MATAGORDA FM 1301 (1412-01-022)

Items: 129

County: MATAGORDA
Length: 5.5610 MILES
Highway: FM 1301
District: YOAKUM
Control Number: 1412-01-022
DBE Goal: 0.0%
Project: C 1412-1-22
Guaranty: $100,000.00
Time: 205 WORKING DAYS
Engineer's Estimate: $6,940,691.05
Date: 03/04/2025 (1 year ago)
Contract Number: 3253012
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00124556
Project Description: ADD SHOULDERS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
RYAN SIMPER
PAUL RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$6,940,691.05
$7,126,058.17
Over/Under Est: 2.67% $185,367.12
Over/Under Est: 3.06% $212,159.78
Amt Left: 0.38% $26,792.66
Over/Under Est: 12.87% $893,551.18
Amt Left: 9.94% $708,184.06
Delta: -9.53% -$681,391.40
$8,497,681.92
Over/Under Est: 22.43% $1,556,990.87
Amt Left: 19.25% $1,371,623.75
Delta: -8.47% -$663,439.69
Over/Under Est: 38.42% $2,666,694.41
Amt Left: 34.82% $2,481,327.29
Delta: -13.06% -$1,109,703.54
Over/Under Est: 62.05% $4,307,001.44
Amt Left: 57.84% $4,121,634.32
Delta: -17.07% -$1,640,307.03
Subcontractor Percentage Amount
STAFF CONCRETE CONSTRUCTION 16.48% $1,174,374.39
INTERSTATE BARRICADES & MARKINGS, INC. 2.94% $209,506.11
DEPENDABLE FENCE 1.74% $123,993.41
LONE STAR EROSION CONTROL 1.29% $91,926.15
THIRD COAST SERVICES LLC 1.02% $72,685.79
MURRAY CONSTRUCTION 0.58% $41,331.14
4E TREE WORX LLC 0.32% $22,803.39
Total: 24.37% $1,736,620.38

Bid Items & Bid Tabulations

129 Total 0 of 129
MATAGORDA  |  FM 1301  |  YOAKUM  |  1412-01-022  |  03/04/2025  |  $6,940,691.05  |  C 1412-1-22  |  SURF/ROADWAY RESTOR  |  205 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CLARK CONSTRUCTION OF TEXAS, INC.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
HUNTER INDUSTRIES, LTD.
CK NEWBERRY, LLC
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
STERLING DELAWARE HOLDING COMPANY
PREPARING ROW
STA 50.000 $5,000.000 $460.000 $500.000 $976.800 $500.000 $460.000 $14,566.000
REMOV CONC (RIPRAP)
SY 56.000 $30.000 $26.800 $50.000 $36.300 $60.000 $50.000 $25.000
EXCAV (ROADWAY)
CY 9,569.000 $15.000 $13.870 $16.800 $18.700 $18.000 $52.000 $35.000
EMBANK (FNL)(OC)(TY C)
CY 6,540.000 $18.000 $13.860 $12.150 $18.700 $18.000 $33.000 $41.000
BLADING
HR 20.000 $120.000 $150.000 $150.000 $88.000 $150.000 $140.000 $245.000
BROADCAST SEED (TEMP_WARM)
SY 385.000 $0.250 $2.800 $1.000 $0.250 $0.300 $0.250 $2.800
BROADCAST SEED (TEMP_COOL)
SY 385.000 $0.250 $3.400 $1.000 $0.250 $0.300 $0.250 $3.400
DRILL SEED (PERM_RURAL_CLAY)
SY 65,144.000 $0.350 $0.260 $0.400 $0.300 $0.300 $0.300 $0.260
DRILL SEED (TEMP_WARM)
SY 16,287.000 $0.350 $0.180 $0.350 $0.300 $0.300 $0.300 $0.180
DRILL SEED (TEMP_COOL)
SY 16,287.000 $0.350 $0.220 $0.350 $0.250 $0.300 $0.250 $0.220
VEGETATIVE WATERING
TGL 560.300 $20.000 $30.000 $10.000 $20.900 $30.000 $30.000 $46.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 27,366.000 $84.000 $112.590 $121.500 $113.190 $125.000 $137.250 $110.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 18.000 $200.000 $1,000.000 $350.000 $385.000 $375.000 $369.600 $385.000
LIME TRT (EXIST MATL)(8")
SY 1,500.000 $5.000 $9.630 $10.000 $8.800 $10.000 $15.000 $31.000
CEMENT
TON 1,575.000 $220.000 $225.000 $210.000 $220.000 $225.000 $203.000 $210.000
CEMENT TRT (EXIST MATL)(8")
SY 129,634.000 $2.500 $1.780 $1.300 $3.300 $2.500 $2.750 $15.000
ASPH (RC-250)
GAL 23,332.000 $4.500 $3.650 $5.100 $4.890 $4.300 $4.000 $6.000
AGGR (TY-E, GR-5)(SAC-B)
CY 833.000 $130.000 $107.550 $140.250 $111.350 $160.000 $223.000 $122.000
AGGR (TY-PE, GR-3)(SAC-B)
CY 1,372.000 $135.000 $122.260 $141.000 $145.160 $150.000 $148.000 $181.000
AGGR (TY-PE, GR-4)(SAC-B)
CY 898.000 $140.000 $140.230 $135.000 $143.800 $145.000 $203.000 $181.000
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
GAL 86,328.000 $4.250 $3.610 $4.150 $4.180 $4.000 $3.960 $5.250
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,000.000 $64.000 $37.140 $39.000 $124.740 $80.000 $90.500 $68.000
CUT AND RESTORE PAV (FLEX BASE)
SY 21.000 $26.000 $44.000 $50.000 $54.000 $300.000 $50.000 $190.480
CEM STABIL BKFL
CY 42.000 $220.000 $140.000 $250.000 $270.000 $275.000 $250.000 $476.190
TEMPORARY SPL SHORING
SF 180.000 $35.000 $30.000 $50.000 $70.200 $70.000 $65.000 $65.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 32.000 $450.000 $254.560 $255.000 $254.560 $300.000 $254.560 $254.560
RIPRAP (CONC)(5 IN)
CY 51.900 $675.000 $583.330 $900.000 $1,080.010 $750.000 $1,000.000 $1,000.000
RIPRAP (MOW STRIP)(5 IN)
CY 59.200 $500.000 $551.000 $900.000 $1,296.010 $650.000 $1,200.000 $1,400.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 62.000 $144.000 $227.000 $150.000 $178.200 $350.000 $165.000 $340.000
RETROFIT RAIL (TY T131RC)
LF 242.660 $250.000 $251.250 $300.000 $293.610 $200.000 $210.600 $210.600
CMP (GAL STL 18 IN)
LF 80.000 $85.000 $82.880 $60.000 $64.800 $120.000 $60.000 $60.000
CMP (GAL STL 24 IN)
LF 24.000 $115.000 $118.330 $145.000 $156.600 $135.000 $145.000 $145.000
CMP (GAL STL 30 IN)
LF 36.000 $175.000 $124.300 $185.000 $199.800 $150.000 $185.000 $185.000
CMP (GAL STL 36 IN)
LF 12.000 $200.000 $210.000 $200.000 $216.000 $160.000 $200.000 $200.000
CONC BOX CULV (3 FT X 3 FT)
LF 12.000 $330.000 $811.700 $700.000 $756.010 $975.000 $700.000 $1,400.550
CONC BOX CULV (5 FT X 2 FT)
LF 13.000 $550.000 $1,074.000 $800.000 $864.010 $1,300.000 $800.000 $1,939.200
CONC BOX CULV (6 FT X 3 FT)
LF 10.000 $675.000 $1,211.500 $825.000 $891.010 $1,700.000 $825.000 $2,601.400
CONC BOX CULV (6 FT X 4 FT)
LF 31.000 $725.000 $1,002.000 $900.000 $999.010 $1,725.000 $925.000 $2,604.260
CONC BOX CULV (6 FT X 6 FT)
LF 12.000 $800.000 $1,562.000 $1,000.000 $1,080.010 $2,500.000 $1,000.000 $2,771.960
CONC BOX CULV (7 FT X 4 FT)
LF 8.000 $810.000 $1,476.000 $1,200.000 $1,296.010 $2,500.000 $1,200.000 $1,653.290
RC PIPE (CL III)(15 IN)
LF 120.000 $95.000 $152.600 $60.000 $64.800 $130.000 $60.000 $60.000
RC PIPE (CL III)(18 IN)
LF 224.000 $105.000 $209.000 $65.000 $75.600 $150.000 $70.000 $70.000
RC PIPE (CL III)(24 IN)
LF 148.000 $120.000 $236.750 $150.000 $172.800 $150.000 $160.000 $160.000
RC PIPE (CL III)(30 IN)
LF 40.000 $155.000 $284.800 $225.000 $243.000 $350.000 $225.000 $225.000
RC PIPE (CL III)(36 IN)
LF 24.000 $275.000 $444.000 $300.000 $270.000 $600.000 $250.000 $250.000
RC PIPE (CL III)(48 IN)
LF 44.000 $300.000 $561.600 $350.000 $378.000 $400.000 $350.000 $350.000
SET (TY I)(S= 3 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $6,500.000 $10,000.000 $7,000.000 $8,100.090 $14,000.000 $7,500.000 $9,700.480
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1)(C)
EA 4.000 $7,100.000 $7,872.000 $8,000.000 $9,180.100 $6,000.000 $8,500.000 $9,177.110
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1)(C)
EA 4.000 $8,750.000 $9,028.000 $10,000.000 $10,800.120 $10,000.000 $10,000.000 $11,431.600
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1)(C)
EA 4.000 $9,100.000 $9,193.000 $12,000.000 $12,960.140 $12,000.000 $12,000.000 $13,510.960
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1)(C)
EA 4.000 $9,250.000 $12,161.000 $13,000.000 $14,040.150 $15,000.000 $13,000.000 $15,147.810
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1)(C)
EA 6.000 $14,000.000 $11,044.000 $14,000.000 $16,200.170 $14,000.000 $15,000.000 $17,395.590
SET (TY I)(S= 7 FT)(HW= 5 FT)(3:1)(C)
EA 4.000 $15,500.000 $10,800.000 $15,000.000 $17,280.180 $15,000.000 $16,000.000 $17,803.280
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 14.000 $1,300.000 $1,861.000 $850.000 $972.010 $2,500.000 $900.000 $900.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 14.000 $1,550.000 $1,635.000 $900.000 $1,080.010 $2,400.000 $1,000.000 $1,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 46.000 $1,650.000 $2,137.000 $900.000 $1,080.010 $2,800.000 $1,000.000 $1,000.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 4.000 $2,000.000 $1,914.000 $2,500.000 $2,700.030 $2,500.000 $2,500.000 $2,500.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $2,300.000 $2,255.000 $2,000.000 $2,160.020 $2,600.000 $2,000.000 $2,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $2,500.000 $2,790.000 $2,000.000 $2,160.020 $3,100.000 $2,000.000 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 34.000 $2,400.000 $2,534.000 $2,500.000 $2,700.030 $3,100.000 $2,500.000 $2,500.000
SET (TY II) (30 IN) (CMP) (6: 1) (P)
EA 4.000 $3,300.000 $2,928.000 $3,500.000 $3,780.040 $3,900.000 $3,500.000 $3,500.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $3,600.000 $2,906.000 $3,000.000 $3,240.030 $4,000.000 $3,000.000 $3,000.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 12.000 $4,000.000 $3,677.000 $3,500.000 $3,780.040 $4,600.000 $3,500.000 $3,500.000
SET (TY II) (36 IN) (CMP) (6: 1) (P)
EA 2.000 $4,500.000 $3,500.000 $4,500.000 $4,860.050 $5,800.000 $4,500.000 $4,500.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 18.000 $4,900.000 $4,037.000 $4,000.000 $4,320.050 $4,800.000 $4,000.000 $4,000.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 4.000 $5,000.000 $5,069.000 $4,500.000 $4,860.050 $5,400.000 $4,500.000 $4,500.000
SET (TY II) (48 IN) (RCP) (4: 1) (C)
EA 6.000 $6,500.000 $8,729.000 $6,000.000 $7,020.070 $8,500.000 $6,500.000 $6,500.000
SET (TY II) (48 IN) (RCP) (6: 1) (P)
EA 2.000 $7,200.000 $11,738.000 $7,000.000 $8,100.090 $10,000.000 $7,500.000 $7,500.000
REMOV STR (SMALL)
EA 4.000 $1,500.000 $600.000 $750.000 $1,296.010 $2,000.000 $1,200.000 $1,200.000
MOBILIZATION
LS 1.000 $623,000.000 $429,600.000 $310,000.000 $717,990.810 $825,000.000 $959,000.000 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $6,500.000 $2,869.000 $5,000.000 $1,802.080 $15,000.000 $25,000.000 $26,820.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $18,000.000 $20,000.000 $10,765.460 $18,927.010 $17,000.000 $10,000.000
TMA (STATIONARY)
DAY 10.000 $400.000 $200.000 $125.000 $318.260 $100.000 $240.000 $180.000
TMA (MOBILE OPERATION)
DAY 20.000 $500.000 $750.000 $125.000 $385.370 $100.000 $240.000 $395.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 950.000 $45.000 $45.000 $38.000 $45.000 $50.000 $45.000 $45.000
ROCK FILTER DAMS (REMOVE)
LF 950.000 $10.000 $6.000 $12.000 $20.000 $11.000 $20.000 $6.000
SANDBAGS FOR EROSION CONTROL
EA 100.000 $10.000 $10.000 $20.000 $3.000 $32.000 $3.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 400.000 $4.500 $7.250 $6.000 $3.500 $11.000 $3.500 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 400.000 $1.000 $0.900 $1.500 $2.000 $3.000 $2.000 $0.900
DRIVEWAYS (SURF TREAT)
SY 3,410.000 $45.000 $41.800 $40.500 $35.200 $35.000 $75.000 $33.000
TURNOUTS (SURF TREAT)
SY 134.000 $45.000 $181.850 $100.000 $35.200 $30.000 $400.000 $44.000
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $32.000 $28.350 $28.350 $31.330 $30.000 $23.750 $23.750
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,140.000 $2,140.000 $2,917.270 $2,200.000 $3,800.000 $1,858.000
SHORT RADIUS (28")
LF 25.000 $380.000 $35.400 $35.400 $39.120 $35.000 $54.000 $54.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $700.000 $1,090.000 $1,090.000 $1,204.480 $1,100.000 $952.000 $952.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,200.000 $3,150.000 $3,150.000 $3,480.830 $3,200.000 $3,096.000 $3,096.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 15.000 $325.000 $125.000 $175.000 $175.000 $175.000 $183.500 $183.500
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $390.000 $140.000 $225.000 $225.000 $225.000 $255.000 $255.000
CONDT (PVC) (SCH 40) (2")
LF 560.000 $17.000 $11.900 $11.900 $11.900 $12.000 $11.900 $11.900
CONDT (PVC) (SCH 80) (2") (BORE)
LF 30.000 $26.000 $16.160 $16.160 $16.160 $17.000 $16.160 $16.160
ELEC CONDR (NO.8) BARE
LF 710.000 $2.750 $1.490 $1.500 $1.490 $1.500 $1.490 $1.490
ELEC CONDR (NO.8) INSULATED
LF 308.000 $3.000 $1.570 $1.600 $1.570 $1.600 $1.570 $1.570
GROUND BOX TY A (122311)W/APRON
EA 2.000 $1,600.000 $888.980 $890.000 $888.980 $900.000 $888.980 $888.980
ZINC-COAT STL WIRE STRAND (3/16")
LF 120.000 $9.000 $4.520 $4.520 $4.520 $4.500 $4.520 $4.520
ZINC-COAT STL WIRE STRAND (5/16")
LF 248.000 $8.000 $1.500 $1.500 $1.500 $1.500 $1.500 $1.500
REMOVE ELECTRICAL SERVICES
EA 2.000 $1,000.000 $81.660 $82.000 $81.660 $82.000 $81.660 $81.660
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $8,200.000 $5,624.940 $5,625.000 $5,624.940 $5,800.000 $5,624.940 $5,624.940
ELC SRV TY T 120/240 000(NS)GS(N)SP(O)
EA 1.000 $7,900.000 $3,874.940 $3,875.000 $3,874.940 $4,000.000 $3,874.940 $3,874.940
ALUMINUM SIGNS (TY A)
SF 36.000 $65.000 $30.000 $25.050 $21.000 $21.000 $41.000 $41.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 11.000 $650.000 $750.000 $775.000 $775.000 $775.000 $585.000 $585.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $700.000 $850.000 $910.000 $910.000 $910.000 $678.000 $678.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $830.000 $850.000 $1,055.000 $1,055.000 $1,055.000 $715.000 $715.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $900.000 $925.000 $1,075.000 $1,075.000 $1,075.000 $755.000 $755.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 26.000 $450.000 $535.000 $490.000 $490.000 $500.000 $275.000 $275.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 2.000 $475.000 $550.000 $630.000 $630.000 $650.000 $313.000 $313.000
REMOVE SM RD SN SUP&AM
EA 48.000 $100.000 $100.000 $90.000 $90.000 $100.000 $71.000 $71.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
EA 10.000 $55.000 $28.000 $22.500 $22.500 $23.000 $14.000 $14.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $55.000 $32.000 $28.500 $28.500 $29.000 $22.000 $22.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 30.000 $95.000 $75.000 $73.500 $73.500 $8.000 $168.000 $168.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 175,890.000 $0.350 $0.300 $0.290 $0.290 $0.300 $0.410 $0.300
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 16,740.000 $0.350 $0.300 $0.290 $0.290 $0.300 $0.450 $0.350
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 78,204.000 $0.350 $0.300 $0.290 $0.290 $0.300 $0.410 $0.300
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,934.000 $3.000 $2.000 $1.000 $1.630 $1.000 $1.000 $0.500
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 58,630.000 $0.900 $1.010 $0.790 $0.790 $0.800 $1.100 $1.020
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 26,068.000 $0.900 $1.010 $0.790 $0.790 $0.800 $1.150 $1.020
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
LF 5,580.000 $0.900 $1.010 $0.790 $0.790 $0.800 $1.250 $1.020
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 1,000.000 $0.600 $1.100 $0.800 $0.800 $0.800 $1.000 $1.020
PREFAB PM TY C (W)(24")(SLD)
LF 236.000 $20.000 $15.000 $15.000 $15.000 $15.000 $16.000 $17.500
REFL PAV MRKR TY II-A-A
EA 605.000 $6.000 $7.000 $6.400 $6.400 $6.500 $6.000 $7.500
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $12,000.000 $2,376.930 $2,380.000 $2,376.930 $2,500.000 $2,376.930 $2,376.930
REMOVING TRAFFIC SIGNALS
EA 1.000 $6,500.000 $1,959.830 $1,960.000 $1,959.830 $2,000.000 $1,959.830 $1,959.830
VEH SIG SEC (12")LED(YEL)
EA 4.000 $220.000 $309.990 $310.000 $309.990 $325.000 $309.990 $309.990
VEH SIG SEC (12")LED(RED)
EA 6.000 $400.000 $378.740 $379.000 $378.740 $400.000 $378.740 $378.740
BACK PLATE (12")(1 SEC)(VENTED)ALUM
EA 6.000 $350.000 $114.160 $115.000 $114.160 $115.000 $114.160 $114.160
TRF SIG CBL (TY A)(10 AWG)(3 CONDR)
LF 713.000 $2.550 $1.930 $2.000 $1.930 $2.000 $1.930 $1.930
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 2.000 $5,500.000 $2,408.300 $2,410.000 $2,408.300 $2,500.000 $2,408.300 $2,408.300
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $805.000 $297.240 $298.000 $297.240 $300.000 $297.240 $297.240
INS TRF SIG PL AM (S)STR(TY D)LUM
EA 2.000 $10,830.000 $13,942.500 $13,950.000 $13,942.500 $14,000.000 $13,942.500 $13,942.500
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $7,750.000 $23,000.000 $10,000.000 $8,389.380 $10,000.000 $24,080.000 $14,200.000
Totals: $6,940,691.050 $7,126,058.162 $7,152,850.830 $7,834,242.234 $8,497,681.920 $9,607,385.456 $11,247,692.486
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $1,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $500.00
Total: $1,500.00