")
LF 320.000 $2.000 $0.600 $0.700
ELIM EXT PM & MRKS (24")
LF 250.000 $3.600 $0.400 $4.500
BONDING COURSE
GAL 105,570.000 $4.000 $4.000 $2.830
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $9,500.000 $12,000.000 $10,130.110
Totals: $17,716,135.450 $16,867,638.340 $17,801,645.581
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $50,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $193,091.36
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $1,000.00
Total: $244,091.36