Show Job Controls
Bid Cobra

MATAGORDA FM 521 (0846-03-048)

Items: 59

County: MATAGORDA
Length: N/A
Highway: FM 521
District: YOAKUM
Control Number: 0846-03-048
DBE Goal: N/A
Project: BR 2B23(084)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $6,960,034.50
Date: 08/02/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
RYAN SIMPER
PAUL RODRIGUEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$6,960,034.50
$8,376,282.19
Over/Under Est: 20.35% $1,416,247.69
$10,478,529.99
Over/Under Est: 50.55% $3,518,495.49
Amt Left: 25.1% $2,102,247.80
Subcontractor Percentage Amount
K-C LEASE SERVICE, INC. 2.13% $133,846.69
TRAFFIC SIGNS & LINES, LLC 0.61% $38,331.68
HERMANOS STEEL, LLC 0.58% $36,446.52
DARKHORSE INDUSTRIES, L.L.C. 0.58% $36,446.52
A K FUQUAY CONSTRUCTION 0.48% $30,162.63
HEMPHILL WBE PILE DRIVING CO. 0.43% $27,020.69
HIGHWAY BARRICADES AND SERVICES, LLC 0.23% $14,452.93
TEX OP CONSTRUCTION, LP 0.15% $9,425.82
DUSTROL, INC. 0.13% $8,169.05
HOUSTON SAWING & DRILLING 0.11% $6,912.27
PRIMATE CONSTRUCTION, LP 0.09% $5,655.49
Total: 5.52% $346,870.29

Bid Items & Bid Tabulations

59 Total 0 of 59
MATAGORDA  |  FM 521  |  YOAKUM  |  0846-03-048  |  08/02/2023  |  $6,960,034.50  |  BR 2B23(084)  |  BRIDGE REPL  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
HUNTER INDUSTRIES, LTD.
PREPARING ROW
STA 4.000 $4,000.000 $103,500.000 $35,000.000
REMOVING STAB BASE AND ASPH PAV (2"-8")
SY 2,946.000 $20.000 $7.300 $21.000
EXCAVATION (ROADWAY)
CY 1,120.000 $20.000 $70.000 $94.000
EXCAVATION (CHANNEL)
CY 1,139.000 $22.000 $30.000 $94.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 1,875.000 $25.000 $30.000 $94.000
BLADING
HR 20.000 $150.000 $170.000 $156.000
FURNISHING AND PLACING TOPSOIL (4")
SY 6,923.000 $3.000 $1.250 $4.600
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 6,923.000 $1.000 $0.750 $0.750
CELL FBR MLCH SEED(TEMP)(WARM)
SY 1,731.000 $1.000 $1.000 $1.000
CELL FBR MLCH SEED(TEMP)(COOL)
SY 1,731.000 $1.000 $1.000 $1.000
VEGETATIVE WATERING
MG 233.500 $75.000 $65.000 $32.200
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 2,025.000 $3.000 $2.000 $2.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 1,076.000 $100.000 $135.000 $180.600
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 80.000 $295.000 $296.000 $440.000
LIME TRT (EXST MATL)(8")
SY 4,978.000 $5.000 $7.000 $9.600
ASPH (RC-250)
GAL 959.000 $7.500 $10.000 $10.300
AGGR(TY-E GR-5 SAC-B)
CY 36.000 $240.000 $240.000 $552.500
AGGR(TY-PE GR-3 SAC-B)
CY 58.000 $190.000 $240.000 $580.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 1,916.000 $5.000 $10.000 $10.300
CEM STABIL BKFL
CY 146.000 $200.000 $140.000 $250.560
PRESTR CONC PIL (18 IN SQ)
LF 900.000 $200.000 $110.000 $432.000
PRESTR CONC PIL (24 IN SQ)
LF 1,566.000 $220.000 $180.000 $652.850
CL C CONC (ABUT)
CY 56.600 $1,500.000 $940.000 $1,619.980
CL C CONC (CAP)
CY 103.300 $1,550.000 $1,600.000 $1,943.980
REINF CONC SLAB
SF 18,400.000 $25.000 $23.000 $37.610
PRESTR CONC GIRDER (TX28)
LF 2,382.000 $320.000 $185.000 $186.840
RIPRAP (STONE PROTECTION)(12 IN)
CY 643.000 $200.000 $215.000 $264.600
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,085.000 $195.000 $215.000 $264.600
RAIL (TY SSTR)
LF 848.000 $120.000 $77.000 $129.600
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 137.000 $185.000 $200.000 $162.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $115,000.000 $1,000,000.000 $593,994.200
MOBILIZATION
LS 1.000 $342,119.000 $620,000.000 $750,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $3,800.000 $8,000.000 $1,612.650
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 60.000 $50.000 $75.300 $75.300
ROCK FILTER DAMS (REMOVE)
LF 60.000 $15.000 $12.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,409.000 $4.000 $4.250 $4.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,409.000 $1.000 $0.750 $0.750
MTL W-BEAM GD FEN (TIM POST)
LF 462.500 $25.000 $30.400 $25.090
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,300.000 $2,780.000 $2,012.000
REMOVE METAL BEAM GUARD FENCE
LF 555.000 $4.000 $3.800 $2.500
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,300.000 $3,241.850 $3,086.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $433.550 $343.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 3.000 $550.000 $422.100 $910.000
REMOVE SM RD SN SUP&AM
EA 3.000 $100.000 $100.050 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 10.000 $80.000 $31.280 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 4.000 $35.000 $37.030 $20.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 4.000 $35.000 $55.430 $125.000
REFL PAV MRK TY II (W) 6" (SLD)
LF 800.000 $1.000 $0.220 $0.220
REFL PAV MRK TY II (Y) 6" (SLD)
LF 800.000 $1.000 $0.220 $0.220
REFL PAV MRKR TY II-A-A
EA 33.000 $6.000 $5.000 $5.000
PAV SURF PREP FOR MRK (6")
LF 1,600.000 $1.000 $0.100 $0.100
NO. OF WORKING DAYS
$/D 10,462.000 $280.000 $200.000 $280.000
D-GR HMA TY-B PG64-22
TON 1,034.000 $150.000 $200.000 $164.500
D-GR HMA TY-D SAC-B PG70-22
TON 496.000 $160.000 $200.000 $235.400
TACK COAT
GAL 920.000 $5.000 $10.000 $18.800
TEMP CONSTRUCTION ACCESS
LS 1.000 $300,000.000 $1,300,000.000 $1,298,996.740
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $9,200.000 $20,000.000 $17,000.000
HPPM-RIB W/RET REQ TYI(W)6"(SLD)100MIL
LF 2,584.000 $1.000 $1.400 $1.400
HPPM-RIB W/RET REQ TYI(Y)6"(SLD)100MIL
LF 2,584.000 $1.000 $1.400 $1.400
Totals: $6,960,034.500 $8,376,282.190 $10,478,530.007